You are on page 1of 1

DOC. NO.

: WI/MR/18
DIAMOND TITLE: WORK INSTRUCTION FOR RADIAL
INDUSTRIES DRILLING AND REAMING (M/C)
PG. NO. : 01 of 01

SR. NO. PARAMETER DOC/REC NO.


01 Clean the area before work start. 5 S check list

02 Ensure the oiling to spindle done. M/C daily


check list
03 Everfy the process plan is availalble on machine.
04 Take a require Gauges from shift supervisor before start the work.

05 Before start the work verify the reamer and drill size from shift supervisor.

06 Ensure the drill and reamer did not be bend are broken.

07 In-process material ok as per require availablelity.

08 Frist pice should be take a approval from shift supervisor are Q.A. person. QF/QA/07

09 In-process material should be checked by shift supervisor are Q.A. person


as per define pertoling inspection plan.
10 If defect piece observed in process keep the part seprate bin with
identified area. Are bin.
11 If machine start the more noise then regular noice then infrom to the shift QF/MNT/01
superviosr.
12 After completion of work keep the area clean and shift the ok material to
next process.
13 After completing the shift instruments and gauges hand over to the

14 After completion of work clean the area and switch off the power supplie

REV. NO.: 00
REL DT. : 01/05/2018 PREPARED BY – MR APPROVED BY – CEO