HAZARD EFFECT
High Consequence Not 100% certainty but an additional factor
5 25 20 15 10 5
Single death or severe injury. Damage to may be required to cause the event.
4 20 16 12 8 4
Moderate Consequence factors are present but are unlikely to occur I am aware of risks and mitigations contained in
3 Lost Time Injury. Severe damage to
equipment. Significant loss of production. 3 otherwise. May occur once in the lifetime of
the installation
this TRA.
3 15 12 9 6 3
Moderate environmental pollution
Area Authority
Slight Consequence Unlikely
Safety Officer
2
Minor Injury requiring first aid treatment.
Damage to equipment requiring minor
remedial repair. Minor loss of production or 2
A rare combination of factors would be
required for an incident to result. Event not 2 10 8 6 4 2
expected to occur in the lifetime of the
damage to the environment
1 5 4 3 2 1
Installation
environment
Task Risk Assessment
Task Risk Assessment Summary Details EHS Statement Approved by Manager
1. Visual inspection of all the Work Areas. ▪ It is the right of any individual to stop the work scope at any time if Signature:
2. Visual Inspection for Generator they feel their own safety or the safety of others is being compromised.
3. Functional test. ▪ If the conditions of this Task Risk Assessment change or an unexpected Position:
situation arises, personnel involved in the work scope should suspend
the task and inform their supervisor immediately
Date:
Comments / Adequacy of controls and details of feedback. (Workforce return any comments to the Manager)
Issued by QHSE Manager Document Number BIIS-IA-01 Revision No. 0.4 Page 1 of 3
2 High Noise Hearing Damage Medium/ Low 10 4 4 Hearing protection must be worn
Issued by QHSE Manager Document Number BIIS-IA-01 Revision No. 0.4 Page 2 of 3
People: What could go wrong? Elimination – Does the task have to be done?
Experience / Competence / Training How serious is the effect?
Communication. Are there any serious interactions? Substitution – Can something else be used to
Suitable number to complete task. What will happen IF? reduce the risk?
Behavioural attitude How is it likely to happen?
Is escalation possible or likely? Engineering Controls – Can equipment be used to
Equipment:
Suitability for task / correct specification / certified. For example; reduce the risk?
Potential failure.
Slips Trips and falls. Segregation – Can distance / barriers / guards be
Struck by or against an object. used to prevent personal exposure to hazard?
System and Materials; Size and weight
Hazardous substance (COSHH Electrical Caught by moving machinery.
Uncontrolled movement of load. Reduction – Can we limit amount of personnel /
requirements) Pressurised
Use of high-pressure hoses. Time / exposure to hazard?
Radioactive Temperature / Hot /
Flammable Cold Injury through exposure to:
Noise. Personnel protective equipment – Suitable and
Explosive Containment
Hazardous substances. sufficient PPE to be used.
Rotating machinery.
Radiation
Environment: Noise Electrical systems – electrocution. Procedures – Can procedures be produced to
Confined space. Lighting Asphyxiation. reduce the risk.
Working at height Ventilation Drowning.
Temperature Weather. Hypothermia. Emergency Arrangements – Correct emergency
Shock procedures to be used.
Other:
Stress.
Manual handling Safety Management – Correct use of safety
Moving systems available. Entry procedures, Permit to work
Potential for fire / explosion – potential burns /
Pulling etc.
death.
Lifting
Excessive force required? Planning – Good planning essential
Pollution
Contamination
Financial liability Management – Good Supervision / communication
Loss of production / Instruction.
Issued by QHSE Manager Document Number BIIS-IA-01 Revision No. 0.4 Page 3 of 3