MD-216-2500-QD-IX-ITP-1001- C01
PROPRIETARY & CONFIDENTIAL: This document and the information contained herein is Ma’aden and Outotec Oyj/Larsen & Toubro proprietary know-how. This document or any part thereof should not be reproduced,
stored in a retrieval system or transmitted by any means, electronic or otherwise, or divulged without prior written permission from Ma’aden and Outotec Oyj/Larsen & Toubro.
1 of 1
MD-216-2500-QD-IX-ITP-1001-C01 Page 2 of 5
Inspection and Test Plan (ITP) No: Related requirements reference, when applicable (Manufacturing/
installation/specification/design):
L&T DOC NO – 019045-001-X-K-00500-420-R1
HCIS Sec-02 Security Fencing System and MD-101-SMPM-PM-QA-GUI-
0002 (Clause-18)
Project: Mansourah Massarah Gold Project Contract No/ Title: Explosive Magazine Project – MMGP/IK
Contractor Name/Contact Details: Equipment/ Work Package/ Activity Description:
EPC – Larsen & Toubro HCIS Fence Installation
Remarks: P – Performance, Executing an activity
HP – Hold Point, a point beyond which work shall not proceed without
inspection/approval of representative of indicated party
WP – Witness Point, representative of indicated party must be notified, if not
in attendance at specified time, inspection may proceed
S – Surveillance, representative of indicated party may carry out surveillance
of work in progress
R – Review, representative of indicated party to review submitted
documents, result of tests etc.
Prepared By (L&T) Reviewed By (L&T) Approved By (L&T) OT Approval, Date Employer Approval, Date
Page: 1 of (3)
MD-216-2500-QD-IX-ITP-1001-C01 Page 3 of 5
Contractor
QC activity Method Inspection / Test Criteria/ Reference
Employer
Outotec
Notified
Specification Date
Body
Drawing
L&T
1. Material Approval Incoming Material Approval
1.1. CAT-01 and CAT-03 Advacon Visual and MTC Prior to start work HCIS-Sec-02 and P HP - R - Incoming Material
Fencing Material Review HCIS Approval Inspection Report
and MTC
2.2.2 Concrete Work Advacon Laboratory For all fence post IFC Drawings and P W - R - Inspection
Testing foundation HCIS-Sec-02 P Checklist-HCIS-
ADV-IC-001 &
Test Report
Page: 2 of (3)
MD-216-2500-QD-IX-ITP-1001-C01 Page 4 of 5
2.2.3 Grout Work Advacon Visual Inspection For all fence post IFC Drawings and P W - R - Inspection
foundation HCIS-Sec-02 P Checklist-HCIS-
ADV-IC-001
2.3 Inspection for Fence Advacon Visual Inspection After the completion IFC Drawings and P W - R - Inspection
Fabric and Accessories of the fence fabric HCIS-Sec-02 P Checklist-HCIS-
and other ADV-IC-001
accessories
2.3.1 Final Inspection for Advacon Visual check for all completed IFC Drawings and P HP - R - Inspection
Category – 1 Fence length of fence for HCIS-Sec-02 Checklist-HCIS-
each type ADV-IC-001
2.3.1 Final Inspection for Advacon Visual check for all completed IFC Drawings and P HP - R - Inspection
Category – 3 Fence length of fence for HCIS-Sec-02 Checklist-HCIS-
each type ADV-IC-001
Page: 3 of (3)
MD-216-2500-QD-IX-ITP-1001-C01 Page 5 of 5
ADDITIONAL INFORMATION/COMMENTS:
HCIS-ADV-IC-001