Y1 Y2 e = M/P = 0.0076655052 m
D= 800 mm
b= 450 mm
Mu/b*d^2 2.7121551181
Pt = 0.707 %
S.F.(X1)= 120.13953 T
S.Fu(x1) = 180.2093 T
deff = 744 mm
b= 1050 mm
Mu/b*d^2 = 1.3952581
Pt = 0.3401985 %
b = 1774.8421 mm
S.F.(Y2) = 20.23836548 T
M
Shear Force(U) at Y2 = 30.36 T 100*As/b*d 30 Next Value
0.25 0.35 0.3825094
Moment at Y2 = 3.01 T-m 0.5 0.46 Next Value
0.75 0.54 Next Value
Tv = 0.227 N/Sqmm 1 0.6 Next Value
1.25 0.64 Next Value
100*As/(b*d) = 0.324 1.5 0.68 Next Value
1.75 0.71 Next Value
Tc = 0.383 N/Sqmm 2 0.71 Next Value
2.25 0.71 Next Value
o.k. 2.5 0.71 Next Value
2.75 0.71 Next Value
3 0.71 Next Value
S.F.= 199.1504124 T.
Su = 298.7256186 T.
d' = 752.00 mm
b' = 5608 mm
Tv = 0.708 N/Sqmm
Bc = 0.368
Ks = 0.5 + Bc
but not more than 1 0.868
Tc = 1.369
Ks * Tc = 1.189 N/Sqm
o.k.
C=7 M20
C=8.5 M25
C=10 M30
C=13 M40