You are on page 1of 1

TCS PROJECT, PALLIPURAM

Earth Rammer
Contractor: Doc. No : CHK/BSL/10

Operator Name: Date:

S No. Description Yes No Remarks

1 Fuel tank is full ( Petrol or Diesel )

2 Engine oil is at correct level

3 No oil leakage

4 Fuel line are not damaged & leaked

5 Ramming show condition and retaining bolts

6 Handle for condition and security is OK

7 Stop controls are available for safe operation

8 Starting system and condition of pull cord are OK

9 Double Earthing Provided is OK.

10 Adequate Guards for all rotating parts.

12 All required PPE is in use

Remarks

BSL TCE TCS


Representative Representative Representative
Signature:

Name:

Date:

You might also like