Professional Documents
Culture Documents
Manual Hankscraft Runxin Revv20 Valves and Systems
Manual Hankscraft Runxin Revv20 Valves and Systems
Instruction Manual
Please read this manual in detail before using the valve and keep it in a safe place for future reference.
Hankscraft Runxin RevV20 Valve Manual
Before the valve is put into use, please fill in the below content.
1 inch 25.4 mm
1 ft3 (of resin) 28.32 L
1 kg 2.2 lbs.
1 gal 3.79 L
1 m3/h (per hour) 4.4 gal/m (per minute)
1 gpg 17.1 mg/L or (ppm)
Parameter Settings
● If there are no special requirement(s) when the product is purchased, the #3 drain line flow control and #3
injector (yellow), is used for standard configuration.
Hankscraft Runxin RevV20 Valve Manual
Notice ...................................................................................................
1. Product Overview ........................................................................... 2
1.1. Main Application & Applicability.................................................... 2
1.2. Product Characteristics ............................................................... 3
1.3. Service Condition ........................................................................ 5
1.4. Product Structure and Technical Parameters ............................... 6
1.5. Installation ................................................................................... 7
2. Basic Setting & Usage .................................................................. 10
2.1. The Function of PC Board ......................................................... 10
2.2. Basic Setting & Usage ............................................................... 11
3. Applications .................................................................................. 14
3.1. Flow Chart ................................................................................. 14
3.2. The Function and Connection of PC Board................................ 15
A. Signal Output Connector .............................................................. 16
B. Interlock ....................................................................................... 18
C. Pressure Relief Output ................................................................. 19
D. Remote Handling Connector ........................................................ 19
E. Interlock System .......................................................................... 19
F. Series System .............................................................................. 20
3.3. System Configuration and Flow Rate Curve .............................. 20
3.4. Parameter settlement ................................................................ 21
3.5. Parameter Enquiry and Setting .................................................. 23
3.6. Trial Running ............................................................................. 26
3.7. Trouble-shooting ........................................................................ 28
3.8. Assembly & Parts ...................................................................... 31
I
Hankscraft Runxin RevV20 Valve Manual
Preface
Thank you for choosing this Hankscraft Runxin water softening system for your water
treatment needs. Please read this manual carefully before attempting to use the system for the
first time, and ALWAYS adhere to all safety and operating instructions. Doing so will protect your
warranty and help keep your system running and operating safely and effectively.
***Before installing, read through this manual thoroughly. Failure to use this product
within the described conditions may void the warranty***
All plumbing and electrical work should be performed by an accredited professional to ensure all
local, municipal, state, and federal guidelines are met.
Do not use the control valve with water that is unsafe or of unknown quality. This system does not
sanitize or disinfect.
Do not use the brine tube, injector body, or other connectors on the RevV valve as a handle to carry
the system.
Ensure there is salt in the brine tank at all times when this valve is used for softening. The brine tank
should contain clean water and pellet softening salt only, at least 99.5% pure. The use of small grain
or solar salt is not recommended.
When there is moderate to high turbidity, a filter should be installed before the water softening
system on the inlet side.
If the water pressure exceeds 120psi, a pressure reducing valve must be installed before the water
inlet. If the water pressure exceeds 80 psi, installing a pressure reducing valve before the water inlet
is highly recommended. If the water pressure is under 21psi, a booster pump must be installed
before the water inlet.
Replacement parts for the RevV valve should only be purchased through Hankscraft
resellers. Electrical components such as transformers are specific to the RevV valve from
Hankscraft.
Regular interval monitoring of the water quality and work environment is recommended to insure
proper operation of the valve and system.
1. Product Overview
2
Hankscraft Runxin RevV20 Valve Manual
Overview
The advanced design incorporates a microcomputer control that analyzes real-world operating
conditions and performs regeneration automatically. This unique control valve features highly
polished, patented ceramic discs. The design incorporates one fixed and one moving disc,
which rotates through positions to align channels creating five different fluid pathways. These
five pathways, or stages, are: Service, Backwash, Brine & Slow Rinse, Brine Refill, and Fast
Rinse.
Manual Function
Regeneration can be prompted by pressing at any time.
Buttons Lock
If the display board is not in use for more than 1 minute the buttons will lock. A light indicating
this will appear. Before operating again press and hold the “ ” and “ ” buttons for 5 seconds
to unlock. This function can deter unintended operation.
Interlock Function
The interlock function is designed to have only one valve in regeneration, at a time, while
multiple other valves are in service in a parallel valve system. In multi-step treatment systems
such as RO pre-treatment, when several valves are in series, there is only one valve in
regeneration or washing to ensure product water at all times.(Application refer to Figure 3-9)
3
Hankscraft Runxin RevV20 Valve Manual
Signal Output
There is a signal output connector on the main control board. This connector is designed to
control external devices (Refer to Figure from Figure3-1 to Figure 3-8).
b-01 and b-02 output modes: b-01: a signal that is sent through the entire duration of
cycles during regeneration. In this mode, the signal can be sent once per cycle; b-02 Mode: the
signal is sent at the end of one cycle and at the beginning of another. In this mode, the signal is
sent five times per one complete cycle.
4
Hankscraft Runxin RevV20 Valve Manual
In the above table, First Grade Na+ represents First Grade Na+ Exchanger. Second Grade Na+
represents Second Grade Na+ Exchanger.
When the water turbidity exceeds the conditions, a filter should be installed on the inlet of
control valve.
When the water hardness exceeds the conditions, the outlet water hardness will hardly reach
the requirement of boiler feed water (0.03 mmol/L or 0.18 gpg). It is suggested to adopt a
second grade softener.
5
Hankscraft Runxin RevV20 Valve Manual
A. Product Dimension (The below images are used for reference and are subject to the real
product).
248.5
Riser Pipe
·I/2' D-GB
(SOmm)
9 06.5
BOITOM
02
_ TOP
02
L~...f=:!~-~-, <f'Ba...,
_ gUN \ Flow Met«
Rire.-Pipe
1-t n. ' D-GB OOmm)
( v1cw without stdc ~<~neetor)
6
Hankscraft Runxin RevV20 Valve Manual
B. Technical Parameter
1.5. Installation
A. Installation notice
Before installation, read all instructions completely. Then obtain all materials and tools
needed for installation.
The installation of the softening system, pipes, and circuits should be completed by a
certified water professional to ensure the product will function and operate correctly.
Perform installation according to the regional pipeline regulations and the specification of
Water Inlet, Water Outlet, Drain Outlet, and Brine Line Connector.
7
Hankscraft Runxin RevV20 Valve Manual
B. Device Location
a. As the Figure 1-1 shows, select a riser pipe that is 50mm OD, glue the riser pipe to the
bottom strainer and put it into the mineral tank, cut the excessive tube off that is coming out the
top opening of the pressure tank. Plug the riser tube to prevent unwanted minerals.
b. Fill the mineral tank with resin, height according to the design code.
c. Attach the top distributor basket to the valve.
d. Insert and fasten the riser tube into the control valve.
Note:
●The length of riser tube should not be higher than 2mm nor lower than 5mm from the tank’s
top opening height, and its top end should be rounded to avoid damage of the O-ring inside the
valve.
●Avoid dropping the O-ring from inside the control valve while rotating it on the tank.
As below figure shows, put the sealing ring into the nut of the flow meter, and attach it to the
water outlet; insert sensor (probe wire) into the flow meter.
8
Hankscraft Runxin RevV20 Valve Manual
③ Pipeline Connection
Note:
● If making a soldered copper installation, do all sweat soldering before connecting pipes to the
valve. Torch heat will damage plastic parts.
●When turning threaded pipe fittings onto plastic fitting, be sure not to cross thread.
●If the valve is a time clock type, skip step ②.
Note:
● Control valve should be higher than the drain outlet, and
should be separated from the drain hose by at least 2 inches.
● Be sure not to connect the drain line directly to the sewer to
avoid wastewater contamination.
a. As Figure1-5 shows, use 3/4” brine tube hose connector over the end of the brine tube.
b. Insert the tube bushing into the end of the brine tube.
c. Tighten the brine draw hose connector to the brine line connector.
d. Connect the other end of the brine line hose to the brine tank.
Note: Keep brine line short and smooth. Line should not be bent or plugged.
9
Hankscraft Runxin RevV20 Valve Manual
Light on, indicates the buttons are locked. At this time, pressing any single button will not work
(If the display is not used for 1 minute, will light and lock the buttons).
Solution:to unlock press and hold both and for 5 seconds until the light turns off.
D. Menu/Confirm button
Press , light turns on, enter program display mode and use or to view all values.
In program display mode, press , will flash, enter program set mode, press or
10
Hankscraft Runxin RevV20 Valve Manual
E. Manual/Return button
Press in any status, it will proceed to next cycle. (Example: Press In Service status, it
will start regeneration cycles instantly; Press while it is in Backwash status, it will end
backwash and go to Brine & Slow Rinse).
Press in program display mode, and it will return to in Service;
Press in program set mode, and it will return program display mode.
Press while adjusting the value, it will return to the program display mode directly without
saving value(s).
F. Down ▼ and Up ▲
In program display mode, press ▲or ▼ to view all values.
In program set mode, press ▲ or ▼ to adjust values.
A. Parameter Specification
Factory Parameter
Function Indicator Instruction
Default set range
00:00~
Time of Day Set the time of day when “:” is flashing.
23:59
Regeneration happens when the capacity reaches
A-01
zero and the preset time of regeneration is reached.
11
Hankscraft Runxin RevV20 Valve Manual
Resin Volume 20L. 20L. 5-500L. Resin volume in brine tank (L).
Feed Water
Yd1.2 1.2 0.1-9.9 Feed water hardness (mmol/L).
Hardness
Exchange Related to the raw water hardness. When hardness
AL.65 0.65 0.30-0.99
Factor is higher, the factor is smaller.
Water
0~999.99 Water treatment capacity per cycle (m3).
Treatment 10 m3
m3
Capacity
Backwash Backwash time (Minute).
10 min. 0~99
Time
Brine & Slow Brine & Slow rinse time (Minute).
60 min. 0~99
Rinse Time
Brine Refill Brine refill time (Minute).
5 min. 0~99
Time
Fast Rinse Fast rinse time (Minute).
10 min. 0~99
Time
Maximum
Interval Regenerate on this day even though the available
H-30 30 0~40
Regeneration volume of treated water did not reach to zero (0).
Days
Mode b-01: Signal is sent at the start of
regeneration and shuts off at the end of
Output regeneration. (Connection refer to the Figure on P3)
b-01 b-01 b-01 or b-02
Control Mode Mode b-02: Signal is available only during intervals
of the regeneration cycles and in service
(Connection refer to the Figure on P3).
12
Hankscraft Runxin RevV20 Valve Manual
B. Process Display
Illustration
In Service status, shown in figure A/B/C/D; In Backwash status, shown in figure E/C; In Brine &
Slow Rinse status, shown in F/C; In Brine Refill status, shown in figure G/C; In Fast Rinse
status, shown in figure H/C. In each status, every figure is shown for 15 seconds.
Above displays are using the Meter Type as an example. For the Time Clock Type, it shows the
rest days or hours, such as 1-03D or 1-10H.
The display screen will only show “-00-” when the electrical motor is running.
The time of day figure “” flashes continuously, such as “12:12” flashing, indicates a long
outage of power. This is a reminder to reset the time of day.
The display will show the error code, “-E1-” when the system is in error.
C. Working Process: Service→ Backwash→ Brine & Slow Rinse→ Brine Refill→ Fast
Rinse→ Service.
D. Usage
After installation is completed, parameters are set, and a trial run is completed, the valve is
ready to be put into use. In order to ensure the quality of outlet water, the user should complete
the steps below:
① Ensure that there is solid salt at all times in the brine tank when the valve is used for
softening. The brine tank should use softening salts only, 99.5% pure.
② Test the product water and raw water hardness on a regular basis. When the outlet
water hardness is at an undesired level, press the button; the valve will temporary
regenerate (It will not affect the original set operation cycle.)
③ When the feed water hardness changes, you can adjust the water treatment capacity as
follows:
Press and hold both and for 5 seconds to lift the lock status. Press , and the
light turns on, then press , the display shows the control mode. If it shows A-01 or A-02, press
two times, and the display will show the given water treatment capacity (If the control mode
shows A-03 or A-04, then press three times, the display will show the feed water hardness);
Press again, on display will flash. Press or to change the capacity value (Or water
hardness). Press a confirmation beep will sound finishing the adjustment. Press to exit
and return to service status.
To calculate the water treatment capacity, refer to the manufacturer’s specifications.
Selecting A-03 or A-04 intelligent control mode, the control will automatically calculate the water
treatment capacity by setting resin volume, feed water hardness, and regeneration factors.
13
Hankscraft Runxin RevV20 Valve Manual
④ For A-01 or A-03 control mode (Delayed regeneration type), ensure the time is set
correctly. If the time is not correct, you can adjust as follow: After lifting the lock status, press ,
the buttons and light will turn on. Then press , the buttons and hour value will
flash. Press or to change the hour value; Press again, and minute value will
flash. Press or to change the minute value; Press a confirmation beep will sound
finishing the adjustment. Press to exit and return to service status.
The regeneration parameters have been set when the control valve left the factory to
default settings or set up on initial installation. Generally, there is no need for it to be reset.
3. Applications
14
Hankscraft Runxin RevV20 Valve Manual
Open the front cover of the control valve, you will see the main control board and
connection port as seen below:
Functions on PC board:
Function Application Explanation
Outlet If the system requires no hard water to flow from
solenoid valve outlet or if controlling the liquid level in water tank.
Signal output
connector b-01 Increase pressure for regeneration or washing.
Inlet pump Use the liquid level controller to control inlet pump,
ensuring there is water in tank.
Signal output Inlet solenoid valve or inlet Used when inlet pressure is high, closes water inlet
connector b-02 pump when valve is rotating to protect motor.
Pressure relief Control the inlet bypass to When valve is rotating, pressure relief connector
connector release pressure opens to prevent pressure from increasing rapidly.
To ensure only one control Used in RO Pre-treatment, water is supplied
Interlock
valve is in regeneration at a simultaneously but regenerate in turn. Also, used in
connector
time in a system. second grade ion exchange equipment, etc.
Remote It is used for on-line inspection systems, PC
Signal triggers the control to
handling connections, and automatic or remote controlling
rotate to the next cycle.
connector valve.
15
Hankscraft Runxin RevV20 Valve Manual
① Solenoid valve on the outlet controls the water level in brine tank.
Instruction: If the system requires there to be no hard water flow from the outlet in regeneration
cycle (Mainly for no hard water flow out when valve is switching or valve is in backwash or brine
drawing positions), a solenoid valve could be installed on outlet, for wiring refer to Figure 3-1.
Function:
When valve is in service status, if soft water tank is short of water, solenoid valve is open to
supply soft water, but if water tank has enough water, solenoid valve is closed, and no soft water
is supplied.
When the valve is in backwash status, there is no signal output. Therefore, the solenoid valve
is closed, and no water flows into soft water tank.
Instruction: When inlet pressure exceeds (0.6MPa~87psi), install a solenoid valve on inlet.
Control mode is b-02. Pressure is relieved when valve is switching to prevent damage, for wiring
refer to Figure 3-2. As Figure 3-3 shows, it can also use the pressure relief port to work.
Instruction:
When inlet pressure is high, install a solenoid valve on inlet to ensure the valve can switch
properly. When valve is in position for Service, Backwash, Brine & Slow Rinse, Brine Refill and
Fast Rinse, solenoid valve is open. When valve is switching between cycles, the solenoid valve
16
Hankscraft Runxin RevV20 Valve Manual
is closed, ensuring no water can flow to the valve protecting it from damage during transition.
This can prevent water bleed through or water hammering.
Use interlock cables to daisy chain valves in parallel, or series, in the same system which is
suited for RO pretreatment system or second grade Na+ system. For wiring refer to Figure 3-4:
2) Liquid Level Controller Controls Inlet Pump (Two-phase motor) ( Set b-01)
Instruction: For a system using well or middle-tank supplying water, liquid level controller and
valve, together, control pump opening or closing. For wiring refer to Figure 3-5:
Function:
When the valve is in service, if the water tank is short of water, it starts the pump, but if the
tank has enough water, the switch of liquid level controller is closed, so the pump will not be in
operation.
When valve is in regeneration, inlet always has water no matter the condition(s) in the water
tank. Valve does not pass water through the outlet in regeneration cycle, ensuring no water
drains into the brine tank.
3) Liquid Level Switch in Water Tank Controls Inlet pump (Three-phase) (Set b-01)
17
Hankscraft Runxin RevV20 Valve Manual
Instruction:
If inlet water pressure is less than (0.2MPa~29psi), which makes drawing difficult, a
booster pump is suggested to be installed on the inlet. Control mode b-01. When the system is
in regeneration, booster pump is open, for wiring refer to Figure 3-7. If the booster pump current
is higher than 5A, system needs to have a contactor installed. For wiring refer to Figure 3-8
below.
B. Interlock
Instruction:
In a parallel water treatment system, to ensure only one valve in regeneration or washing
cycle and (n-1) valves in service, that is, that the function of supplying water simultaneously and
regenerating individually, for wiring refer to Figure 3-9.
Note: Use Interlock Cable to connect CN8 to CN7 on next valve in the loop.
In a system with several valves, if the interlock cable is disconnected, the system will be
divided into two individual systems.
18
Hankscraft Runxin RevV20 Valve Manual
Valve will cut off feed water to the drain line when there is a switch in regeneration cycles.
In some water treatment system, e.g. Deep Well, one booster pump was installed on the inlet to
increase the system water feed pressure. This cut-off will prevent pressure on the inlet from
rising too fast, protecting the valve. Pressure Relief Output can be used to avoid this problem.
For wiring refer to Figure 3-10.
Online TDS meter can monitor treated water rather than a flow meter, or PLC controlling
the regeneration time. When the controller receives a contact closure from above instruments,
regeneration begins. For wiring refers to Figure 3-11:
E. Interlock System
For 2 or more valves that are interlocked, connected in one system, and when all valves are in
service but regenerate individually. For wiring refer to Figure 3-12.
19
Hankscraft Runxin RevV20 Valve Manual
F. Series System
This is a 2 or more valve system, all in service, with one flow meter for the entire system. For
the time type valve, the regeneration time should be set and adjusted to the Max; for the volume
type valve, connect its signal output connector with the remote handle connector of the time-
type valve. This provides the function of supplying water simultaneously and regenerating in
order. For wiring refer to Figure 3-13:
A. Product Configuration
Softener valve for floating bed configuration with tank, resin volume, brine tank and injector
model.
20
Hankscraft Runxin RevV20 Valve Manual
① Service Time T1
Water treatment capacity:
Q=VR×K÷YD (m3)
Hardness of inlet water (mmol/L)
21
Hankscraft Runxin RevV20 Valve Manual
② Backwash Time T2
It is subject to the turbidity of inlet water. Generally, It is suggested to be set to 10~15
minutes. The higher the turbidity is, the longer backwash time can be set. However, if the
turbidity is more than 5 FTU, it would be better to install a filter before the exchanger.
⑥ Exchange Factor
Exchange factor =E / (k×1000)
In this formula, E——Resin working exchange capability (mmol/m3), it is related to the
quality of resin. Down-flow regeneration, take 800~900. Up-flow regeneration, take 900~1200.
K——Security factor, always take 1.2~2. It is related to the hardness of inlet water: the higher
the hardness is, the bigger the K is.
⑦ Regeneration Time
The whole cycle for regeneration is about two hours. Please try to set up the regeneration time
when you don’t need water according to the actual situation.
The calculation of parameters for each step is only for reference, the actual time will be
determined/adjusted by the water softener supplier. This calculation procedure of softener is
only for industrial application; it is not suitable for small softeners in residential applications.
22
Hankscraft Runxin RevV20 Valve Manual
23
Hankscraft Runxin RevV20 Valve Manual
24
Hankscraft Runxin RevV20 Valve Manual
① Press and hold both and to lift the button lock status ( light off);
25
Hankscraft Runxin RevV20 Valve Manual
③ Press or continuously until lights up. Then the digital area shows: 4-12M;
⑥ Press , there will be a confirmation beep and the figure will stop flashing; the program will
return to the adjustment status.
⑦ If you want to adjust other parameters, you can repeat the steps from ② to ⑤; if you
don’t, press and quit from the inquiry status, the display will show the current service status.
After installing the control valve on the resin tank with the connected pipes, and setting up
the relevant parameters for the system, please conduct a trail run as follows:
A. Close the inlet valve B & C, and open the bypass valve A. After cleaning the foreign
materials in the pipe, close the bypass valve A. (as Figure 1-4 shows)
B. Fill the brine tank with the planned amount of water and adjust the air check valve. Then
add solid salt to the tank dissolving the salt as much as possible.
C. Turn on power. Press and go in the Backwash position; when light is on (For
floating bed, switch valve to Fast Rinse), slowly open the inlet valve B to 1/4 position, making
the water flow into the resin tank; you should hear the sound of air-out from the drain pipeline.
After all of the air is out of the pipeline, open inlet valve B completely to clean the foreign
material out of the resin tank until the outlet water is clean. It will take 8~10 minutes to finish the
whole process depending on media.
D. Press , advancing the position from Backwash to Brine & Slow Rinse; when light is
on it indicates the valve is entering Brine & Slow Rinse. The air check valve closes when control
valve finishes drawing brine; slow rinse starts. About 60~65 minute process.
E. Press to get to Fast rinse position. Light turns on. It takes about 10~15 minutes.
Remove some outlet water for testing: if the water hardness reaches the desired requirement,
and the chlorides in the water are almost the same level compared with the inlet water, then
proceed to the next step.
F. Press to Brine refill position. When the light is on it indicates the brine tank is
26
Hankscraft Runxin RevV20 Valve Manual
being refilled with water to the required level. It takes about 5~6 minutes, then add solid salt to
the brine tank.
G. Press , this forces the control valve to advance to “In Service” status; light turns on
and valve will start running.
Note:
When the control valve enters into the regeneration status, all programs will be finished
automatically according to the setting time; if you want one of the steps to terminate early, press
.
If the water inflow is too fast, the media in tank will be damaged. When water inflow is too
slow, there is a sound of air emptying from the drain pipeline.
After changing resin, empty air that is in the resin according to the above Step C.
In the process of trial running, ensure there are no leakages in any cycle.
The time for Backwash, Brine & Slow Rinse, Brine Refill and Fast Rinse position can be set
and carried out according to the calculation in the formula or suggestions from the control valve
suppliers.
27
Hankscraft Runxin RevV20 Valve Manual
3.7. Trouble-Shooting
28
Hankscraft Runxin RevV20 Valve Manual
29
Hankscraft Runxin RevV20 Valve Manual
B. Controller Fault
Problem Cause Correction
A. Wiring of front panel failure. A. Check and replace the wiring.
1. All indicators
B. Control board is faulty. B. Replace control board.
displayed on front
C. Transformer damaged. C. Check and replace transformer.
panel.
D. Electrical service not stable. D. Check and adjust electrical service.
A. Wiring of front panel failure. A. Check and replace wiring.
2. No display on B. Front panel damaged. B. Replace front panel.
front panel. C. Control board damaged. C. Replace control board.
D. Electricity is interrupted. D. Check electricity.
A. Wiring of locating board failure. A. Replace wiring.
B. Locating board damaged. B. Replace locating board.
C. Mechanical driven failure. C. Check and repair mechanical part.
3. E1 Flash
D. Faulty control board. D. Replace control board.
E. Wiring of motor failure. E. Replace wiring.
F. Motor 1 damaged. F. Replace motor 1.
A. Wiring of locating board failure. A. Replace wiring.
B. Locating board damaged. B. Replace locating board.
C. Mechanical driven failure. C. Check and repair mechanical part.
4. E2 Flash
D. Faulty control board. D. Replace control board.
E. Wiring of motor failure. E. Replace wiring.
F. Motor 2 damaged. F. Replace motor 2.
6. E3 or E4 Flashes A. Control board is faulty. A. Replace control board.
30
Hankscraft Runxin RevV20 Valve Manual
31
Hankscraft Runxin RevV20 Valve Manual
RevV 20-A: Valve Body Components (set up as filter: remove item no. 46 and no.47)
Item Item
Description Part No. Quantity Description Part No. Quantity
No. No.
32
Hankscraft Runxin RevV20 Valve Manual
33
Hankscraft Runxin RevV20 Valve Manual
34
Hankscraft Runxin RevV20 Valve Manual
RevV 20-B: Valve Body Components (set up as filter: remove item no. 38 and no.52)
Item Item
Description Part No. Quantity Description Part No. Quantity
No. No.
Wire for Locating
1 Side Connector 5458002 1 28 5511002 1
Board
Screw, Cross
2 8909003 8 29 Dust Cover 8005023 1
ST3.9X16
Three Core Spring
3 Connector 8458018 1 30 5517001 1
Line
4 O-ring 104.6X5.7 8378146 1 31 Bushings 8126006 1
5 O-ring 48.9x2.62 8378071 1 32 Wire Clip 8126001 1
Drain Line Flow
6 8468010 1 33 Front Box 8300025 1
Control
7 Cover, Injector 8315006 1 34 Label 8865023 1
8 O-ring 8371004 1 35 Display Board 6381003 1
9 Injector 5468013 1 36 Cover 8315016 1
10 Tube 8457025 1 37 Buckle 8126004 2
11 Hexagonal Nut 8940016 1 38 Probe Wire 6386002 1
12 Seal Ring 8370016 1 39 Wire for Power 5513001 1
13 Fix Disk 8469010 1 40 Pin 8994009 1
14 Moving Disk 8459011 1 41 Small Gear 8241008 1
15 Moving Seal Ring 8370018 1 42 BoltC4X12 8971001 1
16 Shaft 8258005 1 43 Motor 6158036 1
17 Anti-friction Washer 8216006 1 44 Hexagonal Nut 8940002 3
18 O-ring 59.92x3.53 8378110 2 45 Buckle 8126002 1
19 O-ring 117.6X3.55 8378133 1 46 Screw, Cross M4X20 8902007 1
20 Fitting Nut 8092005 1 47 Connecting Board 8152007 1
Screw, Cross
21 Locating Board 6380015 1 48 8909016 4
ST3.9X16
Screw, Cross
22 8909004 6 49 Screw, Cross M4×12 8902005 1
ST2.2X6.5
Screw, Cross
23 Gear 5241004 1 50 8902012 4
M4X36.5
Screw, Cross Valve Body
24 8909018 1 8022052
ST4.8X19 (ABS+GF10)
51 1
Valve Body
25 Fixed Base 8109004 1 8022053
(PPO+GF10)
26 Control Board 6382027 1 52 Flow Meter 5447003 1
Screw, Cross
27 8909008 15
ST2.9X9.5
35