1. Introduction:
• In a planned maintenance shutdown it is normal to open the furnace top and ignite the
burden surface.
ISSUED BY : APPROVED BY :
ISSUED DATE :
BLAST FURNACE REF NO :
STANDARD OPERATING PROCEDURES REV NO : 00
OF BLAST FURNACE DEPARTMENT AMD NO : 00
EFF. DATE :
A positive a++itude TITLE: TOP LIGHT UP Page: 2 of 7
• This will allow venting of the furnace top and raw gas system, enabling access to the BLT
and dust catcher.
• Top Firing is a safe practice for maintenance job at furnace top and gas line.
2. Description of activity:
ISSUED BY : APPROVED BY :
ISSUED DATE :
BLAST FURNACE REF NO :
STANDARD OPERATING PROCEDURES REV NO : 00
OF BLAST FURNACE DEPARTMENT AMD NO : 00
EFF. DATE :
A positive a++itude TITLE: TOP LIGHT UP Page: 3 of 7
Ensure that the materials required for top firing like wood, cotton waste, match box, LDO and
prepare torch should be shifted to furnace top prior to shut down.
After shut down keep open the relief valve, bleeder valves, back draft valve, USV, UMG.
Close the primary & secondary equalization valves, LMG, LSV and dust catcher cut off valves.
All tuyeres must be plugged with hydrous clay except one tuyere.
Nitrogen Cooling of BLT gear box to be stopped.
Ensure all bolts from the access manhole are removed. This process may start after the furnace
has been shut down, leaving 1 of bolt firmly in place.
Turn off the N2 purging at the furnace top and open the door. No personnel should stand directly in
front of the door or in a position to be struck by the door in the event of an explosion.
Throw a torch made with wood &cotton through the door to ignite the burden surface.
Exercise with great care, to see if the burden has ignited, if not, then throw in another torch.
If the burden still does not light, throw in torches till there is definite ignition of gas taking place.
Draft the furnace, dust catcher and down comer. This process will remove nitrogen from these
vessels and allow entry for maintenance purposes. Note – the atmosphere should be tested for
oxygen depletion before entry into any vessel or confined space.
Safety Considerations
Top Firing can be a hazardous process, with potential for flames from openings in the top and
projection of material from tuyeres. All non-essential personnel should be cleared from the top area.
Those involved in the process should be well protected by safety equipment and have a monitor
capable of detecting both CO and O2 gasses.
All personnel should be cleared from the tuyere area and lookouts / barricades erected to keep
people out until the top firing is complete. Ensure adequate supply of torches is available. A
minimum of 5 torches may be required.
6. Emergency preparedness:
.
A) In case of problem in top firing:
a) Inform to Shift in charge.
b) Don’t give any clearance to start the shut down jobs
Also please refer the EPP for the gas leaks and fire
Prepare fire incident report and send it to fire control room for detail investigation to avoid
such type of fire in future.
Responsible person:
ISSUED BY : APPROVED BY :
ISSUED DATE :
BLAST FURNACE REF NO :
STANDARD OPERATING PROCEDURES REV NO : 00
OF BLAST FURNACE DEPARTMENT AMD NO : 00
EFF. DATE :
A positive a++itude TITLE: TOP LIGHT UP Page: 6 of 7
Depute one person continuously to monitor the top firing. If it got off immediately light it again.
The presence of CO gas is to be monitored continuously, if it exceeds 50ppm purge the system
again. For the time being remove all persons involved in the job till gas level becomes low’
14. Engineering Change notes - Records to be maintained with proper approvals and formats .
a) All the engineering changes shall be approved on prescribed format from HOD with proper
reasons for changes; P & ID s shall be revised and documented.
b) After changes being made, rewrite the SOPs and revised documents shall be issued to
respective control rooms.
ISSUED BY : APPROVED BY :
ISSUED DATE :
BLAST FURNACE REF NO :
STANDARD OPERATING PROCEDURES REV NO : 00
OF BLAST FURNACE DEPARTMENT AMD NO : 00
EFF. DATE :
A positive a++itude TITLE: TOP LIGHT UP Page: 7 of 7
17. Documents would be reviewed and authorised person for the change in SOPs .
a) Head of the department / Blast Furnace Operation In charge.
b) SOP Shall be reviewed every 2 years and record shall be maintained.
ISSUED BY : APPROVED BY :
ISSUED DATE :