ENGG / DESIGN
SN. Action(s) Highlighted RESP. Status (O / C)
1 RB circuit with headers shown. Difficulty in forming the circuit. Separate circuit shown now with & without header Vinod Closed
2 Hb & RB circuit shall be marked clearly. Vinod Open
3 HB & RB end plate identification needs to be shifted to be visible to operator while forming circuit Vinod Open
4 Header bead details were missing on header drawing. Vinod Open
5
6
7
MANUFACTURING
SN. Action(s) Highlighted RESP. Status (O / C)
1 Brazing Fixture required for header & Core to Header Assy Brazing for production order. Shahsin Open
2 Coil were water leak tested. Coupler Available. Shahsin Closed
MARKETING
1 No issue NA NA NA
2
3
PURCHASE
Supplier
SN. Action(s) Highlighted Name UNIT COST Status (O / C)