1. OT = 450 minutes
a. Minimum cycle time = length of longest task, which is 2.4 minutes.
Maximum cycle time = task times = 18 minutes.
b. Range of output:
c.
d.
e. Potential output:
(1)
(2)
2.
0.6
c
0.5
f
1.4 0.5 0.7 0.5
a b d h
1.0
g
0.8
e
Solutions (continued)
Solutions (continued)
120 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
c.
3.
3 2 4
a b c
7 4 9 5
d e h i
5 6
f g
Desired output = 4
Operating time = 56 minutes
II D 7 7 B, E
B 2 5 C
C 4 1 –
III E 4 10 H
H 9 1 –
IV I 5 9 –
II G 6 8 A, E
A 3 5 B,E
B 2 3 –
III C 4 10 E
E 4 6 –
IV H 9 5 I
I 5 –
122 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
c.
Solutions (continued)
4. a, b
a. l. c
a b d
h
e f g
II d D 0.0 0.0
G 0.2 0.2
IV h H 0.1 0.1
0.6
3.
124 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
Solutions (continued)
b. 1.
3.
4.
5. a.
1.2
.2
.2 .4 f
c
a b
1.0
1.2
.4 g
e
d
c.
d.
Task Number of following tasks
A 4
B 3
C 2
D 2
E 1
F 1
G 0
II E 1.2 0.8 –
IV G 1.0 1.0 –
e.
6. a.
(1,2)
0.1 0.2 0.9 0.6
a b c d
(3.9) (3.8) (3.6) (2.7)
0.1 0.2 0.4 0.1 0.2 0.7
e f g h i j
(2.2) (2.1) (1.9) (1.5) (1.4) (1.2)
(0.2) l 0.2
126 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
Solutions (continued)
b. Using both the greatest positional weight and the greatest number of following tasks rules
result in the following balance.
Assembly Line Balancing Table (CT = 1.5 minutes)
Feasible tasks
Work Station Task Task Time Time Remaining
Remaining
I A 0.1 1.4 B
B 0.2 1.2 C
C 0.9 0.3 E
E 0.1 0.2 –
II D 0.6 0.9 F
F 0.2 0.7 G
G 0.4 0.3 H
H 0.1 0.2 I
I 0.2 – –
K 0.3 0.5 L
L 0.2 0.3 –
g
7. a.
a b c
h i j
d e f
Minimum cycle time = maximum task time = 45 seconds (results in 560 units of production)
c.
d.
Task Number of followers *PW
A 6 106
B 5 61
C 4 50
D 4 106
E 3 56
F 2 30
G 2 31
H 2 29
I 1 19
J 0 10
*Positional weight
CT = 50 seconds
Feasible tasks
Work Station Task Task Time Time Remaining
Remaining
I A 45 5 –
II D 50 – –
III B 11 39 C, E
E 26 13 C, F
C 9 4 –
IV G 12 38 H, F
F 11 27 H
H 10 17 I
I 9 8 –
128 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
V J 10 40 –
e.
8.
b g h
a c e j k m
d f i
b.
c. Positional
Tasks Weight
a 8.5
b 4.6
c 4.4
d 4.2
e 3.2
f 3.5
g 1.9
h 1.5
i 2.5
j 2.0
k 1.2
m .3
130 Operations Management Second Edition (AGE) © 2014 McGraw-Hill Education (Asia)
Solutions (continued)
Feasible tasks
Work Station Task Task Time Time Remaining
Remaining
I a .5 1.5 b, c, d
b 1.4 .1 –
II c 1.2 .8 d, e
d .7 .1
e .5 .5 i, g
i .5 0 –
IV j .8 1.2 g
g .4 .8 h
h .3 .5 –
k .9 1.1 m
m .3 .8 –
Total idle time = .1 + .1 + 0 + .5 + .8 = 1.5 minutes