CLEVER CONSULTS & CONSTRUCTION CO.

LTD
C/O P.O Box 31744 Kampala (U), Located at Ayubu Plaza, Ntinda,
Tel: +256-785763597 /707211209/753894098 Email cleverconsults@gmail.com

Kampala
BILL OF MATERIALS AND LABOUR FOR MR TUGUME BONIFACE KANGAMBIRWE AS OF

30TH SEPT. 2023

(FOUNDATION BITUMEN APPLICATION WORKS)

No Description Qty Unit Rate Amount


(UGX) (UGX)

1 Water Damp proofing Works in Foundation

A Poly Coat Bitumen For Water Proofing Bitumen Grade 80/100 1 Drum 750,000 750,000

B Thinner 4 Jerry can 5Ltr 65,000 260,000

C Bitumen Compressor machine for Mixing ,Preparation and 3 Per Day 120,000 360,000
Spraying Machine Hiring

D Fuel 2 Per Day 55,000 110,000

E Transport (Both Machine and workers) 1 Sum 280,000 280,000

F Bitumen Application Labor(2 Workers) 3 Days 3 Sum 250,000 500,000

G Architect or Engineer Supervision and Transport 1 Sum 250,000 250,000

Total 2,510,000

Note: The Bitumen is to be applied before the slab works commence and it will be applied thoroughly on the whole
foundation plinth wall. Also the foundation trenches must not be covered with soil until application is done, Anti
termite should also be applied later on.

Prepared by Architect Henry Darlin Kiige@ 30th September 2023

Experts in: General Construction, Architectural and Structural Designs, Civil engineering, Interior
Design, Project Management, Water Works and General Supplies