You are on page 1of 3

DESIGN OF FOOTING FOR AXIAL LOAD AND UNIAXIAL BENDING MOMENT

287 T Concrete 30 N/Sqm


Steel 500 N/Sqm
2.2 T-m C 10 N/Sqm
t 230 N/Sqm
Col. Long 0.95 m
Col Short 0.35 m
S.B.C. 75 T/Sqm
Bar Dia 16 mm
800 Load 287 T
800.00 800.00 Moment 2.2 T-m
800 Foot Long 2.85 m
Foot Short 2.15 m
Cover 40 mm
Q= 4.14
1425 1425

Y1 Y2 e = M/P = 0.0076655052 m

Afooting = 6.1275 Sqm


574 752 198
2150 Z= 2.9105625 Cum.
900
Pmax = 47.593892933 T/Sqm o.k.

Y1 Y2 Pmin = 46.082157659 T/Sqm

Py1 = 47.089981175 T/Sqm


46.08216 46.39 47.29
S.F(Y1) = 96.695906433 T

T/Sqm 47.09 47.49 47.59389293 S.Fu.(Y1) = 145.04 T


T/Sqm
M(Y1) = 46.012037037 T

Mu(Y1) = 69.02 T-m


Y1
Y2 deff (required)= 608.74070428 mm

D= 800 mm

deff(provided) = 752 mm o.k.

b= 450 mm

Mu/b*d^2 2.7121551181

Pt = 0.707 %

Ast = 2392.95 Sqmm

Provide 16 T@ 180.65 C/C

Therefore Provide 16 T@ 100 C/C


Ap = 4323 Sqmm (Parallel to longer
o.k. direction)

Reinforcement Parallel to shorter direction

S.F.(X1)= 120.13953 T

S.Fu(x1) = 180.2093 T

M(x1) = 54.062791 T-m

Mu(x1) = 81.094186 T-m

deff = 744 mm

b= 1050 mm

Mu/b*d^2 = 1.3952581

Pt = 0.3401985 %

Ast = 2657.6309 Sqmm

Provide 16 T @ 215.6155 C/C

Provide 16 T @ 100 C/C (Ap = 5730.265 Sqmm)


o.k.
Check For One Way Shear

Angle = 43.451842 degrees


(Refer figure)

b = 1774.8421 mm

S.F.(Y2) = 20.23836548 T
M
Shear Force(U) at Y2 = 30.36 T 100*As/b*d 30 Next Value
0.25 0.35 0.3825094
Moment at Y2 = 3.01 T-m 0.5 0.46 Next Value
0.75 0.54 Next Value
Tv = 0.227 N/Sqmm 1 0.6 Next Value
1.25 0.64 Next Value
100*As/(b*d) = 0.324 1.5 0.68 Next Value
1.75 0.71 Next Value
Tc = 0.383 N/Sqmm 2 0.71 Next Value
2.25 0.71 Next Value
o.k. 2.5 0.71 Next Value
2.75 0.71 Next Value
3 0.71 Next Value

Check For Two Way Shear

S.F.= 199.1504124 T.

Su = 298.7256186 T.

d' = 752.00 mm

b' = 5608 mm

Tv = 0.708 N/Sqmm

Bc = 0.368

Ks = 0.5 + Bc
but not more than 1 0.868

Tc = 1.369

Ks * Tc = 1.189 N/Sqm

o.k.
C=7 M20
C=8.5 M25
C=10 M30
C=13 M40

You might also like