Professional Documents
Culture Documents
REINFORCEMENT WORKS
MD-216-1000-QD-IX-ITP-1003
PROPRIETARY & CONFIDENTIAL: This document and the information contained herein is Ma’aden and Outotec Oyj/Larsen & Toubro proprietary know-how. This document or any part thereof should not be reproduced,
stored in a retrieval system or transmitted by any means, electronic or otherwise, or divulged without prior written permission from Ma’aden and Outotec Oyj/Larsen & Toubro.
Inspection and Test Plan (ITP) No: Related requirements reference, when applicable (Manufacturing/
installation/specification/design):
L&T DOC NO – 019045-001-X-K-00098-003 R4
Employer Manual:MD-101-SMEM-EG-ST-SPC-0005,0006 and MD-101-
SMPM-PM-QA-GUI-0002 (Clause-18)
Project: Mansourah Massarah Gold Project Contract No/ Title: 17-PME MM GP-0002 IK
Contractor Name/Contact Details: Equipment/ Work Package/ Activity Description:
EPC – Larsen & Toubro Reinforcement Works
Remarks: P – Performance, Executing an activity
HP – Hold Point, a point beyond which work shall not proceed without
inspection/approval of representative of indicated party
WP – Witness Point, representative of indicated party must be notified, if not
in attendance at specified time, inspection may proceed
S – Surveillance, representative of indicated party may carry out surveillance
of work in progress
R – Review, representative of indicated party to review submitted
documents, result of tests etc.
Prepared By (L&T) Reviewed By (L&T) Approved By (L&T) OT Approval, Date Employer Approval, Date
Page: 1 of (3)
MD-216-1000-QD-IX-ITP-1003-C01 Page 3 of 4
Process Description or QC Responsible Inspection or Test Frequency of Acceptance Criteria Date QC Record Reference
Contractor
Employer
activity Method Inspection / Test
Outotec
Notified
Specification
Body
L&T
Drawing
Page: 2 of (3)
MD-216-1000-QD-IX-ITP-1003-C01 Page 4 of 4
Process Description or QC Responsible Inspection or Test Frequency of Acceptance Criteria Date QC Record Reference
Contractor
Employer
activity Method Inspection / Test
Outotec
Notified
Specification
Body
L&T
Drawing
3.2. Check all cross-sections L&T Visual and Prior to each 1. MD-101- P H R WP - Bar Bending Schedule-
of bars are tied properly Dimensional concrete pour SMEM-EG-ST- P L&T-MMGP-CIVIL-05,
with right gauge and Checks SPC-0005, Concrete Pour Card-
annealed wire as per Clause No-4.2.1, L&T-MMGP-CIVIL-06.
specification 4.2.2,
2. SBC-304-
2018,
3. ACI-315R-18,
4. ACI-318R-14
3.3. Check for proper cover, L&T Visual and Prior to each 1. MD-101- P H R WP - Bar Bending Schedule-
spacer bars & chairs Dimensional concrete pour SMEM-EG-ST- P L&T-MMGP-CIVIL-05,
after the reinforcement Checks SPC-0005, Concrete Pour Card-
cage has been put Clause No-4.2.1, L&T-MMGP-CIVIL-06.
inside the form work 4.2.2,
2. SBC-304-
2018,
3. ACI-117R-14,
4. ACI – 301R-
16,
5. ACI – 315R-
18,
6. ACI-318R-14
Page: 3 of (3)