You are on page 1of 7

INCOUNTRY ENGINEERING SERVICES

Mechanical Equipment List

PRE-FEED PROJECT NDD A14 PHASE 2


(STAGE 3, 4 AND 5)
EOR STEAMFLOOD

Contract No.:

SPHR00418A
APPROVED FOR USE

28-Dec-23 0A Approved for Used (WO-2023-012881) BK ASW SN

DATE REV DESCRIPTION ORIG CHK APPR

Approved by: Company Approval:

Suryana Natawidjaya
Date: Date:
Doc.
Field Area Discipline Originator Sequence Sheet Revision
Type
DOCUMENT CONTROL NO.
GENF14GN
DURI MEC LST PHR 2003 00 0A
000
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

Revision History:

REV DATE DESCRIPTION ORIG CHK APPR


A1 6-Nov-23 Issued for Review (WO-2023-012881) BK ASW SN
A2 24-Nov-23 Re-Issued for Review (WO-2023-012881) BK ASW SN
A3 5-Dec-23 Issued for Use (WO-2023-012881) BK ASW SN
0A 28-Dec-23 Approved for Use (WO-2023-012881) BK ASW SN

Change Log:

REV SECTION CHANGE DESCRIPTION


A2 4.0 Fiiled up Mechanical Equipment data based on updated Process Document
A2 4.0 Fiiled up Mechanical Equipment data based on updated Process Document
A3 4.0 Fiiled up Mechanical Equipment data based on updated Process Document & Client comment
0A 4.0 Fiiled up Mechanical Equipment data based on updated Process Document & Client comment

Document Hold

i
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

Table of Contents

Page
Table of Contents......................................................................................................................1
1.0 INTRODUCTION .............................................................................................................2
2.0 OBJECTIVES ..................................................................................................................3
3.0 REFERENCES ................................................................................................................3
4.0 SUMMARY OF CALCULATION......................................................................................4
ATTACHMENT – 1 MECHANICAL EQUIPMENT LIST – Pre-FEED of the NDD-14 phase 2
(stage 3, 4 and 5) facilities ...........................................................................................5

Page 1 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

1.0 INTRODUCTION
COMPANY (Pertamina Hulu Rokan/PHR) requests CONTRACTOR (PT. Rekayasa
Engineering - Multi Karadiguna Jasa) to perform Pre-FEED of North Duri Development
Area 14 Phase 2 (Stage 3,4 and 5) EOR Steamflood.
Pre-FEED activities for the following multi disciplines: process, civil, mechanical, piping,
instrument, electrical, project management and operation assurance/readiness. The
scope of NDD Area-14 Phase 2 stage 3, 4, and 5 facilities consist of 147 wells, main road
& access road location, pipe corridors, power distribution facility, pigging facility, PWT skid,
bridges & canal.
Duri Field is located approximately 117 kilometers to the North of Pekanbaru City. Duri
Field was discovered in 1941 and started the primary production in 1955. The steamflood
EOR of Area 1 PK started in 1985 and continues to develop for the next areas up to Area
12 at 2008 and Area 13 at 2013. Currently, more than 10,000 wells have been drilled in
Duri field and have been developed into 13 development areas with an estimated
productive area of around 121 km2. The reservoirs in Duri Field have depth variation of
200 - 900 feet consisting of the Rindu, First, Second, and Baji-Jaga-dalam formations. The
Duri Steam Flood (DSF) field is the largest thermal enhanced oil recovery project in
Indonesia and located in Wilayah Kerja (WK).

Figure 1 Location of Duri field

The production and injection profile prediction method for the development of the NDD
Area 14 Phase-2 : Stage-3, 4, 5 (hereinafter referred to as PROJECT) project use the
Depletion Rate Model or the Steamflood Model. The initial process carried out is to
determine analog areas and regions based on the similarity of static and dynamic
properties, pattern size, target reservoir, steamflood maturity and analog surface facilities.
A12 (Area-12) is suitable area to be modeled and used for determining the performance
of A14 because they are still in one reservoir which is located in the up-dip Area 14 and
has the same development pattern, moreover the A14 facility will be connected to the A12
facility so that it will have a steam source with the same facility line as A12.
The initial development of NDD Area 14 Phase 2 stage 3,4,5 will cover following wells
number:

Page 2 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

Table 1: Area-14 Well Count per Stage


Well Stage-3, 4 and
Number 5
Producer 87
Injector 45
TOW 15
Total 147

2.0 OBJECTIVES
This document defines the Mechanical Equipment List Pre-FEED of the NDD-14 phase 2
(stage 3, 4 and 5) facilities. The Mechanical Equipment list has been developed based
on Equipment Sizing, Process Datasheet.

3.0 REFERENCES
The mechanical Equipment List is supplemented by the following documents :
• DURI-GENF14GN000-PRO-DAS-PHR-2005 CVC Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2006 New CVC Condensate Cooler
• DURI-GENF14GN000-PRO-DAS-PHR-2007 New CVC Transfer Pump
• DURI-GENF14GN000-PRO-DAS-PHR-2008 New CVC Condensate
Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2009 New CVC Condensate Transfer
Pump
• DURI-GENF14GN000-PRO-DAS-PHR-2010 New KO Drum
• DURI-GENF14GN000-PRO-DAS-PHR-2011 New overflow Tank
• DURI-GENF14GN000-PRO-DAS-PHR-2012 New Overflow tank
• DURI-GENF14GN000-PRO-DAS-PHR-2013 New Flare ( EGF )
• DURI-GENF14GN000-PRO-DAS-PHR-2014 New Vent Stack
• DURI-GENF14GN000-PRO-DAS-PHR-2015 New Condensate Cooler
• DURI-GENF14GN000-PRO-DAS-PHR-2016 New AWT Heater
• DURI-GENF14GN000-PRO-DAS-PHR-2017 New Gauging Separator
• DURI-GENF14GN000-PRO-DAS-PHR-2018 New AWT Transfer Pump

Page 3 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

4.0 SUMMARY OF CALCULATION

The Mechanical Equipment list and summary of demand calculation are as indicated in
Attachment-1

Page 4 of 5
North Duri Development Area 14 Phase Stage 3, 4, and 5 Mechanical Equipment List
DURI-GENF14GN000-MEC-LST-PHR-2003-00
Date: 28-Dec-23 Rev 0A

ATTACHMENT – 1
MECHANICAL EQUIPMENT LIST – Pre-FEED of the NDD-14 phase 2 (stage 3, 4
and 5) facilities

Page 5 of 5