A. FOUNDATION

Type of Foundation Open Foundation

Type of Footing Pad Footing

Bit Size 3’-6” x 3’ -6”

Depth of Excavation 5’

Sand Filling Height 3”

PCC Height 9”
Cement, MSand, 40mm
PCC Material
Metal
PCC Ratio 1:3:6

RCC Footing Height 9”

RCC Ratio 1:2.5:3.5 by Volume


Cement, MSand, 20mm
RCC Materials
Metal
Using 10mm TMT Bar both
Footing Mat
side with 6” c2c.

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
B. RCC COLUMN

Size 12” x 8”

No. of Columns As per Structural Design

No. of Rods 6 Nos.

Size of the Rods 4 x 12mm & 2 x 10 mm

Stirrups 8mm.

Stirrups Spacing 7”

RCC Ratio 1:2.5:3.5 by Volume


Cement, MSand, 20mm
RCC Materials
Metal
Rod Lapping Length 18”

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
C. BASEMENT DETAILS

Height of the Basement 3’

Height of Beam 1’

Height of Wall 1’7.5”

Height of Floor Beam 4.5”

Filling Inside the Basement Gravel

Filling Height 2’7.5”

PCC Height 4.5”


Cement, MSand, 40mm
PCC Material
Metal
PCC Ratio 1:2.5:5

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
D. RCC BEAM

Size 12” x 8”

No. of Rods 5 Nos.

No. of Bottom Rod 3 Nos

No. of Bottom Rod 2 Nos

Size of the Rods 5Nos x 12mm

Stirrups 8mm.

Stirrups Spacing 7”

RCC Ratio 1:2.5:3.5 by Volume


Cement, MSand, 20mm
RCC Materials
Metal

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
E. FLOOR BEAM & LINTEL BEAM

Size 4.5” x 8”

No. of Rods 4 Nos.

No. of Bottom Rod 2 Nos

No. of Bottom Rod 2 Nos

Size of the Rods 4Nos x 10mm

Stirrups 8mm.

Stirrups Spacing 7”

RCC Ratio 1:2.5:3.5 by Volume


Cement, MSand, 20mm
RCC Materials
Metal

F. LOFT & SUNSHADE

Thickness of Roof Slab 2”

Main Rod 10mm

Distribution Rod 8mm

Spacing 6”

RCC Ratio 1:2.5:3.5 by Volume

Cement, MSand, 20mm


RCC Materials
Metal

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________

G.ROOF CONCRETE

Thickness of Roof Slab 5”

Main Rod 10mm

Distribution Rod 8mm

Spacing 6”

RCC Ratio 1:2:3 by Volume

Cement, MSand, 20mm


RCC Materials
Metal

H. BRICK WORK & PLASTERING

9” & 4.5” as per proposed


Size of Wall
diagrams

Mortar Materials Cement & MSand

Mortar Ratio 1:5.5

Plastering Materials Cement & PSand

Mortar Ratio 1:5

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________

I. GENERAL MATERIALS

Cement UltraTech/ Dalmia

Brick Flyash Brick

TMT Rods PULKIT Brand – Fe550D

Sand Karur MSand & PSand

Metal Karur Metals

J. TILES

4’X 2’ for Hall


Size of Flooring Tiles 2’ X 2’ for Bed Rooms
1’ X 1’ for Rest Rooms
Size of Wall Tiles 18” x 12”

7’ from ground for Rest Rooms


Height of Wall Tiles
4’ above from Kitchen top for Kitchen
Brand & Design As per Clients Wish
For Hall Flooring – Max of Rs 60./Sq.Ft
Max Budget For Other Flooring – Max of Rs. 45/Sq.ft
For Wall Tiles – Max of Rs. 35/Sq.ft
Granite Top - Budget of Max Rs120/ Sq.Ft
Kitchen Top & Kitchen Sink
Stainless Steel Sink -Budget of Max Rs 2500.

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
K. CARPENTARY

Main Door Frame 5” x 4” Teak wood Frame (I Quality)

Readymade Single Teak Wood Door with the


Main Door
budget of Rs 15000/-

Bed Room Door Frame 4” x 3” Teak wood Frame (II Quality)

Bed Room Door Readymade Membrane Door – Budget of Rs 3000/-


UPVC Single Sliding White Colour
Window & Shutter
Dindigul Brass 6 lever lock with brass handle,
Main Door Fittings aldrops, hinges, tower bolts will be fitted for Main
Door
Mortise lock with SS handle, aldrops, hinges, tower
Bed Room Door Fittings bolts will be fitted for Bed Room Doors.

H. ELECTRICAL

Wire Finolex
1Sq.mm for Points & Earth
Wire Size 1.5 Sq.mm for Inverter Supply
2.5 Sq.mm for Circuits, AC, Geyser.
Switches GM Brand Modular
6A Switch & Sockets for Points like fan & lights.
Switch Details 20A Switch & Sockets for Geyser, Refrigerator, AC, Mixer.

Each points in every bed room


AC Points

UPS Points 1 Light and Fan in Each Room.


Distribution Readymade Single Phase Box with sufficient MCB will be provided
Box

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________
I. PLUMBING

Pipes & Pipeline


Avonplast
Fittings
1” UPVC for cold Water Line & ¾” CPVC for Hot Water Line
2.5” PVC for Waste Water Line
Size of Pipes
3” PVC for Rain Water Line
4” PVC for Sewage Line
Fittings Jaquar Essco Branded Fittings. (Stainless Steel)
1 – Shower with arm , 1 – Health Faucet, 1 – 2by 1 Angle valve
Fittings Details
for closet, 2 – Short Body tap for Hot and Cold Water.
Jaquar Essco Western closet – Budget of Rs 4200/-
Closets (No Wet and Dry Separation /partition will be provided)

Water Tank 1000 Lit – Avonplast Branded 3 Layer Food Grade Tank.

J. PAINTING

Interior Painting 2 Coat Putty + 1Coat Primer + 2 Coat Colour

Exterior Painting 1 Coat White Wash + 1 Coat Primer + 2 Coat Colour

Putty Asian Smart Care Wall Putty

Primer Asian Interior Primer & Asian Exterior Weather Sheath


Asian Tractor Emulsion for Interior
Colour Asian Ace Emulsion for Exterior

Touch wood Polish for Main Door


Wood & Steel
Enamel for Rest of the Woods
Colour restriction Max of 4 Colours of client’s choice for each Interior and Exterior

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________

Work Included:

Elevation Design. (Tile work of Max 150 Sq.ft)


One Safety Gate for Main Doors. (MS Material)

Cost Estimation.

Particulars Cost per unit Total Cost

Construction Charges for 1368 Sq. ft -GF. Rs. 1800 / Sq. Ft. Rs. 24,62,400

Construction Charges for 300 Sq. ft. -FF Rs. 1800 / Sq. Ft. Rs. 5,40,000

Construction Charges for 138 Sq. ft. -Head


Rs. 1100 / Sq. Ft Rs, 1,51,800
Room for Stairs

C1 -Total (Building Cost) Rs. 31,54,200

Work Not Included in Per Sq. ft Charges:


Additional Elevation Works (Like Additional Tile work, Glass Work)
Electrical Accessories like Fan, Light and Geyser, AC etc….
Compound Wall and Gate related works.
Flooring and Filling Outside the Building. (Plinth Area).
Choke Bit for Sewage and Drainage
Wall Tiles in Bed Rooms and Hall.
Cooling Tiles/ Weather Course in Roof.
Interior and Cupboard Works.

Client Scope:
Bore & Water Supply
EB Supply
Material Shed.
Plan Approval.
EB Monthly Consumption Bill.
Other Administrative Charges like Taxes to Govt., etc…

Plot No 12, Azhagu Nagar, Mutharasanallur – Kudalur Main Road, Kambarasampettai, Trichy 620101.
Er.B.Santhosh Kumar, M.E., (Ph.D)
Ph.No: 7904944478 / 7708657096
s2dconstructionservices@gmail.com
________________________________________________________

Payment Terms - Building Cost


1. 15% of Total Amount - Before Start of Work.
2. 15% of Total Amount - Post Basement Completion for Lintel
3. 20% of Total Amount - Post Lintel Concrete for Roof.
4. 15% of Total Amount - Post GF Roof Concrete for FF work
5. 20% of Total Amount - Post FF Roof for Plastering
6. 10% of Total Amount - Post Plastering for Finishing work
7. 5% of Total Amount - Before House Warming Function.

Payment Terms - Additional Cost


100% of Payment for individual head required before start of respective works.

Time Line with Cost Requirements.

Term Tentative Date Payment Requirements


1 II Week of Mar. Rs. 4,50,000.
2 II Week of Apr. Rs. 5,00,000.
3 II Week of May. Rs. 6,00,000.
4 II Week of Jun. Rs. 5,00,000.
5 II Week of Jul. Rs. 6,50,000.
6 IV Week of Jul Rs. 3,00,000.
7 II Week of Aug. Rs. 1,54,200.
Overall Cost Rs. 31,54,200.

Er.B.Santhosh Kumar, M.E., (Ph.D)

1. if any delay occurs from client side due to any reasons other than pandemic crisis beyond
45 days in between construction tenure, Additional charges will be calculated depends on
market price max up to 10% of remaining amount.
2.The above rate has customized as per approved drawings and all other extra work will be
charged with client concerned.