You are on page 1of 2

SL. NO. ZONE / ITEM UNIT UOM WT. AS PER B.B.

U SERVICE BILL
1 BELT CONVEYOR CC-1AAA (100 TPH) STR MT 36 TOTAL WT. 3175.959
2 STRUCTURE (SCREEN HOUSE) STR MT 65.641 NEW WT. ADDED 381.9056
3 BELT CONVEYOR CC-2AAA (100 TPH) STR MT 48 GRAND TOTAL WT. 3557.865
4 STRUCTURE (BRIQUETTING BUILDING) STR MT 270
5 BELT CONVEYOR CC-6AAA (20 TPH) STR MT 30
6 TRANSFER HOUSE TH-1 STR MT 25
7 STRUCTURE (BRIQUETTING SHED) STR MT 180
8 YARD CONVEYOR CC-6BBB (20 TPH) STR MT 12
9 TRIPPER CAR SUPPORT STRUCTURE STR MT 40
10 D1 &D2 STR MT 2
11 FURNACE BUILDING & CAST HOUSE STR MT 2350
12 FD COOLER STRUCTURE STR MT 20
13 BAG HOUSE STRUCTURE STR MT 37
14 GCP DUCTING / CHIMNEY STR MT 173
15 SCREEN HOUSE STRUCTURE STR MT 111
16 DAY BIN BUILDING STRUCTURE STR MT 150.728
17 CONVEYOR C-1 STR MT 77.24
18 CONVEYOR C-3 STR MT 123
19 CONVEYOR C-5 STR MT 158
20 LCSS-4 ROOF STRUCTURE STR MT 19.33
21 GROUND HOPPER STRUCTURE STR MT 16
22 PUMP HOUSE ROOF STRUCTURE STR MT 8.429
3952.3656

You might also like