Lot-for-lot ordering
Week No Beg. Inv 1 2 3 4 5 6 7 8
Quantity 100
Gross Requirements
Scheduled receipts
Item N, Project on hand
LT =
2weeks Net requirements
Planned-order receipts
Planned-order releases
2. Lot-size ordering
Gross Requirements
Shutters:
LT = 1 Scheduled receipts
week (LT Project on hand
= Lead Net requirements
time) Lot Planned-order receipts 100
size
Planned-order releases 100
Gross Requirements
Frames:
LT = 2 Scheduled receipts
weeks; Lot Project on hand
size = Net requirements
multiples Planned-order receipts 320
of 320
Planned-order releases
Gross Requirements
Wood Scheduled receipts
sections: Project on hand
LT = 1 Net requirements
week Planned-order receipts
Planned-order releases