Professional Documents
Culture Documents
Bki Rina Abs NDT Extent Calculator Rev1
Bki Rina Abs NDT Extent Calculator Rev1
Extent, 0.6L
Author:
ABS Rule requires the L to be
96% of Waterline at 85% of t
Moulded Depth. For the case
Barge Design, the Rule Length
effectively taken as
Overall Length x 96%
n in Red Font
ABS [0.6L]Minimum Quantity of Check_Points [for RT, X-ray Films]Input
In Metric Barge Principal Dimensions
n = L(B +D)/46.5 LOverall 300 ft 91.44 m
Where Bm 80 ft 24.38 m
n is Minimum Number of Checkpoints [For RT, X-ray Films] Dm 18 ft 5.49 m
L is Length between Perpendiculars L (m) Metric [SI or MKS]
B is the Greatest Moulded Breadth (m)
D is Moulded Depth (m) at L/2 Checkpoints Calculation [for RT, Qty of X-rays]
In Imperial n 57
n = L(B+D)/500 Imperial [US]
n 57
Author:
ABS Rule requires the L to be equal to
96% of Waterline at 85% of the
Moulded Depth. For the case of Typical
Barge Design, the Rule Length L can be
effectively taken as Barge Weight Estimator
Overall Length x 96%
M4 M3 M2 M1 B
147.623 53.0462 16.99142 2.878533 -2303.975
12.70502 7.244693 0.63576 0.46396 140.2071
0.991122 32.03702 #N/A #N/A #N/A
1172.182 42 #N/A #N/A #N/A
4812371 43107.56 #N/A #N/A #N/A
T, Qty of X-rays]
300 84 18 2
Weight of Barge 1,237 T
L B D L_Bhd
300 80 18 2
330 84 20 3
90 21
100
120
ABS/RINA EXTENT of NDT Requirements for Barges & Pontoons
Extent; 0.6L
Author:
Use Lbp for L
n in Red Font
ABS [0.6L]Minimum Quantity of Check_Points [for RT, X-ray Films]Input
In Metric Barge Principal Dimensions [in m]
n = L(B +D)/46.5 L 26.00 m
Where Bm 8.00 m
n is Minimum Number of Checkpoints [For RT, X-ray Films] Dm 3.65 m
L is Length between Perpendiculars L (m) Metric [SI or MKS]
B is the Greatest Moulded Breadth (m)
D is Moulded Depth (m) at L/2 Checkpoints Calculation [for RT, Qty of X-rays]
n 7
mensions [in m]
T, Qty of X-rays]
BKI NDT Scope Requirements
Scope of NDT [Non-Barge and Non-Pontoons]
Choose Value
Choose Value