EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
NAME _______________________________ COMPANY ___________________________ DATE
________________

Circle one of the suggested answers


SECTION 1:

1) Flammable materials storage areas cannot be located within _______ of other buildings or
structures:

a) 25 ft
b) 50 ft
c) 50 meters
d) 100 ft

2) When grinding a piece of metal with a portable power grinder, the type of Personal Protective
Equipment required is:

a) Safety glasses only


b) Goggles only
c) Face shield only
d) Safety glasses/face shield combination

3) The maximum voltage permitted for portable power tool is:

a) 110V
b) 220V
c) 240V
d) 110V with GFCI and 220V with RCD

4) The ratio of vertical to horizontal spacing for a straight or extension ladder is:

a) 1 to 1
b) 2 to 1
c) 3 to 1
d) 4 to 1

5) A straight or extension ladder must extend over the edge of a roof, excavation, or scaffold
platform by a minimum distance of:

a) 1 foot
b) 4 feet
c) 0.9 meter
d) No set distance

729574789.doc Page 1 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
6) The Saudi Aramco General Instruction which sets forth the Work Permit Receiver’s requirements
is:

a) GI 1.200
b) GI 5.430
c) GI 2.100
d) GI 6.200

7) If someone is injured on your job site, a preliminary written report must be submitted to the
Saudi Aramco PMT within ________ period of time:

a) 2 hours
b) 24 hours
c) 8 hours
d) 3 days

8) Work platforms must have toe boards, mid rails, top rails and access ladders once they reach a
height of ______:

a) 4 ft
b) 8 ft
c) 6 ft
d) When the height is four times greater than the base width

9) Excavation “Spoils” must be set back a minimum of _____ from the sides of the excavation.

a) 1 meter
b) 6 ft
c) 3 ft
d) 2 ft

10) The maximum working pressure on an acetylene gauge is ______ psig.

a) 7
b) 10
c) 15
d) 19.50

11) During storage of oxygen and acetylene gas cylinders they must be separated by (1) A Fire
Resistant Wall or (2) A Distance of ______ .

a) 20 ft
b) 50 ft
c) Not required if tanks are empty
d) Not required if protective caps are on
e) None of the above

729574789.doc Page 2 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
12) Which of the following would be classified as a Class “A” fire?

a) A fire involving ordinary combustibles


b) A fire involving flammable liquids
c) A fire involving combustible metals
d) A fire involving live electrical equipment

13) The soil type that is least stable in an excavation is:

a) Type A
b) Type B
c) Type C
d) None of the above

14) What is necessary for a worker to wear on a steel beam six feet or more above ground?

a) A steel belt with steel or brass couplings


b) A full body harness with lanyard attached to an anchor point
c) He must never go on a steel beam
d) None of the above

15) When there are openings in roof work and/or at edges of roofs, and a fall hazard exist, barricades
must be installed capable of withstanding a force of:

a) 100 lbs (45.4 kg)


b) 150 lbs (68 kg)
c) 200 lbs (91 kg)
d) 125 lbs (56.7 kg)

16) Which of the following factors does not affect the load capacity of a mobile crane?

a) Boom length
b) Boom angle
c) Extending the outriggers fully
d) Installation of a anti-two block device

17) How many clips are required to construct an eye in a one-half inch wire rope?

a) 3 clips with U-bolts on the live end


b) 4 clips with U-bolts on the live end
c) 3 clips with U-bolts on the dead end
d) 4 clips with U-bolts on the dead end

18) Class “B” fires involve flammable liquids or gases that could be under pressure. What would
give you most concern when selecting a Class “B” fire extinguisher?

729574789.doc Page 3 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
a) Exposure to electrical equipment
b) Depth of flammable liquid
c) Location of fire exits
d) Type of fire detectors present

19) How long is a Work Permit usually valid?

a) 1 month
b) 1 week
c) 1 shift
d) 1 day

20) How far apart shall access/egress ladders be in excavations?

a) 10 ft
b) 15 ft
c) 50 ft
d) 25 ft

21) When transferring an extremely flammable liquid from a 55 gallon drum via a hand pump to a
small metal safety can, which of the following provides the best protection?

a) Ground both containers


b) Bond both containers together
c) Bond containers together and ground each to a separate ground
d) Ground one container and then bond them to each other

22) A small mobile crane with rubber tires has struck a power line. The line, which is now believed
to be dead, is lying across the crane boom. Which of the following best describes the proper
course of action for the crane operator?

a) Jump from the crane and run away


b) Stay in the crane until emergency crews arrive
c) Have the oiler knock the line from the boom with a wood pole
d) Swing the boom back and forth until the line breaks or falls off

23) Caught-in hazards cause only minor injuries and are not a big concern to construction workers.

a) True because the caught in incidents are not high.


b) Not a big concern this time.
c) Absolutely true.
d) Absolutely false.

24) Which of the following is true concerning explosive proof equipment? Explosive proof
equipment is allowed to operate in a flammable or explosive atmosphere because it is capable of:

a) The explosion if it happens will stay inside the container

729574789.doc Page 4 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
b) Not producing sparks under any condition
c) Operating below the auto ignition temperature
d) Shutting down the equipment serviced in an emergency

25) How long should the appointed “Fire Watch” remain at the site of HOT work after the work has
stopped?

a) 10 minutes
b) 15 minutes
c) 20 minutes
d) 30 minutes

26) One purpose of the “Anti-Two-Block” device on cranes is?

a) To determine the weight of the load being lifted


b) To prevent cribbing blocks from contacting outrigger floats
c) To determine the length of the wire rope that has been extended
d) To prevent the overhaul ball from contacting the boom sheaves

27) What are the most important self-developed skills of a site safety officer?

a) Conduct site safety inspections with a checklist


b) Develop a safety inspection checklist based on knowledge and anticipated hazards
c) Conduct tool box safety meetings
d) Produce good looking reports

28) What is the number one cause of confined space deaths?

a) Explosive atmospheres
b) Oxygen enriched atmospheres
c) Hydrogen sulfide poisoning
d) Oxygen deficient atmospheres

29) When lifting over or adjacent to process piping, etc., what is required?

a) Hold Tag
b) Welding Machine
c) Rigger 1
d) Hot Work Permit
e) All of the above

30) What is used to control suspended loads?

a) Slings
b) Guys
c) Tag Lines
d) Shackles

729574789.doc Page 5 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
e) All of the above

31) If you found a fire exit blocked by a wooden pallet what would you do?

a) Leave it
b) Move it at quitting time
c) Move it immediately
d) Wait for someone else to move it

32) Before a Lift Plan can be used it must first be what?

a) Signed by the Superintendent


b) Singed by Operations
c) Copied and filed
d) Approved by a competent person or rigger 1

33) What is the permissible noise exposure for an eight-hour work shift?

a) 80
b) 90
c) 100
d) 120

34) What is the purpose of a hold tag?

a) To isolate or de-energize equipment


b) To work the job safely
c) To explain the reason why the equipment is being locked out
d) All of the above

35) Hold tags and locks are primarily intended to protect the individual who is doing the work from?

a) Being thrown in jail


b) Leaving until the work is completed
c) Being injured in case of accidental start up
d) Sleeping

729574789.doc Page 6 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
36) Where is a work permit required?

a) All Saudi Aramco Areas


b) In areas designated by the department managers as requiring a work permit
c) Construction work shop
d) None of the above

37) Health hazards associated with welding that are attributed to the reaction of the heat and specific
material to which it is being applied are called __________ agents.

a) Physical
b) Chemical
c) Either physical or chemical

38) Danger signs must be used only where a(n) ____________ hazard exists.

a) Potential
b) Immediate
c) Serious
d) Fatal

39) When using gas welding cylinders for devices with shutoff valves, a suitable regulator must be
used to reduce pressure. Prior to connecting a regulator, ______ must be done on the valve to
clear any dust or dirt that might enter the regulator.

a) Splitting
b) Cracking
c) Releasing
d) Suction

40) An electrical hazard that occurs when current flows through parts of the human body is referred
to as:

a) Shock
b) Burn
c) Explosion
d) Fire

SECTION 2

1. Respiratory protective devices can be classified as, air purifying, supplied air, & self-contained
breathing devices.
a) True
b) False

2. The new heavy plastic 5 gallon drums may be used to store, transport, and dispense diesel fuel
only.

729574789.doc Page 7 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION

a) True
b) False

3. When step ladders have steps on one side and rungs on the other, two men may be on the same
ladder at the same time:

a) True
b) False

4. Portable power tools being operated from an on site generator need not be protected by a GFCI
(ground fault circuit interrupter) to be consistent with the Saudi Aramco CSM.
a) True
b) False

5. Excavation not subject to vehicle traffic may be barricaded using Red and White Warning Tape:

a) True
b) False

6. Cigarette smoking is forbidden anywhere on Saudi Aramco construction sites except in


designated and approved smoking shelters.

a) True
b) False

7. Holes may be drilled into sides of hard hats to provide for cross ventilation air-flow during very
hot weather.

a) True
b) False
8. If a tool breaks it is permissible to weld a piece of pipe as a handle temporarily

a) True
b) False
9. Soap and paper towels must be provided for the men to clean up before meals.

a) True
b) False

10. Push sticks must always be used when guiding woodwork into a table saw.

a) True
b) False

11. Rubber boots must be provided for persons engaged in the pouring of concrete.

a) True
729574789.doc Page 8 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
b) False

12. When wearing rubber boots for concrete pours, it is not necessary to have your steel toe
boots/shoes on.

a) True
b) False

13. Placing an 8’2” X 12” board over two 20-liter paint cans is allowed for temporary work platform.

a) True
b) False

14. Formwork boards should be removed to the de-nailing area as soon as possible after they are
disassembled.

a) True
b) False

15. A fire extinguisher must be placed near (5 to 15 feet) to any combustion engine being operated
on site.

a) True
b) False

16. Tool-box safety briefing must be held at least once a week.


a) True
b) False
17. Methane is not an odorless and tasteless gas that is non-toxic.

a) True
b) False

18. Hand held power tools such as drills and grinders may be locked-on if the job is going to take a
long period of time to accomplish.

a) True
b) False

19. Permanent scaffolds should be secured by tying off to a firm portion of the structure every 26 ft.
vertically, 30 ft. horizontally, at each end, and the top.

a) True
b) False

20. Scaffold planks must be at least 2” thick by 9” wide or up to 2” thick by 12” wide.

729574789.doc Page 9 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
a) True
b) False

21. Scaffold planks must be tied to or otherwise secured to the scaffold bearers.

a) True
b) False

22. The windsocks in Saudi Aramco facilities are to let people know in which direction a gas or
chemical leak will flow.

a) True
b) False

23. A Safety Officer must tour the site several times a day because conditions are changing
constantly during construction activities.

a) True
b) False

24. Dangerous safety hazards should be noted and kept in writing so that they can be reported at the
next Safety meeting.

a) True
b) False

25. A weekly Safety Inspection of each area should be carried out and a report of defects given to
those responsible for correcting them.

a) True
b) False

26. A Safety Officer checks all construction activities only. The personnel officer checks the
medical facilities, toilet facilities, drinking water and all things affecting health and welfare.

a) True
b) False

27. When hot tapping gasoline lines, it is very important to establish and maintain product flow.

a) True
b) False

28. It is okay to bring chemicals on site without a MSDS if you only have 20 liters of liquid or 10
cubic meters of a toxic gas.

729574789.doc Page 10 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION

a) True
b) False

29. Crane operations must be stopped when the wind speed is over 10 mph?
a) True
b) False

30. All Accident must be reported to Saudi Aramco within 48 hours?

a) True
b) False

31. Before use, all new lifting equipment should be subjected to a proof load test by the manufacture
and certified.

a) True
b) False

32. When performing excavation work and there is no known underground utilities, by suspected
utilities, it is permissible to use mechanical equipment to excavate.

a) True
b) False

33. If gloves are designed for one function, they may not protect against a different function even
though they may appear to be appropriate protective equipment.

a) True
b) False

34. When guardrail systems are used at hoisting areas, they must be across the access opening
between where the guardrail systems and the hoisting operation is taking place.

a) True
b) False

35. If the specific identity of a hazardous chemical is protected as a trade secret, then the specific
identity may be withheld from the MSDS.

a) True
b) False

36. Ergonomics include restructuring or changing workplace conditions to make the job easier.

729574789.doc Page 11 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
a) True
b) False

37. Material Safety Data Sheets need only be accessible to employers and shift-leaders or foremen.

a) True
b) False

38. When employers have multiple workplaces, the written Hazard Communication program may be
kept at only the primary workplace.

a) True
b) False

39. Danger signs should only be use in immediate hazard areas.

a) True
b) False

40. It is permissible to enter an excavation to get a soil sample.

a) True
b) False

729574789.doc Page 12 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
BE SAFE ******* KEEP SAFE ******* FOLLOW THE SA RULES *******
Question and answers.
Q .1 .what is the time limit for preliminary report?
Ans . The Time limit for the preliminary report is 24 Hrs.
Q . 2. How many types of work permits in Saudi aramco?
Ans . Four (4) types of work permits in Saudi aramco.
Q .3. What shall be distance between flammable & bulk combustible storage?
Ans . Distance between flammable & combustible storage is 15 mt,50 ft.
Q .4. What is the safe procedure to lighting the torch cutting operation?
Ans. Safe procedure is using the spark lighter and striker.
Q. 5. What is the safety method to prevent cave ins in excavation?
Ans. The safe methods to prevent cave ins in excavation is sloping, benching &
shoring.
Q. 6. What is the frequency of 10 minutes safety talk?
Ans. The frequency of 10 minutes safety talk is weekly.
Q. 7. Explain the safe way to carry if load is at forklift obstruct the front view?
Ans. The fork lift should be reversed.
Q. 8. What safety device shall be used to prevent direct contact with an object
and circular saw?
Ans. The safety device is push stick.
Q. 9. What is the meaning of FM & UL?
Ans. FM=Factory Mutual & UL=Underwriters Laboratories.
Q .10.What is the voltage rating preferred/allowed to use In Saudi Aramco
facilities?
Ans. The preferred and allowed voltage in SA facilities is 110 volts.
Q.11.What is the main component of standard guardrail system?
Ans. The main component is post (standard)
Q. 12.What you will explain during orientation to the newly mobilized workers, give
at least three?
Ans. About the PPE, sanitary, evacuation plan & SA rules and regulation.
Q.13.What are the basic PPE in construction site, give at least five?
Ans. Safety goggles, hard hat, safety hand gloves, safety shoes, ear plugs and
safety coverall.
Q.14.What is the safety method being used to prevent static electricity built up?
Ans.The safety method is Grounding
Q.15.What is the safety device that can be used in circuit to prevent short circuit,
electric fire etc?
Ans. Using of GFCI (Ground fault circuit interrupter)
Q.16.Who will certify the operator of cartridge tools?
Ans. The vendor or the manufacturer.
729574789.doc Page 13 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Q .17.What is the Aramco standard stated that how water dispense of people?
Ans.Every job site.
Q.18.what is the basic requirement for a crane to use in SA site?
Ans.Having the valid Saudi aramco inspection sticker.
Q.19.What safety device shall be use if someone assigned as a flagman?
Ans. Reflected orange color vest and green & red flags.
Q.20.How to protect the cylinder if it is not in use?
Ans.Cylinder shall protect with valve cap.
Q.21.What is the color of oxygen cylinder?
Ans. Green color.
Q.22. Gas test is required below the depth of?
Ans. Gas test is required for 4 feet or deeper.
Q.23. Angle, slope and rating of the ladder placement?
Ans. Above 3ft from the landing area,75’digree and in every 25 feet.
Q.24.What type of fire extinguisher shall be use for class”C”fire?
Ans. DCP, dry chemical powder, CO2
Q. 25. What type of fire extinguisher shall be use for class”A”fire?
Ans. Water type, O2
Q.26. No vehicle or plant shall be operateted unless the operator holds?
Ans. unless they hold Work permit.
Q27. What shall be used to prevent flash backfire in gas cutting torch?
Ans. Flash back flame arrestor.
Q.28.Who authorized to receive, request and obtain the work permit?
Ans.Saudi Aramco certified work permit receiver.
Q.29. what is the type “A” soil?
Ans. Rock and clay
Q.30. Give reason why accident need to be reported?
Ans. To prevent further accident in future.
Q.31. what is the normal contact of oxygen inside the confined space?
Ans. The normal contact of oxygen in confined space is 19.5 to 23.5%.
Q.32. what is the duty of the standby man?
Ans. To watch the workers and assist in job.
Q.33. give at least three duties of the safety officer?
Ans. Educate the employees, reporting and monitoring the workers vehicle,
equipment etc, from hazardous..
Q.34. what is the meanings of LEL?
Ans. The meaning of LEL is lower explosive limit.
Q.35.What is the meanings of the PPM?
Ans.The meanings of PPM is, part per million.
Q.36. in which H2s concentration level require breathing apparatus?
729574789.doc Page 14 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans. Self contains breathing apparatus require, (SCBA) on 10 ppm.
Q.37. what main purpose of lock and tag out (LOTO) system?
Ans. To avoid injury, release of energy and prevent accident.
Q.38. how many hours exposure allowed when working 90dbA level?
Ans.08 hours only.
Q.39.What is MSDS?
Ans.MSDS is Material safety data sheet.
Q.40. what you can find in MSDS?
Ans. Hazards material and classification.
Q.41. What should be discussed in safety toolbox meeting?
Ans. How to work safely and discussion about the previous unsafe condition and
activities.
Q.42. what you will do when H2s leak encountered?
Ans. Stop the work, shut off the equipment and go to the assembly point.
Q.43. what is the ratio of number of toilets required on work site?
Ans. 1 toilet for 15 workers.
Q.44. who is responsible for the work permit?
Ans. Permit receiver is responsible for work permit.
Q.45. Cylinder is not designed for temperatures excess on?
Ans. Maximum 54 degree.
Q.46. all lamps shall be enclosed by?
Ans. Vacuum….
Q.47. Are eye or flash is a well known condition in welding operation and is due
to the eye being expose to ?
Ans. Yes.
Q.48. Full body harness shell be worn at all work areas where a man could fall?
Ans. Yes, full body harness with shock absorbing lanyard shell be use ,if the height
is 6 feet or greater.
Q.49. Lanyard length shall be?
Ans. Lanyard length shall be 18 feet.
Q.50. During the use of manbasket the lanyard shell be secured to?
Ans. The lanyard should be secured to the crane hook.
Q.51. Hydrostatic and pneumatic strength pressure testing and leak testing shell
comply with GI?
Ans.These tests shell be comply with GI 2.102
Q.52. What is the distance for crane boom, if the overhead power lines up to
250,000 volts?
Ans.The crane boom distance should be 20 feet for up to 250,000 volts.
Q.53. what is the distance of the night time warning lights spaced, and above the
ground level?
729574789.doc Page 15 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans.Night time warning lights distance between 2 feet & 3 ft above the ground
level.
Q.54.Give five equipment name which are required aramco inspection sticker?
Ans. Crane, Side boom, man lift. man basket, spider basket.
Q.55.When required ear plug\ear muff?
Ans. Ear plugs need on 85dBa and ear muff need on 90dBa or above.
Q.56. How much First Aid trained required on one remote site?
Ans. 1 Trained first aider need in one remote site.
Q.57. The CSMH…
A) Is condensed version of the full size CSM?
B) List common safety rules for Saudi Aramco construction.
C) Is intended for use at the job site by company representative and contractor
supervisor and safety officer.
D) All of the above.

Ans. Is intended for use at the job site by company representative and
contractor supervisor and safety officer.
Q.58.When an accident happen you shall…?
A) Call the police.
B) Clean up the accident area.
C) Report immediately to the company proponent.
D) All of the above.

Ans. Report immediately to the company proponent.


Q.59.With in……..of being aware of an incident the company representative shall
notify the area loss prevention officer?
A) 1 Hr.
B) 1 day (24 Hrs)
C) 6 Hrs
D) 12 Hrs
Ans. 1 day (24 Hrs).
Q.60.Contractor safety officer or site safety supervisor shell…?
A) Interact with company representative on health & safety issues.
B) Inspect work site daily.
C) Keep record of all safety meeting.
D) All of the above.
Ans. All of the above.
Q.61.The contractor must provide one toilet for every…..?
A) 50 workers

729574789.doc Page 16 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
B) 15 workers
C) 02 workers
D) 10 workers.
Ans. B, 15 workers.
Q.62.Safety belts (waist belt) shall be used for fall arrest if it is rated at 2450
kg.?
A-True
B-False
Ans. False.
Q.63.The Saudi aramco sanitary code state that…?
a- eating is allowed on the site.
b- you shall provide 1 toilet for every 50 workers.
c- you shall provide drinking water and a dipper.
d- Non of the above.
Ans. Non of the above
Q.64. Housekeeping required are…?
a- collect trash, debris and refuse monthly.
b- Use opened topped containers for trash.
c- bend-down or remove nails in board.
d- all of the above.
Ans. bend-down or remove nails in board.
Q.65. site planning for the lay down yards include…?
a- proponent approved lay down yards shall be at least 30 meter (100 ft) away
from building.
b- A study and grounded perimeter fence with fire engine access gate shall
enclose the area.
c- Fire protection is not required as per CSM appendix C.
d- All of the above.
Ans. b- A study and grounded perimeter fence with fire engine access gate
shall enclose the area.
Q.66. The contractor shall provide First Aid facilities for his employees which
include…?
a- A first aid cabinet in each job site.
b- At least one man at every job site shall be trained in first aid.
c- a dedicated emergency vehicle(ambulance)must be provide to transport
injured persons.
d- All of the above.
Ans. All of the above.
Q.67.When more than 50 employees’ work inside a15 kilometers radius, there
shall be ….?
729574789.doc Page 17 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
a- a male nurse or first aid facility.
b- A toilet.
c- A fire extinguisher.
d- Non of all the above.
Ans. a male nurse or first aid facility.
Q.68. a full body harness shall be prevent fall greater then …?
a- 1 meter, 3.3feet
b- 1.5 meter, 5 feet
c- 1.8 meter,6 feet
d- Non all of the above
Ans. 1.8 meter,6 feet.
Q.69. Foreman/supervisor shall…?
a-prepare and submit an HIP for loss prevention review and approval
b-investigate accidents and report’s findings.
c-conduct weekly Safety meeting
d-assure that work permit procedure is followed by all subordinates.
Ans. conduct weekly Safety meeting
Q.70.a preliminary report is due within 24 hrs complete with a copy to loss
prevention.
a –True
b -False
Ans. True
Q.71. Drivers shall not allow passengers to ride in their vehicle unless they have
seat belt and use it, except busses where a seat belt is mandatory for drivers.
a-True
b-False
Ans-True
Q.72.Heavy equipment drivers shall…?
a-cover the windows to protect their eyes from sun.
b-allow passengers to ride their vehicle without wearing a seat belt.
c-drive with speed if there is no vehicle in front of him.
d-report any accident or damage immediately.
Ans. report any accident or damage immediately.
Q.73.There are three kind of work permits in Saudi aramco system.
a-True
b-False
Ans.False.
Q.74.countersignature shall be obtained by issuers and receivers.
a-True
b-False
729574789.doc Page 18 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans-False
Q.75.Gas testing for the work permit should be done by….?
a-A Saudi aramco certified gas tester.
b-The contractor.
c-The inspector.
d-Non of all above
Ans.Saudi aramco certified gas tester.
Q.76.The work permit should be revised if there is any change in the condition.
a.True
b.False
Ans.True
Q.77.Common excavation risks include..?
a-Cave in
b-Toxic gases
c-striking buried service line
d-All of the above
Ans.All of the above
Q.78.Shoring for excavations shall include…
a-vertical excavations that are greater 2.4 meter(8 feet)deep shall be shored.
b-shoring boxes shall be kept occupied during movement and installation.
c-trench shield walls must extend above the excavation walls.
d-non of the above.
Ans. vertical excavations that are greater 2.4 meter (8 feet) deep shall be shored.
Q.79.Transportation for the flammable liquids shall be in closed metal containers.
a-True
b-False
Ans-True.
Q.80.Ladders at the excavation should be placed within shored area and tied off
to prevent slipping…
a-True
b- False.
Ans.True
Q.81.slope walls are not acceptable as a substitute for shoring…
a- True
b- False.
Ans. False.
Q.82.Type……….soil is mix of sand, rock and clay must be slope..
a. A ¾ 1 slope or 53degree
b-B, 1 to 1 slope 45 degree
c- C 1.5 slope or 34 degree
729574789.doc Page 19 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
d-none of the above
Ans.B, 1 to 1 slope 45 degree
Q.83.Exit ladder at confined space entry in to a 1.2 meter (4feet) deep or deeper
trench....
a-must be placed every 7.5 meter (25 feet) set at 75 degree angle.
b-shall not be extended above the ground level.
c-must be secured.
d- only answer A, and C,are correct.
Ans. only answer A, and C, are correct.
Q.84.For demolition, the approved HIP should be described the following…
a-Isolation of specific utility service.
b-Debris from demolition shall not be rendered because it may be used later.
c-Work permit requirement.
d-All of the above.
Ans. Isolation of specific utility service.
Q.85.When working where asbestos and other are present…?
a-paper dust mask should be worn.
b-showering and washing facilities should be provided to all asbestos workers at all
job site and used daily by each man.
c-beard will allow a safe seal with respirator.
d-non all of the above.
Ans. showering and washing facilities should be provided to all asbestos workers at
all job site ad used daily by each man.
Q86.When you want to remove asbestos….
a-use electrical tools to cut and remove asbestos.
b-wet asbestos with water before remove the asbestos.
c-use vcume
d.non all of the above.
Ans. wet asbestos with water before remove the asbestos.
Q.87.Acetyline become unstable at pressure of…….103 kpa (15psi)
a-equal
b-below
c-above
Ans.to make it easy to be stored.
Q.88.the reason that the acetylene cylinders be stored, handled, and used in the
vertical position is….
a-to prevent the acetylene and liquid acetone from separating.
b-to allow it mix with air
c- to make it easy to be stored.
d-non of all above.
729574789.doc Page 20 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans, to prevent the acetylene and liquid acetone from separating.
Q.89.in order to store cylinder safely…..
a-they should be store in safe, dry and well ventilated area.
b-flammable substances should not be stored in the same area.
c- They should not be stored near a source of heat.
d-all of the above.
Ans. All of the above.
Q.90.Welding and cutting torches shall be..
a- construct of brass, stainless steel,
b- bear FM & UL label.
c-have color code hashes.
Ans.All of the above.
Q.91.flashback flame arrestors should be place on both regulator and torch…
a.True
b- False
Ans.False.
Q.92.Oil grease may be used on oxygen cylinder fittings or systems…?
a-True
b-False.
Ans. False
Q.93.Hand held power tools that are plugged in to a welding machine.
a-shall have GFCI.
b-shall be made from conductive material.
c-are not allowed.
d-non of the above.
Ans.shall have GFCI.
Q.94.welding hoods shall be worn by the welder and helper.
a- True
b- False.
Ans.True.
Q.95.Compressed gas cylinders requirements…
a- don’t use cylinders have dents, rust, gouges and burn marks.
b-make empty cylinders “MT” with chalk.
c-remove from service any compressed gas cylinder in violation of regulation.
d-All of the above.
Ans.All of the above.
Q.96.Leak check on cylinders may be done by….
a-using a lit match
b- apply a soapy water solution
c-listening for a hissing sound.
729574789.doc Page 21 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
d-non of the above.
Ans.apply with soapy water.
Q.97.A work permit is not required for blasting operation.
a-True
b-False.
Ans.False.
Q.98.The…….is responsible for all safety aspects of the explosive operation.
a-safety officer
b-Blaster in charge.
Ans.Blaster In charge.
Q.99.Pressure testing (GI 2.102) covers what types of tests?
a-Hydrostatic
b-leak tests
c-pneumatic tests
d-all of the above.
Ans. All of the above.
Q.100.Damaged ladder should be ….
a-painted
b-remanufactured
c-remove from the site.
d-all of the above.
Ans .remove from the site.
Q.101.Extension ladders shall be extended 0.9 meter (3 feet) above the landing
surface.
a-True
b-False
Ans.True
Q.102.Erected scaffold require that ….
a-erection and assembly shall be done by trained and authorized person.
b-inspection shall be made every day.
c-that erection plan is submitted to loss prevention for all scaffoldings above 38
meter (128 feet).
d-All of the above.
Ans.All of the above.
Q.103. scaffolding planks…..
a- shall be painted
b-shall not be cracked more than 12 “.
c-shall not extend beyond the frame
d-All of the above.
Ans.shall not be cracked more than 12 “.
729574789.doc Page 22 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Q.104.Dont support scaffold on concrete blocks,barrel and scaffold planks.
a-True
b- False
Ans-True.
Q.105.What is safety?
Ans.Controle of accidental loss of resources, human & material.
Q.106.What is an accident?
Ans.an undesirable event that causes harm to personal and damage to property.
Q.107.What is a near miss?
Ans.an undesirable event which has the potential to cause loss or damage.
Q.108.What is fire?
Ans.Fire is a chemical reaction of Heat, Fuel and Oxygen.
Q.109.What is the time frame that preliminary written report shall be submitted in
the event of an accident involving in your company’s employees or damage to
Saudi aramco equipment or property?
Ans.The time frame for the preliminary written report to the loss prevention
department is 24 Hrs or 1 day.
Q.110.Where is the safe place to smoke if any working in Saudi aramco project or
within SA facility?
Ans.The safe place for smoking in SA projects is,Designated smoking area.
Q.111.What method is used to prevent static electricity from becoming an ignition
source for flammable liquids?
Ans.Grounding and bonding method.
Q.112.what is the proper eye wear to have on when using a portable grinder?
Ans.Face shield with goggles combination.
Q.113.What are the general, PPE, required for all employees working on SA
projects?
Ans.Safety shoes, safety gloves, hard hat, ear plugs, safety goggles.
Q.114.What additional PPE must be worn if any working on height greater then 6
meter?
Ans.Full body harness with shock absorbing lanyard.
Q.114.What is the minimum eye protection when using oxygen acetylene cylinders?
Ans.The minimum eye protection is, face shield and goggles.
Q.115.What type of respirator is required if any when spray painting?
Ans.Respiratory mask.
Q.116.What is the required safe distance between flammable storage area and the
nearest building storing combustible?
Ans.The safe distance between the flammable storage and combustible storage
building is, 15 meter (50 feet)
Q.117.What type of container must be used to transfer flammable liquid?
729574789.doc Page 23 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans.Garry cans (on steel container)
Q.118.What type of extinguisher should be used to extinguish a fire involving
class,A,material?
Ans.to extinguish class ,A, fire O2(water type) shall be used.
Q.119.What type of certification is required to operate a motor vehicle on SA
project?
Ans.Saudi Arab Government (SAG) license and SA certificate.
Q.120.When a confined space permit is required in an excavation if ever…?
Ans.Greater 4 feet.
Q.121.What is one method making deep excavation safe to work?
Ans, Slope, Benching, Shoring.
Q.122.How far should placed access/Exit ladder in an excavation, extend above the
top of the excavation?
Ans.1 meter (3 feet).
Q.123.How far apart should ladder in excavation be placed?
Ans.1 meter.
Q.124.When a mobile scaffold is moved, with men and material on the scaffold?
Ans.Never…
Q.125.How far apart should oxygen cylinders and flammable gas cylinders are
stored?
Ans. The distance between flammable gas and oxygen cylinders is 20 feet and 5
feet in height.
Q.126.What is the proper storage procedure for compressed gas cylinder?
Ans.always in upright position or in cylinder racks.
Q.127.What should be used to protect the valve of a compressed gas cylinder
when it is not in use?
Ans.Cylinder valve cap.
Q.128.What is the proper procedure for lighting and cutting torch?
Ans.using of striker is the proper procedure.
Q.129.Screw jack for scaffolding are for what purpose?
Ans.to level the scaffold in uneven ground.
Q.130.What safety equipment is required for flagman posted along?
Ans.Orange Color reflected vest and Red & Green Flags.
Q.131.Sacaffold can be tagged with one of three scaffold tag, name the tag, color
and what each tag means?
Ans.Red > Do not use. Green > Safe to Use. Yellow > use with full body harness.
Q.132.What is the safe method to prevent an extension ladder from moving and
falling?
Ans.Splicing with each other. (Tied off to each other)
Q.133.What is the main component of a standard scaffold guardrail?
729574789.doc Page 24 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Ans.Toe board,Mid rail, Top rail.
Q.134.Any scaffold over 38 meter (125 feet) tall or any scaffold cantilevered by
more than 3 meter (10 feet) or any scaffold supported or hung from one or more
outriggers beams are what type of scaffold?
Ans. Special Scaffold.
Q.135.What is the required voltage for all portable power tools on a SA
construction project?
Ans.The required and allowed voltage is 110 volts.
Q.136.What must be done prior to changing a grinding disk on a portable
grinder?
Ans.Proper spanner, remove plug and disconnect.
Q.137.Who can certify a worker to use a cartridge operated tools?
Ans.Vendor/manufacturer.
Q.138. what is required for all 120 volt single phase, 15 and 20 ampere receptacle
outlet on construction sites that are not a part of the permanent wiring system?
Ans.GFCI(Ground Fault circuit Interrupter).
Q.139.What safety device must be present in grinder that, the operator from
contact with blade?
Ans, Safety Guard.
Q.140.What is one of the condition that must be meet to an air compressor to be
use for a breathing air?
Ans, Respirator and Grade D.
Q.141.What should an oxygen color?
Ans,Oxygen color is Green.
Q.142.Scaffold is built over 6 meter, 20 feet height the scaffolding tag sign by
whom?
Ans,Scaffolding Inspector or the scaffolding supervisor.
Q.143.Workers in an excavation have to be within how many meter ,feet of an
access/egress ladder stair etc.?
Ans,An every 25 feet.
Q.144.What is required to automatically shut off abrasive blasting nozzles?
Ans,Dead man switch.
Q.145.Supplied air for abrasive blasting hood or respirator,shall be what grade of
air?
Ans, The supplied should be in grade, D,
Q.146.What wind speed shall all crane lifts be stopped?
Ans,32 kph or20 mph.
Q.147.What shall be used to control all loads lifted by cranes?
Ans. Tag line should be used to control the lifted loads.

729574789.doc Page 25 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
Q.148.When Hydrogen sulfide (H2s) alarm sounds in which direction, do you travel
get out of the H2s hazardous zone?
Ans, up wind and cross wind direction.
Q.149.What color of (H2s) Hydrogen sulfide?
Ans, Hydrogen sulfide H2s is colorless.
Q.150.A low concentration a distance odor is given off the H2s gas What is that
odor?
Ans,Go to upper places.(odor is like rotten egg)
Q.151.An angle grinder has a revolution per minute (RPM) speed of 10000 RPM the
grinding disk must have higher or lower RPM speed?
Ans, Always higher.
Q.152.How long should be trained fire watch remain at the hot work area after the
work has stopped?
Ans, up to 30 minutes after completion the work.
Q.153.The device that prevents the crane hook from making contact
With the crane boom sheaves is called what?
Ans,That device is called Anti two block.
Q.154.What safety device should be in place during all welding operation to
prevent injury to nearby workers?
Ans,Welding tent.
Q.155.What is the minimum number of time that a contractor should conduct a 10
minutes safety meeting before each work?
Ans,Weekly once.
Q.156.What topic would you discuss when giving a safety orientation to the newly
hired employees.
Ans, about PPE, How to work safely, about camp sanitation, about company rule
and regulation and defensive driving.
Q.157.What are the three point of safety orientation?
Ans,Plant orientation,emergency response procedure and client policy.
Q.158.How many times safety talk be conducted during a month?
Ans,Weekly basis 10 minutes duration required as well.
Q.159.Does it need critical lift plan for crane operation using manbasket?
Ans,Yes,Rigger one should prepare the lifting plan.
Q.157.

729574789.doc Page 26 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION

Set I - Interview Questions

1. What are the things to consider prior to lifting or rigging?


a. Certification of rigger and crane operator
b. Weight of load against the capacity of the crane
c. Rigging hardware to be used shall be acceptable and bearing the monthly inspection tag.
d. Provide barricade and signage to prevent workers from passing beneath the load.
e. Wind speed
f. Approved working permit
g. Positioning of the crane
h. Overhead obstruction
i. Condition of the surroundings
2. How would you consider the scaffold is safe for use?
a. Erected according to the required capacity such as light duty, medium duty and special
b. Complete parts such as access ladder which is installed at 75 degrees and overlap at 3 feet from the
landing/platform.
c. With toe board, railing, braces and drop bar.
d. Erected at stable ground.
e. Duly inspected and properly tagged with green.
3. Who is the appropriate person to inspect a scaffold?
a. 6 meters and below shall be inspected by Scaffold Supervisor
b. 6 meters to 38 meters and Special Scaffold shall be inspected by Scaffold Supervisor and Inspector
4. Classify Rigger I, II, and III.
a. Rigger I –all level of lifts, authorized to prepare and sign a rigging plan
b. Rigger II – 40 tons and below, authorized to prepare a rigging plan but not authorized to sign.
c. Rigger III – 10 tons and below

5. Emergency procedures when the alarm sounds.


a. Stop the work
b. Alarm others
c. Call for help (cell phone, radio, runner)
i. Say, this is an emergency (state the nature of emergency)
ii. Location of emergency
iii. Report injuries, if any
iv. Give your name and badge number
v. Repeat the above information Control emotions while reporting and stay on the line until further instruction.
d. Proceed to designated assembly point.
e. Remain at assembly point until all clear.

Set II - Written Examinations

1. Required height to use full body harness.


6 feet or 1.8 meters
2. Personal protective equipment for grinding
Face Shield
Safety Glass
Gloves
Ear plug
3. General Instruction (GI) number for work permit
GI No. 2.100
4. What are the classes of fires
a. Class A Fire – Ex. Wood, garments, fabrics, plastic.

729574789.doc Page 27 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
b. Class B Fire – Ex. Flammable and combustible liquid, grease
c. Class C Fire – Ex. Energized electrical equipment/appliance
d. Class D Fire – Ex. Metal Magnesium, Lithium
5. Level of oxygen concentration to allow Confined Space Entry
a. 20% to 23.5%
6. Soil types and its required slope according to Saudi Aramco
Stable Rock - 90 degree. Refers to natural solid mineral matter which can be excavated with vertical sides and
remain intact while exposed.
Type A - 53 degrees. Type A soils include clay, silt clay, sandy clay, clay loam, caliches, hardpan, and
sometimes silty clay loam and sandy clay loam.
Type B - 45 degrees. Type B soils include granular cohesion less soils like angular gravel, silt, silt loam,
sandy loam, and sometimes silt clay loam and sandy clay loam;
Type C - 34 degrees. Type C soils include granular soils such as gravel, sand and loamy sand; submerged
soil; soil from which water is freely seeping; submerged rock that is not stable; or material in a sloped, layered
system where the layers dip into the excavation
7. Distance of excavated soil from the edge of excavation.
0.6 meters OR 2 Feet
8. Safe distance of equipment to be operated from the edge of excavation.
1.8 meters or 6 Feet
9. Depth of an excavation which is considered as confined space.
1.2 meters OR 4 Feet
10. Interval of ladder in excavation.
7.5 meters
11. Overlap of a ladder from the landing of platform
3 feet
12. Chemical safety
Read its Material Safety Data Sheet to know the properties of the substance and the following:
a. Potential hazards
b. PPE required
c. Safe handling, use and disposal
d. Storage
e. Spill handling procedures
13. Slope for using straight ladder
75 degrees
14. Storage of compressed cylinders
a. Oxygen cylinders in storage will be separated from fuel gas cylinders or combustible materials (especially oil or
grease) at a minimum distance of 6.1 meters (20 feet) or by a noncombustible barrier at least (6 feet) 2 meters
high having a fire-resistant rating of at least 30 minutes.
b. Valves of empty cylinders shall be closed and capped.
c. Empty cylinders shall be marked and separated from full cylinders.
d. A signage indicating the contents of the cylinder and restriction "NO SMOKING" and “FLAMMABLE GAS”
shall be posted outside the storage areas.
e. Cylinders shall be stored in a rack with sound flooring. Storing directly on the ground is strictly forbidden for it
corrodes its base.
f. A separate area shall be provided for cylinders of each individual material stored. Name of the material in each
storage area shall be posted.
g. Cylinders should be stored in a cool dry well ventilated, and equipped with compartment, or dividing walls 1.5
meters (4.9 feet) high which have a fire resistance of one hour.
h. Cylinder, valves and apparatus shall be kept free from oily substances.

729574789.doc Page 28 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
i. Cylinders shall be stored away from sources of ignition such as sparks, hot slag and flames or be adequately
protected.
j. Compressed cylinders shall be secured with chains in an upright position at all times even in the storage area
and cage where unnecessary movement is evident.
k. Propane cylinders shall be stored horizontally with the rupture disc in the ‘UP’ position. Do not store them in
direct sunlight. Nitrogen cylinders should be stored in a shaded place where they will not be exposed to
extreme temperatures.
l. Do not allow oxygen to come in contact with hydrocarbons/ highly flammable substances (e.g. oil, gasoline,
waste, grease) in any form. Do not store oxygen cylinders with cylinders containing hydrocarbon (e.g.
propane).
15. Safe distance between oxygen and fuel gas cylinders.
6.1 meters
16. Wind speed wherein crane lifts is not allowed
32 KPH for lifting activities in general
25 KPH for man basket operation
17. General Instruction (GI) number for elevating work platform
GI 7.027
18. The distance manholes from hot works that must be covered properly
75 feet
19. The correct procedure when bonding steel containers for flammable liquids to the ground.
The grounding cable shall be attached first to the grounding rod or structure before connecting to the containers to be
grounded to ensure that static electricity or static charge will not produce during connection of grounding clamp to
the container.
20. The allowable working pressure for using acetylene cylinders.
Not to exceed 15 psig.
21. Maximum voltage for portable electrical hand tools.
125 Volts
22. Minimum safe distance for a line voltage of 50KV to 250KV
6 meters
23. Minimum safe distance for a line voltage over 250KV
7.5 meters
24. Maximum voltage of lighting in a confined space
24 volts
125 volts can be used provided it is an explosion proof and provided with GFCI
25. The hook block with a 10 tons capacity is having a 10 part line. What is the capacity of each part line.
2,200 lbs.
26. Safe practices when using a circular saw
a. Use push stick
b. Moving parts shall be properly enclosed except the blade during use.
c. De-energize the equipment when not in use and cover the blade.
d. Wear mess gloves, dust mask and other basic PPE.
e. Presence of mind during the operation of the machine.
f. The blade shall be covered and the power supply shall be de-energized when not in use.
g. If working with colleague, maintain proper communication
27. Height of top rail from the working platform
a. 38” to 45”
28. Erection and design of special scaffold
a. Special scaffold shall be erected by Specialized Scaffold Erector
b. Shall be inspected and tagged by Certified Scaffold Supervisor I and Inspector

729574789.doc Page 29 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
c. Scaffold Plan shall be prepared by Specialized Scaffold Erector (Company authorized to erect scaffold).
Scaffold Plan shall be reviewed by Proponent, Loss Prevention Area Office and the Consulting Services
Department.
Characteristics of Specialized Scaffold

 Any scaffold over 38 meters (125 feet) tall


 A tube and coupler scaffold which exceeds the maximum height limits in Section 9.11 of the Saudi Aramco
Scaffold Safety Handbook.
 Any scaffold cantilevered by more than 3 meters (10 feet).
 Any scaffold (except bracket scaffolds) with a total platform area over 30 square meters (320 sq. ft.) which is
supported by or hung from an existing structure or building (e.g., roof, pipe rack, offshore platform).
 Any scaffold supporting loads greater than 240 kg/sq.m. (50 psf), including piping, equipment, masonry, new or
existing structures, or loads other than workers and their materials.
 Any scaffold supported by or hung from one or more outrigger beams.
 Any scaffold supported by or hung from wind girders or roofs of floating roof tanks.
29. Dimension of a sole board
1-1/2 in x 9 in x variable length
30. General Instruction for Scaffold Erection
GI No. 8.001
31. Safe distance of flammable materials from the source of ignition
15 meters

729574789.doc Page 30 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION

Sl.# Question Name Answer Remarks


1 Permit to work G.I. G.I. 2.100
2 Tool Box Meeting when should be held Every new activity
3 Crane out rigger pad should be 150%
4 Wire rope load capacity 1” 8 Ton Formula: 1” * 8ton = 8 ton
5 Excavation slope should be in 45 degree
6 Excavation slope formula 1.5 e.g. if deep 3 meter and
wide 4 meter: should be
4.5 meter should slop
distance
7 Hard barricading / top rail of scaffold 200 pounds
capacity should be
8 Between Camp building and fence distance 15 feet
9 Can Diesel / oil store in a heavy plastic gallon False Should be metal
10 Scaffolding planks size 2” * 9” / 2” * 12”
11 Gas Testing Procedure according to G.I.2.709
12 Crane Lifts Procedures according to G.I.7.028
13 Crane should stay away from trench or 1.8 meter
excavation edge.
14 Wind speed max. for crane lifting 20mph
15 Every platform max. distance 6 meter
E.g. a tower scaffold means then ladder
should not go direct, after 6 meter shall be a
platform.
16 Scaffolding procedure should be according G.I.8.001
17 Fire for combustible materials A type Fire extinguisher
18 Electrical max volte can use should be 125v
19 After hot work fire watch shall stay till 30 minute
20 From a fire extinguisher how much time 8 to 15 second Depend on kg.
fight
21 If deep excavation more than 1.2m Call confined space
meter
22 If an excavation more than 75 meter length, Every 25 meter should
Then how many ladder should use as access be a ladder as access.
23 Soil type C Muddy, soft etc..
24 Diesel generator should away from 20 meter
combustible material / gas cylinder.
25 Site toilet how many for workers 1 toilet for 15 worker
26 Between laydown to site distance min. 50 meter
27 Spoil pills from edge of excavation or 2 feet
trench
28 Scaffolding bracing zigzag should be 32 degree to 53 degree
between
29 Noise levels 85 dB For 8 hours
30 Man basket should not use more than wind 25kmph.

729574789.doc Page 31 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION

729574789.doc Page 32 of 34
EAST WEST PIPELINE PROJECTS DEPARTMENT

CONTRACTOR SAFETY PERSONNEL


EVALUATION
80 Questions Requiring 80% to Pass
(Correct Answer to 64 Questions)
ANSWERS

Section 1 Section 2
1. b 1. a
2. d 2. b
3. d 3. b
4. d 4. b
5. c 5. b
6. c 6. a
7. b 7. b
8. c 8. b
9. d 9. a
10. c 10. a
11. a 11. a
12. a 12. a
13. c 13. b
14. b 14. a
15. c 15. a
16. d 16. a
17. c 17. b
18. b 18. b
19. c 19. a
20. d 20. a
21. d 21. a
22. b 22. a
23. d 23. a
24. a 24. b
25. d 25. a
26. d 26. b
27. b 27. a
28. d 28. b
29. c 29. b
30. c 30. b
31. c 31. a
32. d 32. b
33. b 33. a
34. d 34. a
35. c 35. a
36. b 36. a
37. b 37. b
38. b 38. a
39. b 39. a
40. a 40. b

729574789.doc Page 33 of 34