You are on page 1of 3

H&S RISK ASSESSMENT

Risk Assessment Ref: HIRA 002


Revision No.: R00
Description: Stacking of Material Storage Date: 25-Jan-24

Risk Rating Final Residual Risk Rating


Responsible
Activity Hazard Impact Hazards Controls
Person
S L RR Category S L RR Category

Untrained Time delays and • Ensure all operatives are CM


Planning. 2 5 10 HIGH 2 1 2 LOW
operatives. rework. trained to perform the job. Site Engineer

• Logistics manager to ensure


that the location for placing
Stacking and Property • Logistic
Material placed on material is approved by the
storage of damage/serious to 2 5 10 HIGH Manager 2 1 2 LOW
uneven ground. Project Manager and that it
material. fatal injuries. • Site Engineer
is accordance with all site
requirements

• Logistic
• Area of offloading to be Manager
Property barricaded, responsible • Site
Load falling onto
damage/serious to 5 5 25 SERIOUS supervisor to ensure that Engineer 5 1 5 LOW
employee.
fatal injuries. only authorized employees • Site
enter the area for work Engineer
Supervisor

• Logistic
Manager
• Designation of stacking
Stacking and Time • Site
and storage areas to be as
storage area not delays/financial 5 5 25 SERIOUS Engineer 5 1 5 LOW
per the approved site
demarcated. lose. • Site
layout plan
Engineer
Supervisor

Form Ref. KAFD-RY-RIA2-PGEN-SAP-QMS-FRM-00013 R01 18 December 2019 Page 1 of 3


H&S RISK ASSESSMENT
Risk Assessment Ref: HIRA 002
Revision No.: R00
Description: Stacking of Material Storage Date: 25-Jan-24

Risk Rating Final Residual Risk Rating


Responsible
Activity Hazard Impact Hazards Controls
Person
S L RR Category S L RR Category
• Logistic
Manager
Designation of stacking and
Obstruction of Time • Site
storage areas to be as per
walkways and delays/financial 5 5 25 SERIOUS Engineer 5 1 5 LOW
the approved site layout
roadways. lose.
plan • Site
Engineer
Supervisor
• Always keep work area
clean and tidy.
• Ensure all balance materials
are cleared from work place.
stacking of Property damage
• Ensure life lines are not
material causing Time delays, Site Engineer
5 5 25 SERIOUS crossing access and exits. 5 1 5 LOW
slip, trip, or falling serious to fatal Supervisor
of employees. injuries. • All materials must be
stacked properly away from
access and edges.
• Ensure adequate
illumination during night.
Prepared by: Signature: Date: 25-Jan-2024 Consultant
Approved
Approved by: Signature: Date: 25-Jan-2024 by: HSE Manager Date

CLASSIFICATION CHART

Form Ref. KAFD-RY-RIA2-PGEN-SAP-QMS-FRM-00013 R01 18 December 2019 Page 2 of 3


Likelihood of Risk

Likelihood Description Rating Category


Unlikely Occurrence close to zero 1
1–4 Attention Required- Low Risk
May Happen Capable of taking Place 2
Likely Tend to or Inclined to Occur 3 5–9 Corrective Measures Required- Medium Risk
Very Likely High Inclination of Occurrence 4 10 – 16 Corrective Action Required- High Risk
Certain Most Definitely Happen- Not “If but When” 5
20 – 25 Elimination of Hazard Required- Serious Risk

Severity of Risk

Severity Description Rating Likelihood


Minor Injury First-Aid On Site 1 1 2 3 4 5
Minor Injury Treatment Off Site 2 1 1 2 3 4 5
Up-to-3 days Injury Limited or no work for three days 3 2 2 4 6 8 10
Major Injury Reportable 4 Severity 3 3 6 9 12 15
Death 5 4 4 8 12 16 20
5 5 10 15 20 25

Form Ref. KAFD-RY-RIA2-PGEN-SAP-QMS-FRM-00013 R01 18 December 2019 Page 3 of 3