Professional Documents
Culture Documents
MD-216-1000-QD-IX-ITP-1039-C01
PROPRIETARY & CONFIDENTIAL: This document and the information contained herein is Ma’aden and Outotec Oyj/Larsen & Toubro proprietary know-how. This document or any part thereof should not be reproduced,
stored in a retrieval system or transmitted by any means, electronic or otherwise, or divulged without prior written permission from Ma’aden and Outotec Oyj/Larsen & Toubro.
1 of 1
MD-216-1000-QD-IX-ITP-1039-C01 Page 2 of 4
Inspection and Test Plan (ITP) No: Related requirements reference, when applicable (Manufacturing/
installation/specification/design):
L&T DOC NO – 019045-001-X-K-00500-226 R2
Employer Manual:MD-101-SMEM-EG-ST-SPC-0003 and MD-101-SMPM-
PM-QA-GUI-0002 (Clause-18)
Project: Mansourah Massarah Gold Project Contract No/ Title: 17-PME MM GP-0002 IK
Contractor Name/Contact Details: Equipment/ Work Package/ Activity Description:
EPC – Larsen & Toubro Cementitious Grouting Works
Remarks: P – Performance, Executing an activity
HP – Hold Point, a point beyond which work shall not proceed without
inspection/approval of representative of indicated party
WP – Witness Point, representative of indicated party must be notified, if not
in attendance at specified time, inspection may proceed
S – Surveillance, representative of indicated party may carry out surveillance
of work in progress
R – Review, representative of indicated party to review submitted
documents, result of tests etc.
Prepared By (L&T) Reviewed By (L&T) Approved By (L&T) OT Approval, Date Employer Approval, Date
MD-216-1000-QD-IX-ITP-1039-C01 Page 3 of 4
Process Description or QC Responsible Inspection or Test Frequency of Acceptance Criteria Date QC Record Reference
Contractor
Employer
activity Method Inspection / Test
Outotec
Notified
Specification
Body
L&T
Drawing
3.2. Grouting Mix L&T Visual Checks Each Pour 50C - 320C or as P H R R - Grouting Pour Card-
Temperature per manufacturer P L&T-MMGP-CIVIL-56,
specification
MD-216-1000-QD-IX-ITP-1039-C01 Page 4 of 4
Process Description or QC Responsible Inspection or Test Frequency of Acceptance Criteria Date QC Record Reference
Contractor
Employer
activity Method Inspection / Test
Outotec
Notified
Specification
Body
L&T
Drawing
3.3. Placement and Curing L&T Visual Checks Each Pour 1. MD-101- P H R R - Grouting Pour Card-
SMEM-EG-ST- P L&T-MMGP-CIVIL-56,
SPC-0003,
Clause No -
6.1.2, 6.1.3 and
6.3
3.4. Sampling for L&T Laboratory Testing Two Sets of Three 1. MD-101- P H R R - Grouting Pour Card-
Compressive Strength Test Cubes (24Hrs, SMEM-EG-ST- P L&T-MMGP-CIVIL-56,
7Days and SPC-0003,
28Days)- Clause No -7.1.2
One Set- Field Cure
One Set – Lab Cure