INSPECTION REPORT ITT-1808-FABCON-
IR-007-Rev.0
1. Delivery Date:
2. Attendees:
3. Safety check points:Result column must be filled in with: Pass (P) or Fail (F)
Topics (If negative result of one of below questions, please contact immediately JZHC personnel before starting the inspection activity) Result
1. Have you been trained about vendor H&S culture/risks/countermeasure? P
2. Are all personnel using appropriate PPE and working safely? P
3. Did you fall into near miss during inspection? If yes, please detail it/them into below general note section. P
4. Other safety concerns/notes if any: Nil
4. Scope of Inspection: (Result column must be filled in with: Pass (P), Fail (F) or Punch list point open (PLO).)
Task N°
9. Inspection Result:
14. PHOTOS:
***REPORT END***