PDP4 P002 MH CS DDR 1765 - P1
PDP4 P002 MH CS DDR 1765 - P1
29
6
30.02
7
U2 84.42
0
LVL
+450MM
H-POLE
SET
SWITCHUP WITH
YARD GO
D
11KV
METERING
UNIT
ROOM
RAIN
LVL
+450MM 11KV
ISOLATORRMU
/
AREA
WATER
LVL
+450MM
HARVESTING
PIT
E4.2 30.422
80 MM THICK
COMPOUND
+263.76 AS ±00 E4.2 21.448 WITH & 0.90M WALL OF HEIGHT
15000
77500
HIGH BARBED 1.80M
29.876
WIRE
TRUCK PARKING
ENTRY & EXIT 29.200
30.341
80 M &
0.90
MM 0.
B3
TH 90M
B5
ICK H
U13
CO IGH
FROM E.R.L.
LVL+300MM
MP BAR
25.87
OU BE
ENTRY
2040
7
UP
ND D
2020
BORE
WA WIR
1960
E4.1
WELL
0
LL E
TRUCK PARKING
R8.00
1835
4.000
OF
1145
(17 No.)
RAMP UP
0
HE
500 1350 3000 3000 1000 150
.50
R7
IG
0
HT
FUTURE
14.000
.75
R3
2510 MT
PRESENT PRESENT
1910 MT 540 MT
22.000 16.000
Ø2200
TRUCKSCALE ROOM (PITLESS TYPE) U1
9.000
11.000
P4
120°
P6.1.1
UP
9.000
29
.95
FACTORY GATE
6
6.000
12.00 M WIDE
MAIN GATE
ENTRY & EXIT LVL. +150
9.000
9.000
FROM E.R.L. ROAD 9.00 M. WIDE ROAD 9.00 M. WIDE
RAMP
12.000
LVL. +150
1:15 FROM E.R.L.
+263.76 AS ±00 SLOPE 1.20M HIGH
34500
BOOM
BOLLARDS LVL. +600.00 FROM E.R.L.
3 2 1
E
BARRIER 3 Entry
WID
2
1 STAIR:-
6.00 M WIDE UP
WIDTH=1.5
TREAD=0:30
RISER =0.15
RAMP UP
95.850
WICKET GATE B1
M.
1500.0000
Duct-1
B2.3
LVL
+600.00 MM
6.00
Meeting Technical
RAMP UP
LVL. +450 FROM Room-1 Department Men's Washroom-
E.R.L.
AD
Mother's Care
RA
13.200
Room
Duct -2
MP
Washroom
Leadership Room -1
RO
1.75X1.90M
Women's
Changing
UP
Room
Men's Locker
Men's Washrrom Room
Women's Locker
24.906
Leadership Room -2 Room
Handicap
Washroom
3.051 M
Wide Foyer
UP P2.2
30.05
IT Room Prayer Room Women's Duct-1
9.004 LVL +600MM
ASSEMBLY AREA
Washroom FROM E.R.L.
0
WAREHOUSE)
1 2 3
3 2 1
0.200
ZEBRA UP
CROSSING 2385 [Link]. 15000
PAVED AREA
14.670
9.000
U11
HV SIDE
U12 Women's
Washroom
Men's
Washroom
Conference / Idex Room
D1
00
2000kVA
2500kVA
9.0
O/G-2 (FUTURE)
11KV VCB
11KV VCB
INCOMER
O/G-1
11KV
LV SIDE
LV SIDE
6.000
B2
PAVED AREA
P6.2
Plant
D1
Workstation Manager
Room FROM E.R.L.
PAVED AREA
LVL
PCC & MCC ROOM +450.00
16.000
DRIVER
44.400
49.541
RESTING
PAVED AREA
B2.2
D
AREA LVL
U4
32
+450.00
FSQR Lab
LVL. +150
.71
1:15 SLOPE
RAMP DOWN
2
FROM E.R.L.
0.075
D1
RAMP DOWN
1:15 SLOPE
P5.1
800
D 7.500
1000
LVL Work Shop +Engineering Store
U5.2 LVL U5.3 BATTERY
+450.00
D
A
6.000 P5.2
10.872
SLOPE
LVL. +150
SUMP
PUMP FOR CONDITIONER
Ø1800
(FUTURE)
P-021
FROM E.R.L.
CAP. 5 CU.M
MOC
T-012
- MS/SS
- MS
9.110
PUMP FOR MIXER
(PRESENT)
P-018
SLOPE
D1 P4.1
PUMP FOR CONDITIONER
16.200 P2.1.1
Ø1000
(PRESENT)
P-019
MOC
CAP. 1 CU.M
T-006
T-013
- HDPE/FRP
- UPVC
P4.1
PUMP FOR
(SPARE)
CONDITIONER
P-020
(PRESENT &
PUMP FOR
P5.2
STORAGE AREA
P-023
FUTURE)
WATER
Ø1400
MOC - SS
CAP.
[Link] TANK
P-023
T-014
(PRESENT & FUTURE)
2 CU.M
PUMP FOR VEG. OIL
5
UNLOADING
RS1
P-022
PUMP
1 4
E5 2 3
STEPS RAMP
3 2
[Link] UNLOADING
MOC-UPVC
1
AIR RECEIVER
MOC-SS
TANK
T-013
³ A-001
(1M
)
FIRE HYDRANT LVL.
AND HOSE BOX
+600.00
FROM
490
PLAN VIEW (EL.@0.0M) DOOR
E.R.L.
IFH
23.10
PROVISION FOR 51 TWO
WHEELER PARKING
RS1
HB
ZEBRA CROSSING
U5.6 UP
RS1
MENTN
BASEILATIO
7
VENT
FAN
5100 x 1500mm
Dump Open
RS1
18.320
-600.00 P1 21442 & 43 RCC STAIRS
PROVISION FOR
FROM E.R.L.
P3.1.1 RS1
70212
Bagging machine
Premix Dump &
Filter FROM EL. -5.30 TO EL.-2.7 mtr. 6 LOADING/
1500
5100 x 1500mm 5100 x 1500mm
Control Room
36.002
RS1 Condensate Tank -2.7m from Plant Finished -2.7m from Plant Finished
4 LOADING/ Filter
FROM EL. -5.30 TO EL.-2.7 mtr.
Floor Level
P2.1.5 Floor Level
VFD 50128
ROAD LVL. -600.00 FROM
1500
1500
3700
3500
Pelletmill 2200
RS1
UNLOADING 20123
HM Filter
500 Transfer Pump
E.R.L.
TRUCK PARKING RCC STAIRS
-2.7m from Plant Finished
FROM EL. -8.000 TO EL.-2.7 mtr. Floor Level
1500
RS1 21118, 19 & 20
-8.000 mtr Lvl
POC+Separator
+Hammermill
P2.1.4 P2.1.3 RS1
51128
Pelletmill 5100 x 1500mm
71212
Dump Open
Bagging machine
PROPOSED ROAD
21123 Future Dumping Station
DOOR
HM Filter
80 90
&
MM M H
0.
P5.3
9.800
RS1
CO IGH
MP BA
LVL. +150 1
2
3
FROM E.R.L.
OU RB
4
RAMP DOWN
5
1:15 SLOPE
Entry
RAMP DOWN
ND ED 73
12.605
1:15 SLOPE
1
2
UP 3
2.378
PAVED AREA
1
2
W WIR .949
3
SLOPE 1:15
RAMP DOWN
ALL E
DRIVER
PAVED AREA
W
U7.3
OF
ROAD 9.00 M. WIDE
11900mm X 15555mm RESTING AREA
HE
P3.2 RS1
IG
184.54 SQM
LVL +600.00
FROM E.R.L.
HT
TOILET
2.300M X 2.368M
ZEBRA UP
12 3
1.80
CROSSING 9.000
PAVED AREA
2295 [Link]. FROM E.R.L.
M
LVL. +150
33.385
W
D3
ITH
UP Ø2000
E4.3
U2
ROAD 9 M. WIDE
9.000 SOLID WASTAGE
17.625
MANAGEMENT PIT
6000
C/L OF APH
C/L OF APH
RS
BOILER ROOM
11850mm X 17225mm
LVL +600.00
4.500m. X 6.00m.
C/L OF BOILER
C/L OF BOILER
FROM E.R.L.
1250 4000
LVL +600.00
1960
FROM E.R.L. ENTRY
D1
9.000
E4.3 9.000 RS2
D2
5.015
FROM E.R.L. 3
LVL +600.00 2
FROM E.R.L.1
UP PAVED AREA UP
1 2 3 LVL.
+600.00
3 21
CROSSING
ZEBRA
BOOM BARRIER
HARVESTING
6.000
6.000
BOLLARDS FOR PEDESTRIAN
ROAD 9.00 M. WIDE LVL. +150 ROAD 6.00 M. WIDE
9.000
9.000
MOEVEMENT
LVL. +150
FROM E.R.L. PIT
FROM E.R.L.
1 2 3
26
LVL.
UP
22.495
+600.00 M
0.30 m. wide
.84
projection @
eaves lvl.
P9 U8
7
HAZARDOUS
WASTE STORE
6.000
AREA
14994
11.988
7500
80 MM COMPOUND WALL OF HEIGHT 1.80M WITH
& 0.90M HIGH BARBED WIRE
324.238