You are on page 1of 7

325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ...

Page 1 of 7

Shutdown SIS

Previous Screen

Product: EXCAVATOR
Model: 325 L EXCAVATOR 2SL00680
Configuration: 325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY 3116 ENGINE

Disassembly and Assembly


SUPPLEMENT FOR 3116 ENGINE 325, 325L, & 325N EXCAVATORS
Media Number -SENR5523-00 Publication Date -01/02/1992 Date Updated -12/10/2001

Governor Control Motor


SMCS - 1265-017; 1265

Remove & Install Governor Control Motor

1. Open right access door.

2. Remove four bolts (1).

3. Remove cover (2).

4. Disconnect electrical connection (3).

5. Remove three bolts (4).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 2 of 7

6. Aside governor control motor (5).

NOTE: At this point the accelerator and decelerator cables at the governor and the four clips on the
left side of the engine can be disconnected. Then the entire governor control motor assembly can be
removed.

NOTE: For installation of the governor control motor, reverse the removal steps.

Disassemble & Assemble Governor Control Motor


Start By:

a. remove governor control motor

NOTE: This disassembly and assembly procedure is shown only to show the disconnection of the
accelerator and decelerator at the governor control motor. Governor control motor assembly is now
serviced as a unit.

1. Remove two screws (1).

2. Remove cover (2).

3. Disconnect two wires (3). Mark or identify for later assembly.

4. Remove two screws (4).

5. Remove motor assembly (5).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 3 of 7

6. Remove planetary (6).

7. Remove wheel ring (7).

8. Remove ring gear (8).

9. Turn assembly over.

10. Remove four screws (9).

11. Remove cover (10) and (11) with gasket.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 4 of 7

12. Remove three screws (12).

13. Carefully remove two screws (13) (not shown) from micro switches (14). There are two micro
switches.

14. Slide rubber boots from cables (15) to expose spring cable tighteners at end of springs. Remove
spacers at the end of the springs.

15. Carefully lift out the electrical unit (16).

16. Remove two rubber isolators (18) for micro switches.

17. Remove planet carrier (19).

18. Remove three planet gears (17).

19. Disconnect cable ends (15) located in housing (21) from ring gear (20).

NOTE: The following steps are for the assembly of the governor control motor.

20. Install cables (15) into housing (21).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 5 of 7

21. Attach the cables to ring gear (20).

22. Lightly grease planet gears (17) and space equally in ring gear as shown.

23. Install planet carrier (19).

24. Position isolators (18) in place.

25. Put screws (13) in both micro switches (14) and install electrical unit (16).

NOTE: Make sure isolators are in position.

26. Tighten four micro switch screws (13) very lightly.

27. Tighten three screws (12) very lightly.

28. Install spacers and rubber boots on cables (15).

29. Install rubber gasket, plate (11) and plate (10).

30. Tighten four screws (9).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 6 of 7

31. Turn assembly over.

32. Housing (21) ready to assemble motor components.

33. Motor (5), carrier and planet gears (6), metal ring (7), and ring gear (8) shown before assembly.

34. Install ring gear (8). Mesh this gear with planet gears (17).

35. Install metal ring (7).

36. Install planetary (6).

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020
325, 325 L AND 325 LN EXCAVATORS 2SL00001-UP (MACHINE) POWERED BY ... Page 7 of 7

37. Install motor (5). Mesh motor gear with planetary (6).

38. Install two screws (4).

39. Connect electrical wires (3).

40. Install new gasket and cover (2).

41. Install two screws (1).

End By:

a. install governor control motor

Copyright 1993 - 2020 Caterpillar Inc. Wed Dec 23 21:31:28 UTC+0300 2020
All Rights Reserved.
Private Network For SIS Licensees.

https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisweb... 23/12/2020

You might also like