CAT-Z LOTO SPECIFIC PROCEDURE, RISK ASSESSMENT & CONTROL MEASURES - PRCS RECLASSIFICATION - STEAM

TUNNEL
Equipment/Type/Name: Steam Tunnel Manufacturer: Lenoard Vision
Model/Description/Number: V35GH Serial Number: V10812GC
Only AUTHORIZED partners are allowed to perform LOTO.
All OTHER/AFFECTED partners must not attempt to start, energize, or use this machine while it is locked out.
Partners who do not comply with this procedure will be subject to disciplinary actions and/or termination.
Select All Hazardous Energy Sources for Equipment Select All Potential Stored Energy for Equipment
Electric 460/480V x Steam Air pressure
Electric 208/230/240V x Gas x Steam Pressure
Electric 120V x Stored Electricity
x Other Electric x Thermal Heat
Compressed Air Chain or Belt Tension
Special Instructions Fully understand the scope of work to be performed before starting.

All energy sources selected above shall be isolated, tried and locked prior to performing
work/maintenance on this equipment/task. If work is performed while either the equipment is elevated or
a piece of the equipment is positioned such that it presents potential stored energy, all potentially
hazardous stored or residual energy shall be relieved, disconnected, restrained, and otherwise rendered
1) Isolation
safe. All hazards exposed by equipment/components/doors in a raised state, items with elevated heat,
capacitors, drive mechanisms, tension to belts/chains/springs and any other potentially hazardous stored
energy must be rendered safe before performing work.

Isolation Locations & Control Methods


Energy Source Isolation ID/Location Method & Devices Energy Release/Confirm
Turn off, affix device, hasp & lock Attemp to start, confirm via LDL dependant on
1.) Electrical disconnect Frount Panel - Blue/White
task
2.) Steam 1 - Upstream Valve Close upstream valve before bleed valve, affix Attempt to start, confirm at gauge
lock
Open bleed valve affix lock Attempt to start, confirm at gauge
3.) Steam 2 - Bleed Valve

4.) Steam 3 - Downstream Valve Close downstream valve after bleed valve, affix Attempt to start, confirm at gauge
lock
Close valve, affix device. hasp & lock Attempt to start, confirm at gauge
5.) Gas Frount Left 2 Yellow

#N/A #N/A
6.)

#N/A #N/A
7.)

#N/A #N/A
8.)

Potential Stored Energy


1.) #N/A
2.) Gas Pressure Isolate gas sources then manually request supply from the machine controls and confirm at gauge.
3.) Steam/Condensate Pressure Open steam bleed valve located between steam valves;
4.) Stored Electricity Stored electricity in capacitors will disipate within a few minutes of shutdown, verify before work
Surfaces may be hot - wait to be cooled before working with. Check with infared meter or gloves.
5.) Thermal Heat

Post on machine next on control panel and keep copy in LOTO binder. June 2018