0% found this document useful (0 votes)
68 views1 page

Detailed Layout Plan for Chemical Facility

This document describes an existing 66kV electrical line that runs from a substation to a building. It provides the length of the line from the substation to a coal yard as 246350 meters and the total length of the line from the substation to the building as 331460 meters.

Uploaded by

Rana krupal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views1 page

Detailed Layout Plan for Chemical Facility

This document describes an existing 66kV electrical line that runs from a substation to a building. It provides the length of the line from the substation to a coal yard as 246350 meters and the total length of the line from the substation to the building as 331460 meters.

Uploaded by

Rana krupal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

EXISTING 66 KV ELECTRICAL LINE

R
WE
TO AMOD

.TO
H.T
PS-0

BUILDING CONTROL LINE

246350.00m.

rth
No
331460.00m.

6.0
m.
W
ID
E
RO

00
40
AD

COAL YARD
PHASE-1 00
60

PQ+3
TREES-2165

PROPOSED 66KV
CL BLOWER

CL CASING

ELECTRICAL LINE
INLET
GAS

AS PER SITE
STATE HIGHWAY

OUTLET
GAS

MEASUREMENT CL. OF CASING


CL. OF BLOWER

394650.00m.

SECURITY-2

4.00m. W I D E WMM R O A D
RAMP WEIGHBRIDGE RAMP
SLOPE

SUMP
500 SQ.x300 DEEP
1428
F.F.L.EL.100.45M

750 W I D E W A L K W A Y
T-16

7.5m. W I D E R O A D

DRAIN 300 MM WIDE x 200 MM DEEP


P-09A P-XXXX PC26
1293 1521 1293

GATE-2 10.5m. W I D E R O A D P-09B


P-08B

P-08A
60KL
ST-XXXX
60KL
ST-XXXX P-XXXX

T-15

1428

DN

UP
DN
F.F.L.EL.100.45M

AIR
COMPRESSOR

PATHWAY + DRAIN PATHWAY + DRAIN PATHWAY + DRAIN HAZARDOUS WASTE PC25

DRAIN 300 MM WIDE x 200 MM DEEP


P-07B
P-XXXX
A B C D E
INSECTICIDE HERBICIDE STORAGE SHED
P-07A
22.2 x 10m 5
60KL 60KL P-XXXX

P-05A

P-05B
ST-XXXX ST-XXXX

SUMP
500 SQ.x300 DEEP
F.F.L.EL.100.45M

PROPOSED BOX 4
F.F.L.EL.100.45M
SLOPE

5.0m Wide Road


P-06A

CULVERT-2 P-06B
F.F.L.EL.100.45M

RO3105
PC24

R.O. WATER PLANT

APPR.18.0M.(L)X3.10M.(W)

750 W I D E W A L K W A Y
5.8 M x 7.0 M
CAP.- 1.5M³/HR
1200 x 1600 1200 x 1600
DRY AIR REC. WET AIR REC.
3
AR-01/C

S/S/E/W
M.H. M.H. M.H.
F.F.L.EL.100.45M
600 600 600
U/G MEE DRAIN TANK T3105A T3105B
6.0 M x 2.5 M x 2.5 M DEEP-33KL 5 KL 5 KL

P3105A

P3105B
LIQUID LEVEL 2.2M HT.
AR-01/B
4.5m. W I D E R O A D

UGP3101SELF PRIMING
PC23
1 DYKE WALL 1.1 M HT.
AR-01/A

MEE AREA PC17 ST02


MIX CONDENSATE TANK
2500 ID x 4500 HT.
ST05
SHELL ID=3600 x 6000 HT.
PEDESTAL
3900 OD x 300 HT.
ST06
SHELL ID=3600 x 6000 HT.
PEDESTAL
3900 OD x 300 HT.
FUTURE
EFFLUENT STORAGE TANK
SHELL ID=3600 x 6000 HT.
PEDESTAL
3900 OD x 300 HT.

750 W I D E W A L K W A Y
PEDESTAL
60 KL 60 KL 60 KL
2800 OD x 300 HT.
M.S.
20 KL

9000
LIQUID FORMULATION

9000 SPACE FOR


AIR COMPRESSOR
& AIR RECIVER
TANK FARM AREA
16.8 x 12m
FGL.EL.100.30M

FORMULATION PLANT T-19/B


FILTER PRESS AREA
10 X 10m
PANEL
PC16
ST04
PURE CONDENSATE
STORAGE TANK
2200 ID x 3000 HT.
PEDESTAL
2500 OD x 300 HT.
M.S.
10 KL
ST03
NaOH STORAGE TANK
2400 ID x 3500 HT.
PEDESTAL
2700 OD x 300 HT.
M.S.
15 KL
ST07
H2SO4 STORAGE TANK
2400 ID x 3500 HT.
PEDESTAL
2700 OD x 300 HT.
M.S.
15 KL
ST01
HCL STORAGE TANK
2300 ID x 2500 HT.
PEDESTAL
2600 OD x 300 HT.
PPFRP
10 KL
PC22

ROOM OFFICE

SLOPE

SLOPE

SLOPE

SLOPE
DT-11 DN
SUMP
DN DN
SUMP
DN
500 SQ.x300 DEEP 500 SQ.x300 DEEP
SLOPE SLOPE FGL.EL.100.30M FGL.EL.100.30M SLOPE FGL.EL.100.30M

T-03 DRAIN 300 MM WIDE x 200 MM DEEP


DT-06 DT-05 DT-04 DT-03 DT-02 DT-01
T-02/C T-02/B T-02/A T-04
T-01/B T-01/A T-19/A
P-10/A

T-19/A
FGL.EL.100.15M

T-19/B UP
FGL.EL.100.15M
FGL.EL.100.15M UP

Dosing Chemical Storage Area UP

P02

P04

P05

P06

P03

P07

P01
P-10/B

Sulphuric HCL
dosing PC7

PC10

PC11

PC12
P-01A

P-01B
dosing

PC6

PC8

PC15

PC18

PC19

PC20
P-02B

P-02A

PC9
PC21
7.5m. W I D E R O A D

750 W I D E W A L K W A Y 750 W I D E W A L K W A Y

750 W I D E W A L K W A Y
SOLID FORMULATION

750 W I D E W A L K W A Y
4.5m Wide Road 4.5m Wide Road

750 W I D E W A L K W A Y PC14

PC5
PC1

PC2

PC3

PC4

ROAD LENGTH-36.50 CHEMICAL


STORAGE
SHED
6.4m x 5.0m
T-09
100.3m

P-03/A
GREEN BELT

DT-09

T-07/C T-08
P-03/B

T-10
DT-08
5.0m Wide Road

5.0m Wide Road


P
Dosing Skid

P-04A AR-01/A
EMPTY DRUM STORAGE &

ET
T-07/B CLEANING AREA
P-04B

AR-01/B
DT-07B

25 x 20m
STP AREA
DT-07A

AR-01/C

E
T-07/A P-03A

R
P-03B

6.00m. W I D E R O A D P-06B

T-11

TU
P-06A
T-13
T-06/B
FU T-12
Dosing Skid

PATHWAY + DRAIN PATHWAY + DRAIN PATHWAY + DRAIN


P-04B

P-04A

DT-07A DT-07B DT-08 DT-09

P-05B

P-05A
P-07A
T-14/A
P-07B

CHEMICAL
STORAGE INCINERABLE WASTE DRUM
T-06/A
STORAGE AREA
T-15 25 x 10m
T-14/B T-14/C T-17/A T-17/B
LAB
T-05 T-16

TOILET
BLOCK
FG STORE

PP+3

DAHEJ TO BHARUCH RAILWAY LINE


282987.45m.

30.00m. WIDE UTILITY CORRIDOR


4.5m. W I D E WMM R O A D
6550
7.5m. W I D E R O A D

12000
4.5m. W I D E R O A D

5000

2947

WORKSHOP
RM STORE M.C.C. ROOM

LAY-OUT PLAN
CABLE RACK FOR TANK FARM
UG EXPLOSIVE TANK
4.5MT. WIDE
ROAD

9000 9000

PATHWAY + DRAIN PATHWAY + DRAIN PATHWAY + DRAIN 6.00 MT. WIDE R O A D


6.00m. W I D E WMM R O A D
3990

6000

THESE RCC COLUMNS ARE CONSIDERED


UP TO EL.111.850 & ABOVE EL.111.850
STEEL STRUCTURE TO BE CONSIDER

GATE-1 7.5m. W I D E R O A D A B' C D E' F

PATHWAY + DRAIN PATHWAY + DRAIN PATHWAY + DRAIN 1


RS

Material
Storage Area
with shed
2
8500X8500
PROPOSED BOX

SCALE - 1 : 10
SLOPE 1:10

CULVERT-1 3
ENTRY B E

APPR.18.0M.(L)X3.10M.(W) FIRE PROOF WALL


4.0MT. W I D E R O A D

SECURITY-1
6.00m. W I D E WMM R O A D
4.5m. W I D E R O A D

4
7.5m. W I D E R O A D

ADMIN
5
WALKWAY

FIRE WATER TANK


CANTEEN
& PUMP HOUSE

3.5MT WIDE ROAD 9

16860
BATTERY BANK

DCDB 10
ERUTUF
RTCC-2
RTCC-1 2-OFART 1-OFART GNIMMOCNI
FUTURE

RTCC ACDB C & R PANEL

DG SET
MM 0081
8560

ROOD

MM009
ROOD
RELPUOC-SUB

1-GNIMMOCNI

1-GNIOGTUO

2-GNIOGTUO

3-GNIOGTUO

4-GNIOGTUO

5-GNIOGTUO

SPACE FOR 11KV


CAP. APFC PANEL

11

55500

TO ROAD
WITHDRAWL DIRECTION

SUBSTATION (CONTROL ROOM)


32710
H.V.SIDE

L.V.SIDE

R
TO DAHEJ

4500

WE

SWITH YARD (FUTURE)


24090

H.V.SIDE

.TO
L.V.SIDE
700 B

700 B

C OF CAP. C OF CAP.
L L
BANK - 3 BANK - 3
700 Y

700 Y

PS+0
R

H.T
B

B
700

700

C LOF CAP. C OF CAP.


L
BANK - 4 BANK - 4
Y

WITHDRAWL DIRECTION
700

700

TO ROAD
R

N = 116470.8052
E = 4921031.1353
133629.95m.

D-3/1/A

You might also like