SCHEDULE FOR INSTALLATION OF TWO PASSENGER ELEVATOR FOR SHOWA HOMES REAL

ESTATE, BULBULLA PROJECT

ACT. No ACTIVITIES START DATE RESPONSIBLE REQUIREMEN PRECEEDING


FOR THE T FOR ACTIVITY
ACTIVITY COMPLETING
THE ACTIVITY
1 Setting 17/10/2023 CONTRACTOR
template and
plumbing
works
2 Chiseling CLIENT
works on the
wall if there is
any as per the
plumb
3 Guiderail CONTARACTOR
bracket
installation for
CAR and CWT
4 Installation of CONTRACTOR
guiderails
(CAR and
CWT)
5 Adjustment CONTRACTOR
for Guiderail
Alignment
Civil work for CLIENT
building
machine
room
6 Machine CONTRACTOR
devices
installation
(Motor, Motor
drive,
Controller and
ETC)
7 Landing door CONTRACTOR
installation
(Door sill,
Door frame,
Door
mechanism,
Door panel
and Toe
guard)
8 Disassemble CLIENT
last two floor
scaffolding
9 Travelling CONTRACTOR
cable
installation
10 Installation of CONTRACTOR
rope with all
the
accessories
11 Compensation CONTRACTOR
chain
installation
12 Install CWT
with fillers
13 Installing
speed
governor rope
14
15 Installation of
shaft wiring
(machine
room,
hoistway, pit
and top of
car)
16 Landing door
and car door
adjustment
17 Installation of
position
sensor
18 Installation of
hall call
button and
decorative car
features)
19 Start up for
inspection
drive
20 Start up for
normal drive
21
22
23
24
25
26
27
28
29
30