1) Flammable materials storage areas cannot be located within _______ of other buildings or
structures:
a) 25 ft
b) 50 ft
c) 50 meters
d) 100 ft
2) When grinding a piece of metal with a portable power grinder, the type of Personal Protective
Equipment required is:
a) 110V
b) 220V
c) 240V
d) 110V with GFCI and 220V with RCD
4) The ratio of vertical to horizontal spacing for a straight or extension ladder is:
a) 1 to 1
b) 2 to 1
c) 3 to 1
d) 4 to 1
5) A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold
platform by a minimum distance of:
a) 1 foot
b) 4 feet
c) 0.9 meter
d) No set distance
729574789.doc Page 1 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
a) GI 1.200
b) GI 5.430
c) GI 2.100
d) GI 6.200
7) If someone is injured on your job site, a preliminary written report must be submitted to the
Saudi Aramco PMT within ________ period of time:
a) 2 hours
b) 24 hours
c) 8 hours
d) 3 days
8) Work platforms must have toe boards, mid rails, top rails and access ladders once they reach a
height of ______:
a) 4 ft
b) 8 ft
c) 6 ft
d) When the height is four times greater than the base width
9) Excavation “Spoils” must be set back a minimum of _____ from the sides of the excavation.
a) 1 meter
b) 6 ft
c) 3 ft
d) 2 ft
a) 7
b) 10
c) 15
d) 19.50
11) During storage of oxygen and acetylene gas cylinders they must be separated by (1) A Fire
Resistant Wall or (2) A Distance of ______ .
a) 20 ft
b) 50 ft
c) Not required if tanks are empty
d) Not required if protective caps are on
e) None of the above
729574789.doc Page 2 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
a) Type A
b) Type B
c) Type C
d) None of the above
14) What is necessary for a worker to wear on a steel beam six feet or more above ground?
15) When there are openings in roof work and/or at edges of roofs, and a fall hazard exist, barricades
must be installed capable of withstanding a force of:
16) Which of the following factors does not affect the load capacity of a mobile crane?
a) Boom length
b) Boom angle
c) Extending the outriggers fully
d) Installation of a anti-two block device
17) How many clips are required to construct an eye in a one-half inch wire rope?
18) Class “B” fires involve flammable liquids or gases that could be under pressure. What would
give you most concern when selecting a Class “B” fire extinguisher?
729574789.doc Page 3 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
a) 1 month
b) 1 week
c) 1 shift
d) 1 day
a) 10 ft
b) 15 ft
c) 50 ft
d) 25 ft
21) When transferring an extremely flammable liquid from a 55 gallon drum via a hand pump to a
small metal safety can, which of the following provides the best protection?
22) A small mobile crane with rubber tires has struck a power line. The line, which is now believed
to be dead, is lying across the crane boom. Which of the following best describes the proper
course of action for the crane operator?
23) Caught-in hazards cause only minor injuries and are not a big concern to construction workers.
24) Which of the following is true concerning explosive proof equipment? Explosive proof
equipment is allowed to operate in a flammable or explosive atmosphere because it is capable of:
729574789.doc Page 4 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
25) How long should the appointed “Fire Watch” remain at the site of HOT work after the work has
stopped?
a) 10 minutes
b) 15 minutes
c) 20 minutes
d) 30 minutes
27) What are the most important self-developed skills of a site safety officer?
a) Explosive atmospheres
b) Oxygen enriched atmospheres
c) Hydrogen sulfide poisoning
d) Oxygen deficient atmospheres
29) When lifting over or adjacent to process piping, etc., what is required?
a) Hold Tag
b) Welding Machine
c) Rigger 1
d) Hot Work Permit
e) All of the above
a) Slings
b) Guys
c) Tag Lines
d) Shackles
729574789.doc Page 5 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
31) If you found a fire exit blocked by a wooden pallet what would you do?
a) Leave it
b) Move it at quitting time
c) Move it immediately
d) Wait for someone else to move it
33) What is the permissible noise exposure for an eight-hour work shift?
a) 80
b) 90
c) 100
d) 120
35) Hold tags and locks are primarily intended to protect the individual who is doing the work from?
729574789.doc Page 6 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
37) Health hazards associated with welding that are attributed to the reaction of the heat and specific
material to which it is being applied are called __________ agents.
a) Physical
b) Chemical
c) Either physical or chemical
38) Danger signs must be used only where a(n) ____________ hazard exists.
a) Potential
b) Immediate
c) Serious
d) Fatal
39) When using gas welding cylinders for devices with shutoff valves, a suitable regulator must be
used to reduce pressure. Prior to connecting a regulator, ______ must be done on the valve to
clear any dust or dirt that might enter the regulator.
a) Splitting
b) Cracking
c) Releasing
d) Suction
40) An electrical hazard that occurs when current flows through parts of the human body is referred
to as:
a) Shock
b) Burn
c) Explosion
d) Fire
SECTION 2
1. Respiratory protective devices can be classified as, air purifying, supplied air, & self-contained
breathing devices.
a) True
b) False
2. The new heavy plastic 5 gallon drums may be used to store, transport, and dispense diesel fuel
only.
729574789.doc Page 7 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
a) True
b) False
3. When step ladders have steps on one side and rungs on the other, two men may be on the same
ladder at the same time:
a) True
b) False
4. Portable power tools being operated from an on site generator need not be protected by a GFCI
(ground fault circuit interrupter) to be consistent with the Saudi Aramco CSM.
a) True
b) False
5. Excavation not subject to vehicle traffic may be barricaded using Red and White Warning Tape:
a) True
b) False
a) True
b) False
7. Holes may be drilled into sides of hard hats to provide for cross ventilation air-flow during very
hot weather.
a) True
b) False
8. If a tool breaks it is permissible to weld a piece of pipe as a handle temporarily
a) True
b) False
9. Soap and paper towels must be provided for the men to clean up before meals.
a) True
b) False
10. Push sticks must always be used when guiding woodwork into a table saw.
a) True
b) False
11. Rubber boots must be provided for persons engaged in the pouring of concrete.
a) True
729574789.doc Page 8 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
12. When wearing rubber boots for concrete pours, it is not necessary to have your steel toe
boots/shoes on.
a) True
b) False
13. Placing an 8’2” X 12” board over two 20-liter paint cans is allowed for temporary work platform.
a) True
b) False
14. Formwork boards should be removed to the de-nailing area as soon as possible after they are
disassembled.
a) True
b) False
15. A fire extinguisher must be placed near (5 to 15 feet) to any combustion engine being operated
on site.
a) True
b) False
a) True
b) False
18. Hand held power tools such as drills and grinders may be locked-on if the job is going to take a
long period of time to accomplish.
a) True
b) False
19. Permanent scaffolds should be secured by tying off to a firm portion of the structure every 26 ft.
vertically, 30 ft. horizontally, at each end, and the top.
a) True
b) False
20. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide.
729574789.doc Page 9 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
21. Scaffold planks must be tied to or otherwise secured to the scaffold bearers.
a) True
b) False
22. The windsocks in Saudi Aramco facilities are to let people know in which direction a gas or
chemical leak will flow.
a) True
b) False
23. A Safety Officer must tour the site several times a day because conditions are changing
constantly during construction activities.
a) True
b) False
24. Dangerous safety hazards should be noted and kept in writing so that they can be reported at the
next Safety meeting.
a) True
b) False
25. A weekly Safety Inspection of each area should be carried out and a report of defects given to
those responsible for correcting them.
a) True
b) False
26. A Safety Officer checks all construction activities only. The personnel officer checks the
medical facilities, toilet facilities, drinking water and all things affecting health and welfare.
a) True
b) False
27. When hot tapping gasoline lines, it is very important to establish and maintain product flow.
a) True
b) False
28. It is okay to bring chemicals on site without a MSDS if you only have 20 liters of liquid or 10
cubic meters of a toxic gas.
729574789.doc Page 10 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
a) True
b) False
29. Crane operations must be stopped when the wind speed is over 10 mph?
a) True
b) False
a) True
b) False
31. Before use, all new lifting equipment should be subjected to a proof load test by the manufacture
and certified.
a) True
b) False
32. When performing excavation work and there is no known underground utilities, by suspected
utilities, it is permissible to use mechanical equipment to excavate.
a) True
b) False
33. If gloves are designed for one function, they may not protect against a different function even
though they may appear to be appropriate protective equipment.
a) True
b) False
34. When guardrail systems are used at hoisting areas, they must be across the access opening
between where the guardrail systems and the hoisting operation is taking place.
a) True
b) False
35. If the specific identity of a hazardous chemical is protected as a trade secret, then the specific
identity may be withheld from the MSDS.
a) True
b) False
36. Ergonomics include restructuring or changing workplace conditions to make the job easier.
729574789.doc Page 11 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
37. Material Safety Data Sheets need only be accessible to employers and shift-leaders or foremen.
a) True
b) False
38. When employers have multiple workplaces, the written Hazard Communication program may be
kept at only the primary workplace.
a) True
b) False
a) True
b) False
a) True
b) False
729574789.doc Page 12 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
Ans. Is intended for use at the job site by company representative and
contractor supervisor and safety officer.
Q.58.When an accident happen you shall…?
A) Call the police.
B) Clean up the accident area.
C) Report immediately to the company proponent.
D) All of the above.
729574789.doc Page 16 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 25 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 26 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 27 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 28 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 29 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 30 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 31 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
729574789.doc Page 32 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT
Section 1 Section 2
1. b 1. a
2. d 2. b
3. d 3. b
4. d 4. b
5. c 5. b
6. c 6. a
7. b 7. b
8. c 8. b
9. d 9. a
10. c 10. a
11. a 11. a
12. a 12. a
13. c 13. b
14. b 14. a
15. c 15. a
16. d 16. a
17. c 17. b
18. b 18. b
19. c 19. a
20. d 20. a
21. d 21. a
22. b 22. a
23. d 23. a
24. a 24. b
25. d 25. a
26. d 26. b
27. b 27. a
28. d 28. b
29. c 29. b
30. c 30. b
31. c 31. a
32. d 32. b
33. b 33. a
34. d 34. a
35. c 35. a
36. b 36. a
37. b 37. b
38. b 38. a
39. b 39. a
40. a 40. b
729574789.doc Page 33 of 34