GIS INSTALLATION PROCEDURE


GIS INSTALLATION
PROCEDURE
Ø CHECK THE FLOOR LEVEL AND I BEAMS ARE IN PROPER LEVEL IF SO DO LEVEL
Philips Avent
CORRECTIONS BY GRINDING OR USING METAL SHIMS
Classic Soft
Spout
INR Cup,
295.00
Ø CHECK THE LOADING CAPACITY OF OFFLOADING PLATFORM IN FRONT OF THE
200ml
GIS ROOM. IT SHOULD BE CAPABLE OF CARRYING THE LOAD OF THE HEAVIER (Pink/Purple)
Shop now
GIS PARTS AND SHOULD HAVE AN EXCESS MARGIN OF 1.5 TONS.

Ø ENSURE THAT ROOM IS DUST PROOF AND CLEAN

Ø ENSURE THAT OPENINGS PROVIDED ARE AS PER APPROVED DRAWING AND


CHECK ONCE AGAIN AFTER INSTALLING BAYS EITHER IT WAS MATCHING TO
BAY OR NOT

Ø ENSURE THAT NO OTHER THEN RELATED TO GIS INSTALLATION PERSON IS


ALLOWED TO WORK AREA

Ø STICK GIS GA DRAWINGS ON THE WALLS FOR EASY REFERENCE

Ø ENERGIZE THE HIGH BEAM LIGHTING CIRCUITS IN THE GIS ROOM

Ø ENSURE THAT THE LOAD TESTING OF EOT CRANE IS COMPLETED PRIOR TO


THE SHIFTING OF GIS BAYS Privacy

Ø PLAN THE SHIFTING OF GIS TO SITE AFTER IDENTIFYING SUITABLE LOCATIONS


IN FRONT OF GIS ROOM FOR STORAGE OF GIS BAYS, ACCESSORIES AND THE
PARKING OF OFFLOADING CRANE AND TRAILERS. Popular Posts

Ø FIRST CHECK THE GIS BELONGS TO YOUR SITE AND AFTER OPENING THE If you are looking for job, go to websites one by
PACKINGS CHECK THE SI NOS MATCHING WITH FAT REPORT one and upload your CV
Dear Job Seeker, If you are looking for job,
Ø CONFIRM WEATHER THE GIS BAYS WERE SINGLE OR DOUBLE COMPARTMENT go to websites one by one and upload your CV,
After Getting job, send me a mail to j...
Ø SHIFT THE BAYS TO INSIDE AND PLACE IN PROPER POSITION AS PER Job opening for the position of Electrical
EQUIPMENT LATOUT Engineer for a big leading company based in
Riyadh - Saudi Arabia.
Ø AFTER PLACING IT IN PROPER POSITION START THE PROCEDURE OF Dear Candidate, Greetings! Reference to your
COMPARTMENT COUPLING CV at Timesjobs.com We are pleased to inform
you regarding a Job opening for the position of
Ø CHECK THE TOTAL MATERIALS ARRIVED AS PER THE PACKING LIST AND CHECK E...
FOR THE TOOLS AND THE EQUIPMENTS TO BE SUPPLIED BY THE
MANUFACTURER AND THE INSTALLATION CONTRACTOR
Urgent Required for DOHA QATAR NEW
INTERNATIONAL TECHNOLOGY. (NITCO)
.
(FOR INDIAN NATIONALS)
Ø AFTER REMOVING THE COMPARTMENT JOINT CAP OF BOTH BAYS CLEAN THE
Urgent Required for DOHA QATAR NEW
CHAMBER THOROUGHLY WITH VACCUME CLEANER AND APPLY THE WHITE INTERNATIONAL TECHNOLOGY. (NITCO)
GREESE TO GAS CUT(INDUSTRIAL TYPE) (FOR INDIAN NATIONALS) PROCESS

https://ilovemynellore.blogspot.com/2014/10/gis-installation-procedure.html 1/4
8/24/2020 ITS FOR U ..........................: GIS INSTALLATION PROCEDURE
Ø CHECK THE MALE AND FEMALE CONTACTS WERE SPACED AT EQUAL DISTANCE ENGINEERS. BE MECH ENG) SALARY
IF NOT FAULTY CONTACT TO BE CHANGED NEGITIABL...

Ø THEN SLOWLY CLOSE THE BOTH THE BAY COMPARTMENTS BY GETTING IT Client Interview for Electrical, Mechanical
Engineer - Qatar
TOGETHER REMOVE THE POLYTHENE COVER (TEMPORARILY CLOSED TO
Client Interview for Electrical, Mechanical
AVOID DUST ENTRY) AND START FIXING OF BOLT AND NUT TO COUPLING.
Engineer - Qatar Continental Mercantile
Ø IN SAME WAY COMPLETE THE TOTAL BUS
Corporation hiring for "grade A" Electro Mec...

Ø AFTER COMPLETING THE COMPARTMENT COUPLING WE CAN START THE leading Electrical contracting company based in
FOLLOWING PARALLEL WORKS Nairobi, Kenya , Africa.
Annual Salary of the Job: As per Company
1. DENSITY METER FIXING Standard Job Location: Kenya Apply Now
2. VACCUMING AND GAS FILLING Reply Dear Candidate, Dear Aspirant,
3. VT INSTALLATION IS SAME AS COMPART MENT JOINTING Greetings! I...
4. PLATFORM ARRANGEMENT
(no title)
5. WELDING TO I BEAM
Location: Bucharest Contact:
Ø BEFORE VACCUMING FOR BUS BAR AND CABLE SEAL END WE HAD TO
catalina@ocprodgroup.com Positions: 10 On
COMPLETE THE FOLLOWING WORKS behalf of our client, an international engineering
PD SENSOR TO BE INSTALLED company based in ...
FEMALE CONNECTOR FOR CABLE SEAL END TO BE FIXED
VACCUM AND GAS FILLING requirement for civil engineers
IDENTIFY THE BAY AND CHAMBER FOR WHICH VACCUM TO BE DONE Dear all , we are having requirement for civil
OPEN THE CAP OF THE CHAMBER TO BE VACCUM CLEAN IT AND SILICA GEL engineers in our company for riyadh, saudi
TO BE REMOVED CLOSE THE CHAMBER PLATE arabia who is having experience in GIS
CONNECT THE HOSE TO THE GD VALVE TO VACCUM PUMP AND ENSURE THAT substatio...
DENSITY METERS AND WERE INSTALLED PRIOR VACCUMING.
Senior Field Engineer - Chennai
CONNECT THE PIRANI GUAGE SENSOR TO VACCUM PUMP
Greetings!!!!!!! We have the following vacancy
NOTE THE START TIME AND RECORD THE VALUES FREQUENTLY TIME AND
with us and the details are given below.
VACCUM PRESSURE AND TIL IT REACHES 0.2TORR Designation : Senior Field Engineer -
IN BELOW PIC Chennai...
GATE VALVE-1- --------------- SF6 GAS HOSE CONNECTED TO VALVE
GATE VALVE-2------------------ PUMP VALVE VISA FOR SAUDI ARABIA
GATE VALVE -3 ---------------- USED TO CONNECT PIRANI GUAGE VACCUM RESIDENCE VISA KSA - Family Residence
SENSOR Visa Process This process involved mainly two
GATE VALVE-4 ----------------- CONNECTED FOR CHAMBER HOSE to three parts. One part has to be do...
FOR VACCUMING THE VALVES POSITION TO BE AS BELOW
132KV UNDER GROUND CABLE WORKS
VALVE-2 ---------------- OPEN
BOQ
VALVE-3 ----------------CLOSED
1 1CX1200sq mm 132kV XLPE cable LM 2
VALVE-1---------------- CLOSED
132kV insulated joints NO 3 132kV Transition
VALVE-4 ---------------OPEN joints NO ...
FOR MEASURING VACCUM PRESSURE VALVE POSITION TO BE AS FOLLOWS
VALVE-2 ---------------- CLOSED
VALVE-3 ----------------OPEN
VALVE-1---------------- CLOSED Blog Archive
VALVE-4 ---------------OPEN
► 2017 (4)
► 2015 (1)
FOR FILLING SF6 GAS VALVE POSITION TO BE AS FOLLOWS
VALVE-2 ---------------- CLOSED ▼ 2014 (40)
VALVE-3 ----------------CLOSED ► December (2)
VALVE-1---------------- OPEN
► November (5)
VALVE-4 ---------------OPEN
WHILE FILLING THE GAS WE HAVE TO OBSERVE THE DENSITY METER FOR GAS ▼ October (33)
PRESSURE Urgent Required for DOHA
SI ACTIVITY NO OF DAYS MANPOWER QATAR NEW INTERNATIONAL
NO REQD RE T...
1 BAY INSTALLATION 4 DAYS FOR 15 ( FOR
Construction Manager / Estimation
AND ALIGNMENT WITH 9 BAYS SHIFTING Engineer / Quant...
COMPARTMENT TIME) AND
COUPLING FOR Quality Incharge Education /
ALIGNMENT Experience Requirements
WORKS 10 Opening for Planning &
PEOPLE IS Scheduling Engineer For Sub...
USED
Greetings from ENGINEERING
CONSULTANCY GROUP
2 VACCUM AND GAS 1 DAY 1 BAYS 2
FILLING A Leading Korean MNC company
Urgently requires for...
3 VT INSTALLATION 2VTS PER 6
DAY GIS INSTALLATION
4 PLATFORM 4 DAYS 10 PROCEDURE
ARRANGEMENT
Tools list for industrial electrician
5 LCC PANELS 4 DAYS 10
JOBS IN DEWA
Why Is OSHA Important to You?

https://ilovemynellore.blogspot.com/2014/10/gis-installation-procedure.html 2/4
8/24/2020 ITS FOR U ..........................: GIS INSTALLATION PROCEDURE
LCC PANELS INSTALATION OSHA INTRODUCTION
Ø ENSURE THAT BEFORE STARTING OF PANEL ERECTION EOT CRANE IS FREE
Ø CHECK THE OPENING SIZES AND HORIZONTAL CLEARENCES WERE AVAILABLE SULTAN QABOOS UNIVERSITY
GOVT HOSPITAL-
FOR LCC PANELS FIXING
OMANPRESTI...
Ø MARK ON THE FLOOR/WALL PANEL LOCATION AND CROSS CHECK THAT LCC
PANEL SHOULD BE EXACTLY INFRONT OF CORRESPONDING BAY Ministry of Health(MOH), Kuwait
Ø MARK THE LOCATION OF FOUNDATION BOLTS AND START DRILL N FIX THE
They say breakfast is the most
PANELS important meal of t...
Diamond dental lab in saudi
requires the following:
NECESSARY MATERIALS TO CHECK BEFORE STARTING OF GIS WORKS Job | Lead / Principal Piping
MAN POWER AND MATERIALS Design Engineer - Mu...
1. PACKING LIST
Opportunity for Piping Material
2. SKILLED MAN POWER
engineer/ Piping S...
3. AUTHORISED RIGGER FOR EOT CRANE OPERATION
4. CHAIN BLOCKS Excellent Opening for Planning
5. TOOL KIT Engineer in Abudhab...
6. LEVEL BLOCK Opening with leading epc oil & gas
7. LIFTING BELTS company for eng...
8. VACCUM MACHINE
If you are looking for job, go to
9. WATER BOTTLE WITH SPRAY ARRANGEMENT
websites one by ...
10. INDUSTRIAL TISSUE PAPERS
11. 2.5T PALLET TROLLEYS Interview Tips
12. 10T JACKS FOR LIFTING AND PLACING OF GIS BAYS
Location: BucharestContact:
13. WOODEN RACKS IN GIS ROOM FOR STORING MATERIALS catalina@ocprodgroup.c...
14. STEEL CABINET WITH LOCKS
15. WIDE TABLE -1 no. Welcome to Al Jaber Energy
16. SMALL TABLE – 1no. Services LLC
17. CHAIRS – 4nos. Vietnam Manpower JSC has been
18. 32A AND 16A POWER SUPPLY OUTLETS supplying all kinds ...
19. AVAILABLITY OF VACCUM PUMP WITH BYPASS VALVE OR DELO MACHINE
Need US IT Recruiters for our
20. PIRANI GUAGE
Coimbatore Off shore...
21. DEW POINT METER
22. GAS LEAKAGE METER Lead Telecommunication Engineer
23. 19MM HOSE FOR VACCUM AND GAS FILLING GET FREE JOBS ALERT
UPCOMING INTERVIEWS &
WORKING ...
Walk-in interview for SAIL Bhilai
plant
132KV UNDER GROUND CABLE
Posted by Unknown at 23:33
WORKS BOQ
Labels: ELECTRICAL ENGINEERING VISA FOR SAUDI ARABIA
RESUMES
No comments: 132KV, 1200 SQMM XLPE
CABLE UNDER GROUND
Post a comment CABLE CON...
MY NELLORE

Enter your comment...

About Me

Comment as: camorenasi@g Sign out


Unknown
View my complete
profile
Publish Preview Notify me

Translate

Select Language
Newer Post Home Older Post
Powered by Translate

Subscribe to: Post Comments (Atom)

https://ilovemynellore.blogspot.com/2014/10/gis-installation-procedure.html 3/4
8/24/2020 ITS FOR U ..........................: GIS INSTALLATION PROCEDURE

Subscribe To

Posts

Comments

Awesome Inc. theme. Powered by Blogger.

https://ilovemynellore.blogspot.com/2014/10/gis-installation-procedure.html 4/4

You might also like