You are on page 1of 32

COMPANY PROFILE

Ver 2024

VERSION 2020
is INDONESIA Local Company, establish since
2018

will focus in supply of package equipment


which used in Power and Oil & Gas Business.
Oil & Gas Gas Transporter
consists of many experience discipline
engineer such as Process, Mechanical, IEC Engineer
and Drafters, that have experiences in packages design
and building.

also invests on some license software which Petrochemical EPC Contractor


commonly used in package design like HYSYS, PV Elite,
Solid Edge, AutoCAD, VPID, InstruCalc and many more
software.

is also lead by a very experienced person (in


the package business) who has more than 20 years in
Power Plant Fabricator
package design, build and sales.
PRODUCT AND SERVICE
STAUPER has developed and patented a suite of
technologies that allows operators a low-cost and efficient https://www.stauperwatertech.com/
solution for produced water challenges.
Key Benefits of Stauper's CFU:
STAUPERS offering is based on a well-proven and
❑ Stable, highly efficient, proven to remove over 99% oil in water
established principle of gas flotation. Utilizing a unique gas in
❑ Small footprint & several complete cleaning stages in
water mixer and the Stauper Coalescence Chamber (SCC),
one vessel
Stauper improves separation and degassing due to a unique ❑ Capture solid particles
water flow control and pattern. ❑ No moving parts – no small-bore openings – maintenance free
❑ Significant savings in weight and footprint
The technology is supplied as a retrofit kit for existing ❑ Less connections and instrumentation
vessels as well as in standalone skids for de-oiling and
degassing of produced water.

STAUPER first patented technology was a the Stauper


Compact Flotation Unit skid which has been accepted as
Best Available Technology for removing dispersed oil from
produced water.

THE STAUPER CFU Skid is compact, maintenance free,


scalable, and proven to treat produced water down towards
zero ppm oil in water.

Retrofitting of existing vessels with Stauper Coalescence


Chamber will allow operators to improve separation
efficiency and flow capacity in a short time and with a
significant lower cost than installing new process equipment Single Stage Two Stage
https://www.termochimica.com/

Deaeration is the mechanical removal of dissolved gasses such as oxygen and carbon dioxide from a fluid.
Feedwater to the boller should contain less than 0.005 cc of 02 per liter (7 ppb) or less.

Termochimica's Spray & Tray Deaerators Incorporate a strong basis design that assure the above mentioned
performance over varying loads of incoming water.

The process of Termochimica Deaerators involves two main stages in which the steam and water move in
opposite directions (see figure "Internal Diagrams"):

1) cold water enters at the top of deaerating tower in order to be sprayed through special designed stainless
steel spray-valves into a steam atmosphere. Self -adjusting spring-loaded spray valves provide the breaking
down of water into thin films or droplets . By this action, the distance a bubble of gas has to travel to be
released, is greatly reduced and a large percentage of the gases are removed in this section.

2) in the second stage the water rains through a series of special designed stainless steel perforated trays ,
countercurrent to the steam . Fresh gas-free steam enters from the bottom of deaerating tower and flows
upwards scrubbing out the last traces of the residual oxygen and carbon dioxide. Efficient scrubbing is essential
to achieve 7 ppb of oxygen effluent quality.

Gases O2 and CO2 mixed with a little steam flow-rate , are discharged to the external atmosphere through vent
nozzles completed with calibrated orifices and vent condenser direct-contact type. Since 1969 Termochimica
supplied Deaerators to the main EPC Companies or Users involved in power stations , such as ABB Lummus ,
Agip Gas, Alstom Power, Enelpower, Formosa Chemicals, Fisia Italimpianti, Foster Wheeler, JGC Corporation, Koch
Glitsch, Nuovo Pignone , Tecnimont, Snamprogetti, Standard Fasel Lentjes. The performances of deaeration
granted by Termochimica are based on dedicated processes developed by experienced engineers and project
managers which enable Termochimica to design and supply Deaerators guaranteed to meet full compliance
with the requirements of our customers
“Quality Wire Products Company W.L.L is one of the single largest
sources for separation and filtration applications in the Middle
East.”

https://www.qualitywire.com.bh/

PRODUCTS
Quality Wire Products Company W.L.L is one of the single
largest source of a wide range of wire mesh related products
suitable for separation and filtration applications in the
Middle East.

❑ Column Internals
❑ Reactor internals
❑ Separator internals
❑ Pipeline Strainers
❑ Y Type Strainers
❑ Tee-Type Strainer
❑ Basket Strainer
❑ Duplex Strainers
❑ Air Eliminator
❑ Wire mesh, Perforated and Gratings
❑ Welded Wire Mesh
❑ Perforated Sheets
❑ Pipe Coating Mesh
❑ Aluminum Wire Mesh
❑ Woven wire mesh
❑ Gratings
❑ Architectural Wire Mesh
1. FUEL GAS CONDITIONING PACKAGE
2. SEPARATOR PACKAGE
3. CHEMICAL INJECTION PACKAGE
4. GAS DEHYDRATION PACKAGE
5. AMINE PACKAGE
6. DEW POINT CONTROL PACKAGE
FUEL GAS CONDITIONING PACKAGE CHEMICAL INJECTION PACKAGE
7. CONDENSATE STABILIZATION PACKAGE
8. H2S SCAVENGER PACKAGE
9. GAS & LIQUID FILTRATION PACKAGE
10. WATER BATCH HEATER
11. METERING PACKAGE
12. MRS PACKAGE
13. DEARATOR PACKAGE
14. CFU PACKAGE
COMPACY FLOATATION UNIT DEW POINT CONTROL PACKAGE
15. BIO DIESEL BLENDING PACKAGE
METERING PACKAGE SEPARATOR PACKAGE
STEAM DE-AERATOR

WATER BATCH HEATER H2S SCAVENGER PACKAGE DHU PACKAGE


PROJECT :
WET CALIBRATION of 2 unit 16” ANSI 600# Ultrasonic Flow
Metering (USM)

END USER :
PT. Indonesia Power

CLIENT :
PT. Sumber Petrindo Perkasa

PROJECT LOCATION :
Randu Blatung, Cepu, Central Java

YEARS : 2017

SCOPE :
• USM Dismantling and Packing
• Delivery of USM to and from VOSS Calibration Laboratory at
Belgium
• Organize Client and Government Officer for calibration witness
• Provide Calibration Report

2017
PROJECT :
EPC Gas Metering Station, Siberida

OWNER :
PT. TRANS GASINDO

EPC :
YUAN SEJATI

PROJECT LOCATION :
Siberida, Riau

YEARS : 2017

SCOPE :
• Bid Stage Engineering Backup and Support
during Proposal Preparation
• Topography and Soil Investigation Service
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail
Engineering work
• Commissioning Back Up.

2017
PROJECT :
RS MUSI RAWAS – PALEMBANG - 2018

OWNER :
PT. PERTAGAS

CLIENT :
YUAN SEJATI

PROJECT LOCATION :
Tarakan, Kalimantan

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and Support
during Proposal Preparation
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail
Engineering work
• Commissioning Back Up.

2018
PROJECT :
RS DELI SERDANG – 2019

OWNER :
PT. PERTAGAS

CLIENT :
YUAN SEJATI

PROJECT LOCATION :
Tarakan, Kalimantan

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and
Support during Proposal Preparation
• Provide PMT personnel for
engineering
• Perform Project Multi Discipline
Detail Engineering work
• Commissioning Back Up.

2018
PROJECT :
MRS JARGAS PALEMBANG - 2018

OWNER :
PT. PERTAGAS

CLIENT :
YUAN SEJATI

PROJECT LOCATION :
Tarakan, Kalimantan

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and
Support during Proposal Preparation
• Provide PMT personnel for
engineering
• Perform Project Multi Discipline
Detail Engineering work
• Commissioning Back Up.

2018
PROJECT :
MRS JARGAS PALEMBANG - 2018

OWNER :
PT. PERTAGAS

CLIENT :
YUAN SEJATI

PROJECT LOCATION :
Palembang - Indonesia

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and Support
during Proposal Preparation
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail
Engineering work
• Commissioning Back Up.

2018
PROJECT :
STATSIUN GAS KOTOGASIB

OWNER :
PT. TRANS GASINDO

EPC :
YUAN SEJATI

PROJECT LOCATION :
Koto Gasib, Riau

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and Support during
Proposal Preparation
• Topography and Soil Investigation Service
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail Engineering
work
• Commissioning Back Up.

2018
PROJECT :
FUEL GAS SYSTEM FOR NATUNA AND PAPUA

OWNER :
PT. PP (persero) – EPC Divission

CLIENT :
YUAN SEJATI

PROJECT LOCATION :
7 LOCATION

YEARS : 2018

SCOPE :
• Bid Stage Engineering Backup and Support during
Proposal Preparation
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail Engineering
work
• Commissioning Back Up

2018
PROJECT :
PLN GAS RECEIVING & METERING STATION

OWNER :
JOB PERTAMINA - MEDCO E&P TOMORI SULAWESI

EPC :
KONSORSIUM YUAN CEP

PROJECT LOCATION :
Banggai, Sulawesi Tengah

YEARS : 2019

SCOPE :
• Bid Stage Engineering Backup and Support during
Proposal Preparation
• Topography and Soil Investigation Service
• Provide PMT personnel for engineering
• Perform Project Multi Discipline Detail Engineering work
• Commissioning Back Up.

2019
PROJECT :
CHEMICAL INJECTION PACKAGE 42-A-301 LPG
ODORANT UNIT

OWNER :
PERTAMINA REFINERY UNIT VI
BALONGAN

CLIENT :
PT. KHARISMA SINAR UTAMA

PROJECT LOCATION :
Indramayu, Jawa Barat

YEARS : 2019

SCOPE :
• Engineering, PMT
• Supply Equipment, Piping, Instrumentation and Skid
• Installation supervision
• Start up and Commissioning

2019
PROJECT :
B20 IN-LINE BLENDING SYSTEM

OWNER :
PT. AKR CORPORINDO, Tbk

CLIENT :
PT PRAKARSALANGGENG MAJUBERSAMA (MB)

PROJECT LOCATION :
LAMPUNG, SURABAYA, STAGEN, PONTIANAK,

YEARS : 2019

SCOPE :
• Design, Engineering, PMT
• Supply Main Components,
• Supply Instrumentation and Electrical
• Installation supervision
• Start up and Commissioning

2019
PROJECT :
B20 IN-LINE BLENDING SYSTEM

OWNER :
PT. AKR CORPORINDO, Tbk

CLIENT :
PT PRAKARSALANGGENG MAJUBERSAMA (MB)

PROJECT LOCATION :
BANJARMASIN, PALARAN

YEARS : 2020

SCOPE :
• Design, Engineering, PMT
• Supply Main Components,
• Supply Instrumentation and Electrical
• Installation supervision
• Start up and Commissioning

2020
End User : Saka Indonesia Pangkah Ltd.
EPC Contractor : PT. PGAS Solution
Client : PT. Timas Suplindo
Job. Location : WHP-B Platform
Start Date : January 5th 2023
Current Status : Ready for Commissioning
Scope :
• Project Management
• Design Engineering
• Supply Instrument & Valve
• Factory Acceptance Test (FAT) of Supplied Item
• Installation of Instrumentation
• Training
• Pre-Commissioning & Commissioning
• Start-Up
• Documentation
End User : PT. Trans Pacific Petrochemical Indotama
Client : PT. Timas Suplindo
Job. Location : TPPI Tuban Plant
Start Date : March 8th 2023
Current Status : Commissioning
Scope :
• Project Management
• Engineering
• Procurement: Duct Burner, FCV, Insulation, Piping &
Manual Valve, Mechanical & Instrument Bulk Material
• Installation & Construction
• Commissioning & Start-Up
• Documentation
End User : PT. Trans Pacific Petrochemical Indotama
Client : PT. Timas Suplindo
Job. Location : TPPI Tuban Plant
Start Date : August 22nd 2023
Current Status : Commissioning & Start-Up
Scope :
• Project Management
• Engineering
• Procurement: Electrical & Instrument
• Installation & Construction
• Commissioning & Start-Up
• Documentation
End User : PT. TPPI
Client : PT. Timas Suplindo
Job. Location : TPPI Tuban Plant
Start Date : February 13th 2023
Status : Completed
Scope :
• Project Management
• Design Engineering
• Commissioning & Start-Up
• Documentation
End User : PT. PHE ONWJ
Client : PT. Meindo Elang Indah
Job. Location : YY Platform
Start Date : March 4th 2022
Current Status : DONE
Scope :
• Project Management
• Design & Detail Engineering
• Procurement: Instrument, Equipment, Electrical
• Fabrication
• Assembly Work
• Insulation Work
• Commissioning & Start-Up
• Documentation
End User : PT. Pertamina Hulu Mahakam
Client : PT. Yuan Sejati
Job. Location : Handil 2 Base Balikpapan
Start Date : November 7th 2022
Current Status : Engineering
Scope :
• Project Management
• Design Engineering
• Fabrication
• Installation & Assembly
• Factory Acceptance Test (FAT)
• Commissioning & Start-Up
• Documentation
End User : PT. Kilang Pertamina Internasional RU VI Balongan
Client : PT. Yuan Sejati
Job. Location : RU VI Balongan
Start Date : September 21st 2023
Current Status : Engineering & Procurement
Scope :
• Project Management
• Design Engineering
• Fabrication
• Installation
• Commissioning & Start-Up
• Documentation
End User : PT. PERTAMINA EP Asset II, Zona 7
Client : PT. Bina Sarana Putra
Job. Location : Karang Baru - Indramayu
Start Date : Februari, 2023
Current Status : Engineering & Procurement
Scope :
• Project Management
• Licensor Provider
• Design Engineering
• Supply Critical Component
• Fabrication
• Installation
• Commissioning & Start-Up
• Documentation
• Training Opration
End User : PT. Kilang Pertamina International
Client : PT. Timas Suplindo
Job. Location : Cilacap
Start Date : Descember, 2023
Current Status : Engineering Stage
Scope :
• Licensor Provider
• Design Engineering
• Supply Critical Component
Centro Havana, Kawasan Industri Taman Tekno 2 - H9/16,
Setu, South Tangerang City, Banten 15314