Professional Documents
Culture Documents
PROJECT
HPOIL GAS PRIVATE LIMITED (HOGPL)
City Gas Distribution Project
Ambala - Kurukshetra Districts, Haryana
HSE RM Solutions
ON BEHALF OF: VCS QUALITY SERVICES PVT. LTD.
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Released By
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
INDEX
1. FORWARD 04
2. ACKNOWLEDGEMENT 05
5. INTRODUCTION TO SITE 09
6. DESIGN CRITERIA 11
9. REFERENCES 24
15. CONCLUSION 83
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
FORWORD
It is to be noted that this consulting service offered for HazOp (Hazard & Operability) - Desktop Process Safety Review
(DPSR) is carried out based on the information, details, data etc. as provided by the VCS Quality Services Pvt. Ltd.
(VCSQSPL) management and as observed by Risk Assessor during their document review & verifications.
We have exercised all reasonable skills, care and diligence in conducting the HazOp – DPSR. However, this report
should not be treated as undertaking warranty or certificate. The consulting service of this collective data is being carried-
out for the first time. During the study/review, we have observed and assessed some gaps which are collectively
mentioned in recommendations, corrective measures are also suggested in this report for compliance & Best practices.
Disclaimer: The consulting service conducted by HSE-RM Solutions (The “Company”) were performed using generally
accepted guidelines, standards, and/or practices, which the Company considers reliable. Although the Company
performed its consulting services pursuant to reliable and generally accepted practices in the industry, the Company
does not guarantee or provide any representations or warranties with respect to VCS Quality Services Pvt. Ltd. Or
consulting services provided by the Company. Moreover, the findings, conclusions, and the suggestions resulting from
the consulting service are based upon certain assumptions, information, documents, and procedures provided by the
Client. AS SUCH, IN NO EVENT AND UNDER NO CIRCUMSTANCE SHALL THE COMPANY BE LIABLE FOR
WITHOUT LIMITATION, ANY LOST REVENUE OR PROFITS OF THE CLIENT OR ITS CLIENT, AGENTS, AND
DISTRIBUTORS, RESULTING FROM, ARISING OUT OF OR IN CONNECTION WITH, THE SERVICES PROVIDED
BY THE COMPANY. The Client agrees that the Company shall have no liability for damages, which may result from
Client use, interpretation or application of the consulting services provided by the Company. Client logo has been used
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
ACKNOWLEDGEMENT
We, M/s. HSE RM Solutions, Ahmedabad, Gujarat sincerely thank VCS Quality Services Pvt. Ltd., Noida for appointing
us to conduct HAZOP - Desktop Process Safety Review (DPSR) Qualitative Risk Assessment of the HPOIL Gas Private
Limited (HOGPL) – City Gas Distribution Project of Ambala – Kurukshetra Districts, Haryana.
We express our sincere thanks to management & employees of “VCS Quality Services Pvt. Ltd., Noida, their courtesy,
co-operation & unstinted support extended to our team, to conduct DPSR for client job no. PI / HPCL / 033 / 18 – 19,
To conduct HAZOP - Desktop Process Safety Review (DPSR) Qualitative Risk Assessment, the Advisory team of M/s.
The team was assisted & guided by M/s. VCS Quality Services Pvt. Ltd., Noida.
Reference Documents for HAZOP - Desktop Process Safety Review (DPSR) Qualitative Risk Assessment Comprises
• Process Design Basic for HPOIL Gas Private Limited (HOGPL) – City Gas Distribution Project of Ambala –
• P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
• P & ID for Ambala CGD Facilities at Kirti Azad Chowk: Drawing No. 1007 -AMB – PC – PID - 1004, Rev.D3.
• P & ID for Ambala CGD Facilities at Devi Oil Pump: Drawing No. 1007 -AMB – PC – PID - 1005, Rev.D3.
• P & ID for Ambala CGD Facilities up to Chainage 20.37 KM : Drawing No. 1007 -AMB – PC – PID - 1006, Rev.D3.
• P & ID for Ambala CGD Facilities up to Chainage 14.42 KM: Drawing No. 1007 -AMB – PC – PID - 1007, Rev.D3.
• Block Flow Diagram – Station cum Mother Station at Jalbera – Ambala: Drawing No. 1007 -AMB – PC – PID –
1008
• It was informed by the Client that P & ID for Kurukshetra District City Gate Station cum Mother Station and
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
PREFACE
INTRODUCTION OF HAZOP - DESKTOP PROCESS SAFETY REVIEW (DPSR)
The objective of a DPSR is to assess the hazard potential of mal-operation or malfunction of individual items of equipment
and the consequent effects on the facility as a whole. This is done via the application of a systematic critical examination
of the design intents of the equipment, in order to identify potentially hazardous deviations from the design intents.
The DPSR technique is a systematic, line-by-line review of the latest Piping & Instrumentation Diagram (P &ID) with
respect to all technical safety and operability aspects (including equipment fire protection), until every piece of equipment
within the scope of the study has been reviewed. This is to ensure that the operating system will handle all foreseeable
operating conditions, including maintenance, start-up and shut down (both normal and emergency), in a safe, healthy
and reliable manner, with minimum environmental impact. To facilitate progress, reviewed systems will be marked in an
easily identified color on the P & ID studied by the team leader.
Identification of deviations from design practices, guidelines and recommendations on technical HSE, fire safety
Evaluation of the impact of the consequences on the technical and fire safety and operability) of the plant and
its interconnected facilities and on the environment.
HAZOP
The aim of the Hazard & Operatability Study (HAZOP study) is to identify potential hazardous events and significant
operability problems associated with the proposed operations. This aim is inherent for all HAZOP
studies.
A HAZOP study is a hazard study which concentrates on how the design will cope with abnormal
conditions, rather than on how it will perform under normal conditions. The study is comprised of
a review of each unit operation, examining each for possible causes of a wide range of process
abnormalities and their consequences.
HAZOP provides the opportunity for people to think creatively and examine ways in which
hazards or operating problems might arise. To reduce the chance of missing something, a
HAZOP is carried out in a systematic manner, using guide words to consider each pipeline and
each type of hazard in turn. The study is carried out by a team so that input from all areas of functional expertise can be
provided.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
The results of a HAZOP depend heavily upon the
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
ABBREVIATION
HOGPL HPOIL Gas Private Limited (HPOIL - M/s Hindustan Petroleum Ltd. and Oil India Ltd.)
MS Mother Station
D/s Downstream
U/s Upstream
NG Natural Gas
Max Maximum
UG Under Ground
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
INTRODUCTION TO SITE
M/s HPOIL, a joint venture of M/s Hindustan Petroleum Ltd. and Oil India Ltd, has been awarded by M/s PNGRB to set
up CGD facilities in Two Geographical Areas, Ambala & Kurukshetra at Haryana and Kohlapur in Maharashtra.
M/s HPOIL has sourced the natural gas from existing pipelines of M/s GAIL separately at Ambala and Kurukshetra, and
another at Kohlapur.
Accordingly, One CGS will be set up at Adhoya Village, receiving Gas from M/s GAIL’s Haridwar Long distance
pipeline at SV-6 for CGD system at Kurukshetra GA.
Similarly, another CGS will be set up at Jalbera Village, receiving gas from M/s GAIL’s same pipeline from SV-7
for CGS distribution of Ambala GA.
Another CGS will be set up at Mauje Vadgaon Village, receiving gas from M/s GAIL pipeline’s IP2 for CGS distribution
of Kohlapur GA.
VCS Quality Services has been appointed as Engineering Consultant by M/s HPOIL to provide Engineering consultancy
services for setting up “City Gas Distribution Facilities at Ambala – Kurukshetra GA at Haryana and Kohlapur GA
at Maharashtra”.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Subsequent to steel pipelines automobile sectors demand are met through CNG Cascades where steel pipelines
are not viable. The demand is met through Cascade and Booster Compressor at Daughter Booster Station (DB)
and from Cascades at Daughter Station. However, gas supply to CNG Cascades is met from on-line Compressor
Stations cum mother stations.
4. From DRS Low pressure (4-6 Kg/cm2.g) MDPE pipelines will be laid to supply to Domestic, Commercial and small
industrial Consumers.
5. On-line CNG Station: CNG Compressors are to be installed to compress Natural Gas supplied through steel
pipelines to 250 Kg/cm2.g The Compressed gas will be dispensed through twin arm Car/Auto Dispensers or Single
arm Bus Dispensers. Stationary CNG Cascade of 3000 WL capacity will be installed in each compressor cum
dispenser station to keep buffer storage of CNG when Dispensers are not dispensing. Cascade’s CNG will also
be used to dispense to Automobiles when Compressors are not to run.
6. On-line cum Mother Station: All facilities as stated in OLS as stated above along with Cascade filling will be called
On-Line-Mother Station. Dispensing to automobiles at Mother Station may or may not be present.
BATTERY LIMITS
Process Facility: From tap off point.
Utilities: Up - to Domestic, Commercial, Industrial and Automobile Consumers.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
DESIGN CRITERIA
Product: Natural Gas / RLNG
Unit of Measurement
Peak Realizable Demand (25th 54,480 SCMH equivalent to 1.3 18,000 SCMH equivalent to 0.432
Year) MMSCMD with 30% spare capacity MMSCMD with 30% spare capacity
available in the pipeline. available in the pipeline.
Network design 54,480 SCMH with 30% spare 18,000 SCMH with 30% spare capacity
capacity available considering the available considering the Peak Load
2. DISTRIBUTION PLAN & FACILITIES up to 25th year of 54480 SCMH at Ambala GA:
Facilities For Ambala District For Kurukshetra District
(Up to 25th year of 54480 SCMH at (Up to 25th year of 18,000 SCMH at
Ambala GA) Kurukshetra GA)
CNG Compressors (Capacity 23 Nos 05 Nos
1200 SCMH)
DRS (Capacity 1000 SCMH) 15 Nos. 08 Nos.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
3. PIPELINE THICKNESS: FOR AMBALA & KURUKSHETRA DISTRICT: Pipeline thickness
calculated as per ASME B 31.8
Pipeline Diameter 12 ‘’ - 4”,
Grade 12” Dia – API 5L Grade 60 / > 12” Dia – API 5L Grade B
Minimum Pipeline Wall Thickness 6.4 mm
Total Pipeline length 28.77 Km
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
13. SV-12 6.0 300# 3 Km from Pipli Chowk
14. SV-13 6.0 300# 6 Km from Pipli Chowk
15. SV-14 6.0 300# 9 Km from Pipli Chowk
16. SV-15 6.0 300# 12 Km from Pipli Chowk
17. SV-16 6.0 300# 15 Km from Pipli Chowk
Note: Sr. No. 10 - Pipeline of 10.3 Km from Saha Road to Saha Chowk and 25.9 Km from Saha Chowk to Extension
not to be laid. Only provisions indicated.
4” tap-off provided in Pipeline to connect to OLS / MS and DRS, PRS.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
3 Shahbad Pipli Chowk 22.08 1 1200 1 1000
4 Pipli Chowk HSID C 0.79 1 1200 1 1000 1 1000
5 Pipli Chowk Bus Stop 2.58 1 1200 1 1000
6 Bus Stop Old Bus Stop 2.82 1 1200 1 1000
7 Old Bus Stop Kurushetra 2.41 1 1200 1 1000
8 Kurushetra Pehowa Road 10.34 1 1200 2 1000
University
Note: Pipeline of 10.34 Km from Kurukshetra University to Pehowa Road is not to be laid. Only provisions indicated.
Load is considered and 4” tap-off provided in Pipeline to connect to OLS / MS and DRS, PRS.
City Gate Station (CGS) cum At Jalbera, close to Tap-off facility At Adhoya close to Tap Off facility
Mother Station facility consisting
the following facilities
Twin Stream Cartridge Filters Capacity 1000-54480 SCMH, 300# Capacity 1000 – 18000 SCMH, 300#
Twin Stream Pressure Reduction Each stream consisting of Slum-Shut Each stream consisting of Slum-Shut
unit (as specified in PNGRB’s Valve, Active Regulator and Monitor Valve, Active Regulator and Monitor
guidelines) Regulator. (capacity 1000 - 54480 Regulator. (capacity 1000 - 18000
SCMH), 300#. SCMH), 300#.
Inlet pressure 49 Kg/cm2.g Outlet Inlet pressure 49 Kg/cm2.g Outlet
pressure up-to 10 years 19 Kg/cm 2.g pressure up-to 10 years 19 Kg/cm 2.g
and once demand increase up to 35 and once demand increase up to 35
Kg/cm2.g Kg/cm2.g
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Creep Relief Valve Yes Yes
Pig Launcher Unit 12” Diameter X 18”; 300 # (8” Diameter X 14”: 300#) - From CGS
to Pipli Chowk: Pig launcher at CGS of
8”X12”- 300#. (Pipe length 41km). Pig
Receiver at Pipli Chowk
Branch Pipeline for Gas Engine 1 no. (Future Provision with one 1 no. (Future Provision with one More
driven 1200 SCMH capacity CNG More Gas Engine driven 1200 SCMH Gas Engine driven 1200 SCMH
Compressor capacity CNG Compressor). capacity CNG Compressor).
Stationary CNG Cascade of 3000 1 No. Future provision of one more 1 No. Future provision of one more
WL capacity cascade. cascade.
LCV Filling Station 1 no. with a provision of one more 1 no. with a provision of one more LCV
LCV filling. filling.
The following facilities are identical for Ambala & Kurukshetra Districts.
8. COMPRESSOR STATIONS FOR AUTOMOBILE DISPENSING
A. MOTHER STATION (MS):
1. Each Mother Station (MS) comprises Compressor/s, Stationary Cascade/s and Cascade Filling
facilities. Total 3 nos. connection of 2” diameter is provided to connect to each compressor. Stationary
cascade of 3000 WL capacity for each compressor to be provided. Compressor inlet pressure limited to 14-
19 kg / cm2. g. In case of inlet pressure increase one PRS (One filter + twin stream of (one SDV cum
PCV and another Monitor PCV) and 1 CRV) to be installed to reduce the pressure from max 35 kg/cm2g.
to 14-19kg/cm2. g.
2. Compressor: (Guiding Code: API 618/API 11P) Reciprocating Compressor with multiple stages (mostly
3 stages) with inter stage coolers to be installed to supply compressed natural gas at an outlet pressure of
255 kg/cm2. g. and 520 C (maximum) temperature. Compressor to be provided with 5-line priority panel for
automatic filling of Cascade and also stationary Cascade. Compressor inlet will have twin online
cartridge filters and Three number Coriolis Mass flow meter 1 no. for Gas Engine Driven Compressor and
2 nos. for Electric Motor Driven Compressor.
The Compressor to be installed in steel cabinet with fire detection and Carbon Di-Oxide flooding system.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
The capacity of Compressor will be mostly 1200 SCMH. Wherever required 650 SCMH capacity
compressor will be installed.
At Mother Station (MS) Gas Engine Driven Compressor will be installed. In case of scarcity of Natural
Gas, Electric Motor Driven Compressor to be used.
3. Cascade-Stationary: (Guiding Code: IS 7285 Part-II): 3000 WL capacity Stationary cascade to be installed
with compressor. If permits one stationary cascade per compressor to be installed.
4. Mobile cascade of capacity minimum 3000WL and maximum 4500 WL capacity mounted on LCV or HCV
will be parked for getting filled with CNG with pressure up to 250 kg/cm 2. g. The Cascade with a minimum
pressure 30 kg/cm2. g will be returned to MS for filling through Compressor.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
5.2. Bus Dispenser: Each dispenser is provided with single arm to dispense one bus at a time. The
dispensing capacity is 80 kg / minute. Coriolis mass flow meter to be installed with Weights and
Measures certification per arm.
C. ON-LINE STATION (OLS)
1. Each On-Line station comprises, Compressor, Stationary Cascade and Dispensers for Car / Auto filling
and / or Dispensers for Bus filling facilities. Total 3 nos. 2” diameter connection provided on 4” diameter
branch line to connect to each compressor. Stationary cascade of 3000 WL capacity for each
compressor to be provided.
The compressor inlet pressure is limited to 14 - 19 kg/cm2. g. In case of inlet pressure increase one
PRS (One filter + twin stream of (one SDV cum PCV and another Monitor PCV) and 1CRV) to be
installed to reduce the pressure from max 35 kg/cm2g. to 14-19 kg/cm2. g.
2. Compressor: (Guiding Code: API 6 A) Reciprocating Compressor with multiple stages (mostly 3
stages) with inter stage coolers to be installed to supply compressed natural gas at an outlet pressure
of 250 kg/cm2. g. and 300 C temperature. Compressor to be provided with 9-line priority panel for
automatic filling of Cascade and also stationary Cascade.
Compressor inlet pipeline will have twin online cartridge filters and One number Coriolis Mass flow
meter to be installed at compressor outlet.
The Compressor to be installed in steel cabinet with fire detection and Carbon Di-Oxide flooding
system.
The capacity of Compressor will be mostly 1200 SCMH. Wherever required 650 SCMH capacity
compressor may be installed.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
pressure of 250 kg/cm2. g. and 300 C temperature. Compressor to be provided with 5-line priority
panel for automatic filling of Cascade and also stationary Cascade.
One number Coriolis Mass flow meter to be installed at the inlet of compressor.
The Compressor to be installed in steel cabinet with fire detection and Carbon Di-Oxide flooding
system.
The capacity of Compressor will be mostly 250 SCMH. Wherever required 400 SCMH capacity
compressor may be installed.
Booster compressor will be hydraulically operated and driven by Electric Motor.
3. Cascade-Stationary: (Guiding Code: IS 7285 Part-II): 3000 WL capacity Stationary cascade to be
installed with compressor. If permits one stationary cascade per compressor to be installed.
4. Dispensers: (Guiding Code: IS 7285 Part-II):
4.1. Car Dispenser: Each dispenser is provided with twin arms to dispense two car or Auto at a time. The
dispensing capacity is 15 kg / minute per arm. Coriolis mass flow meter to be installed with Weights
and Measures certification per arm. Same dispenser is also used for LCV filling.
4.2. Mobile cascade of minimum capacity 3000WL/4500WL mounted on LCV/HCV will be parked to
supply CNG with pressure up to 250 kg/cm2 g. The cascade will be cut off once the cascade
pressure falls to 30 kg/cm 2g
E. DAUGHTER STATION (DB)
Each DB will have Mobile Cascade CNG unloading, Stationary Cascade and Dispensers for Car / Auto
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
10. SUPPLY OF NATURAL GAS TO DOMESTIC, COMMERCIAL, INDUSTRIAL
CONSUMERS THROUGH DRS AND MDPE PIPELINE:
▪ Piped Natural Gas (PNG) to Domestic, Commercial and Industrial Consumers (using low pressure gas) will
be supplied through MDPE Network.
▪ MDPE Network will be laid underground downstream of DRS to consumer location. GI / MS pipeline will be
laid above ground to connect to consumer.
▪ Service Regulator will be installed to supply PNG to Multi-storied buildings or High-rise buildings. Only meter
will be provided to consumer location. For individual house Pressure regulator and meter will be installed at
each location.
▪ For Commercial consumer Pressure Regulator and meter will be installed at each consumer location.
▪ For Industrial consumer twin stream Pressure Reduction unit and single meter to be installed
MDPE Pipeline details:
Material MDPE
Design pressure 7 Kg/cm2.g (Max)
Operating pressure 4-6 Kg/cm2.g (Max)
Diameter (OD) (mm) 180, 125, 90, 63, 32, and 20,
Wall Thickness SDR 11
Material Strength PE 100 / PE 70
Operating Temperature - 5 to 25 °C
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
12. Natural Gas Composition: (Composition of Dry Gas): a typical one
Sr. no. Component Volume %
1 Methane 90.94
2 Ethane 4.43
3 Propane 0.61
4 n-Butane 0.01
5 i-Butane 0.02
7 Nitrogen 0.12
Total 100%
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
REGULATION OF PETROLEUM AND NATURAL GAS REGULATORY BOARD (PNGRB): G.S.R. 612(E)
Code No. Access code for City or Local Natural Gas Distribution Network.
GSR 612(E) Technical Standards & Specifications including Safety standards for City or Local Natural
Gas Distribution
GSR 720(E) Network : Code of practice for Quality of Service for City or Local Natural Gas Distribution
Network
OISD- 141 Networks : Design and Construction requirements for cross country hydrocarbon
pipelines
OISD-118 Layouts for Oil and Gas Installations
OISD 179 Safety requirements for compression, storage, handling and refuelling of CNG for use in
automotive sector.
OISD 113 Classification of areas for electrical installations at hydrocarbon processing and handling
facilities
IS 5572/IS 5571 Guide for selection of electrical equipment for hazardous area
API - 607 Fire Test for Soft Seated Quarter Turn Valves
API - 6D Specification for Pipeline Valves (Gate, Plug, Ball and Check Valves)
API – 500 Recommended Practice for Classification of Locations for Classification of Locations for
Electrical Installations at Petroleum Facilities classified as Class I, Div. 1 and 2
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
In the HAZOP method, the guidewords are systematically applied to a segment of process equipment to promote
discussion on possible deviations from the design intention. The guidewords represent deviations to the design intent
and their use leads to systematic highlighting of hazards and operability problems.
The method identifies the causes of a deviation from the design intent by application of the guidewords. The ultimate
consequences are then identified and recorded without reference to the safeguards, which are in place (examples of
safeguards are plant design, control systems, and procedures). The consequences are then compared with the
safeguards and the HAZOP team then decides whether the current safeguards are adequate. If the team considers them
inadequate, then a recommendation is made to consider or add further safeguards.
HAZOP Process Flow Diagram
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
REFERENCES
Reference Documents for HAZOP - Desktop Process Safety Review (DPSR) Qualitative Risk Assessment
• Process Design Basic for HPOIL Gas Private Limited (HOGPL) – City Gas Distribution Project of Ambala –
• P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
• P & ID for Ambala CGD Facilities at Kirti Azad Chowk: Drawing No. 1007 -AMB – PC – PID - 1004, Rev.D3.
• P & ID for Ambala CGD Facilities at Devi Oil Pump: Drawing No. 1007 -AMB – PC – PID - 1005, Rev.D3.
• P & ID for Ambala CGD Facilities up to Chainage 20.37 KM : Drawing No. 1007 -AMB – PC – PID - 1006, Rev.D3.
• P & ID for Ambala CGD Facilities up to Chainage 14.42 KM: Drawing No. 1007 -AMB – PC – PID - 1007, Rev.D3.
• Block Flow Diagram – Station cum Mother Station at Jalbera – Ambala: Drawing No. 1007 -AMB – PC – PID –
• It was informed by the Client that P & ID for Kurukshetra District City Gate Station cum Mother Station and
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Proposed Steel Network for CGD Project in Ambala with Tap-off at Jalbera
(Network Planned For 25 years)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Proposed Steel Network for CGD Project in Kurukshetra with Tap - off at
Adhoya (Network Planned For 25 years)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
AMBALA DISTRICT
HAZOP STUDY
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE LIST AMBALA DISTRICT: The following NODE have been selected for HazOp Study
System: City Gate Station; Jalbera CGS CH 0.0 KM to Tangri River (Saha) CH up to 20.37 KM Pipeline
Node Description Tap-off point at SV 7 from GAIL’s Dadri – Bawana - Nangal Pipeline, Gail (Filtration + PRS +
Meterring Skid) Downstream -
Jalbera CGS CH 0.0 KM to Tangri River (Saha) CH up to 20.37 KM
Node Contents CGS / MS – Filtration, Pressure Reduction, Check Metering Facility and Odorizing facility,
• Twin Stream Cartridge Filters (Capacity 1000-54480 SCMH, 300#),
• Twin Stream Pressure Reduction unit (as specified in PNGRB’s guidelines) with each
stream consisting of Slum-Shut Valve, Active Regulator and Monitor Regulator.
(Capacity 1000 – 54,480 SCMH, 300#, Inlet pressure 49 Kg / cm2.g and Outlet pressure
19 Kg / cm2.g - 35 Kg / cm2.g)
• Creep Relief Valve
• Twin stream Check metering facility with Positive Displacement Flow meter and Turbine
Flow Meter.
• Odorization unit: Natural Gas to have a distinct odour.
• Tap off - At CH up to 5 KM / CH up to 6.85 KM (DRS 1001 Station) / At Kirti Azad Chowk
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Node Contents CGS / MS – Filtration, Pressure Reduction, Check Metering Facility and Odorizing facility,
• Twin Stream Cartridge Filters (Capacity 1000-54480 SCMH, 300#),
• Twin Stream Pressure Reduction unit (as specified in PNGRB’s guidelines) with each
stream consisting of Slum-Shut Valve, Active Regulator and Monitor Regulator.
(Capacity 1000 – 54,480 SCMH, 300#, Inlet pressure 49 Kg / cm2.g and Outlet pressure
19 Kg / cm2.g - 35 Kg / cm2.g)
• Creep Relief Valve
• Twin stream Check metering facility with Positive Displacement Flow meter and Turbine
Flow Meter.
• Odorization unit: Natural Gas to have a distinct odour.
• Tap off - At CH up to 5 KM / CH up to 6.85 KM (DRS 1001 Station) / At Kirti Azad Chowk
CH within 8.04 KM (To Devi Oil Store / Model Town Morh) / At CH up to 9.0 KM (DRS
1002 Station & HP Petrol Pump OLS CNG 1001) / At Polytechnic Chowk within Ch 10
KM / At CH up to 11 KM / at CH up to 14 KM / At CH up to 14.5 KM (Devi Oil OLS CNG
1002)
Polytechnic Chowk within Ch 10 KM – At Ch up to 10.50 KM (DRS 1003 Station) / At
Reference P & ID P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
• Drawing No. 1007 -AMB – PC – PID - 1001, Rev.D3.
• Drawing No. 1007 -AMB – PC – PID - 1002, Rev.D3.
• Drawing No. 1007 -AMB – PC – PID - 1003, Rev.D3.
Block Flow Diagram – Station cum Mother Station at Jalbera – Ambala:
• Drawing No. 1007 -AMB – PC – PID - 1008
P & ID for Ambala CGD Facilities at Kirti Azad Chowk:
• Drawing No. 1007 -AMB – PC – PID - 1004, Rev.D3.
P & ID for Ambala CGD Facilities at Devi Oil Pump:
• Drawing No. 1007 -AMB – PC – PID - 1005, Rev.D3.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Node Contents • Tap off - At CH up to 12.42 KM (Baldev Nagar DRS 1005 Station) / At CH up to 13.07KM
(Mahindra Singh OLS CNG 1005) / At CH up to 13.42 KM (Ajeeth Petrol Pump OLS
CNG 1006) / At CH up to 14.42 KM (DRS 1006 Station)
• Sectionalizing Valve Station – SV 8 at CH up to 9.42 KM / SV 6 at CH up to 12.42 KM /
SV 7 at CH up to 14.42 KM
Reference P & ID P & ID for Ambala CGD Facilities up to Chainage 20.37 KM
• Drawing No. 1007 -AMB – PC – PID - 1006, Rev.D3.
P & ID for Ambala CGD Facilities up to Chainage 14.42 KM
• Drawing No. 1007 -AMB – PC – PID - 1007, Rev.D3
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
Drawing No. 1007 - AMB – PC – PID - 1002, Rev. D3.
Flow Rate 20 SCMH (Min.) / 54,480 SCMH (Max.) Design Pressure 49 kg/cm2g
Operating Range for 20 SCMH (Min.) / 1,900 SCMH (Max.) at Design Temperature -29 / 650C
Positive Displacement 19 kg/cm2g
Flow Meter
Operating Range for 1,500 SCMH (Min.) / Location Class
Turbine Floe Meter 54,480 SCMH (Max.)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
Drawing No. 1007 - AMB – PC – PID - 1003, Rev. D3.
Operating Temperature 00C Min./ 450C Max. Location Class - Pipeline Class 4
P & ID for Ambala CGD Facilities at Kirti Azad Chowk: Drawing No. 1007 -AMB – PC – PID - 1004, Rev.D3.
Operating Temperature 00C Min./ 450C Max. Location Class - Pipeline Class 4
P & ID for Ambala CGD Facilities at Devi Oil Pump: Drawing No. 1007 -AMB – PC – PID - 1005, Rev.D3.
Operating Temperature 00C Min./ 450C Max. Location Class - Pipeline Class 4
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Operating Temperature 00C Min./ 450C Max. Location Class - Pipeline Class 4
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
AMBALA DISTRICT
HAZOP STUDY
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 1
City Gate Station, Jalbera CGS CH 0.0 KM
to
Tangri River (Saha) CH up to 20.37 KM Pipeline
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 1
System: City Gate Station; Jalbera CGS CH 0.0 KM to Tangri River (Saha) CH up to 20.37 KM Pipeline
Node Description Tap-off point at SV 7 from GAIL’s Dadri – Bawana - Nangal Pipeline, Gail (Filtration + PRS +
Meterring Skid) Downstream -
Jalbera CGS CH 0.0 KM to Tangri River (Saha) CH up to 20.37 KM
Node Contents CGS / MS – Filtration, Pressure Reduction, Check Metering Facility and Odorizing facility,
• Twin Stream Cartridge Filters (Capacity 1000-54480 SCMH, 300#),
• Twin Stream Pressure Reduction unit (as specified in PNGRB’s guidelines) with each
stream consisting of Slum-Shut Valve, Active Regulator and Monitor Regulator.
(Capacity 1000 – 54,480 SCMH, 300#, Inlet pressure 49 Kg / cm2.g and Outlet pressure
19 Kg / cm2.g - 35 Kg / cm2.g)
• Creep Relief Valve
• Twin stream Check metering facility with Positive Displacement Flow meter and Turbine
Flow Meter.
• Odorization unit: Natural Gas to have a distinct odour.
• Tap off - At CH up to 5 KM / CH up to 6.85 KM (DRS 1001 Station) / At Kirti Azad Chowk
CH within 8.04 KM (To Devi Oil Store) / At CH up to 9.42 (To Jagdot Road) / At CH up
to 12.42 KM (To Kurukshetra) / At CH 13.92 (DRS 1004 Station & OLS- CNG 1004) / At
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 1.1.1.9
(Contd.) PRS & Metring skid and
Pressure and flow
controllers installed at
GAIL Metering Sked
facility.
1.1.1.10
Pressure Gauge Installed
at all DRS / OLS CNG
Stations
1.2 1.2.1 1.2.1.1 1.2.1.1
Rapture of Loss of Same as 1.1.1.1 and Gas detectors
pipeline containment 1.1.1.2 Testing and
leading to fire calibration should
1.2.1.2
hazard be carried out as
Upstream shutdown as per schedule and
per GAIL O&M manufacturer
procedures. instruction and
1.2.1.3 records should be
Gas detectors provided. maintained.
1.2.1.2
1.2.1.4
Portable firefighting
Isolation valves and appliances Refilling,
Sectionalizing valves SV Inspection and
1 at CH 3.0 KM / SV 2 at Maintenance should
CH 6 KM / SV 3 at CH 8
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
B: PARAMETER: FLOW GUIDE WORD: LESS / NO
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
2.4. 2.4.1 2.4.1.1 2.4.1.1
Leakage in the Fire and Same as 2.1.1.1 & Portable firefighting
aboveground explosion on 2.1.1.2. appliances Refilling,
section of exposure to Inspection and
2.4.1.2.
pipeline. ignition source Maintenance should
Isolation valves and be conducted as
Sectionalizing valves per IS 2190:2010)
installed. Same as 1.2.1.4 Fire Extinguisher
2.4.1.3 Inspection and
Potable firefighting Maintenance
appliance available at Schedule [Annex C,
every CGS / OLS / MS. Annex D, Annex F]
2.4.1.4 and records should
be maintained.
Civil administration 2.4.1.2.
firefighting systems shall
be available Emergency
handling
procedures should
be prepared and
implemented
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 4.1.1.9
(Contd.) Gas detectors provided
4.1.1.10
Isolation valves and
Sectionalizing valves
installed. Same as
1.2.1.4 .
4.1.1.11
Upstream shutdown as
per GAIL O&M
procedures.
4.1.1.12
Potable firefighting
appliance available at
every CGS / OLS / MS
4.1.1.13
Civil administration
firefighting systems shall
be available.
4.1.1.14
Pressure Gauge
Installed at all DRS / MS
OLS CNG Stations.
4.1.1.15
Vent with flame arrestor
goose neck / rain hood
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
Less / 5.4.1.4 5.4.1.2
No Potable firefighting Portable firefighting
(Contd.) appliance available at appliances Refilling,
every CGS / OLS / MS. Inspection and
Maintenance should
5.4.1.5
be conducted as
Civil administration per IS 2190:2010)
firefighting systems shall Fire Extinguisher
be available. Inspection and
Maintenance
Schedule [Annex C,
Annex D, Annex F]
and records should
be maintained.
5.4.1.3
Emergency
handling
procedures should
be prepared and
implemented.
5.5 5.5.1 5.5.1.1 5.5.1.1
Inadvertent Same as 5.1.1 PG / PI / PIT installed at Same as 5.1.1.1 &
withdrawal of gas CGS / MS downstream 5.2.1.2
at CGS / MS OLS / MS & DRS
downstream OLS
/ MS & DRS.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
F: PARAMETER: TEMPERATURE GUIDE WORD: HIGH
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
High 6. High 6.1. 6.1.1 6.1.1.1. 6.1.1.1.
temperature Potential risk of
Fire in nearby TG 1001 Installed at SV No vegetation
area of CGS / MS damage to 7 GAIL Metering Skid. should be allowed
& aboveground pipeline / leak to grow in the
and release of 6.1.1.2.
pipeline section. pipeline area.
NG in TG 1001, TT 1002 /
atmosphere 1006, TI 1002 / 1006 are 6.1.1.2.
leading to fire and available for low / high Portable firefighting
explosion. temperature alarm at appliances Refilling,
CGS cum MS at Jalbera. Inspection and
Maintenance should
6.1.1.3. be conducted as
CGS / MS and Piping per IS 2190:2010)
designed for – 290C to Fire Extinguisher
650C temperatures. Inspection and
6.1.1.4. Maintenance
Potable firefighting Schedule [Annex C,
appliance available at Annex D, Annex F]
every CGS / OLS / MS. and records should
be maintained.
6.1.1.5.
Civil administration
firefighting systems shall
be available
6.2. From 6.2.1 6.2.1.1 6.2.1.1
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 2
City Gate Station, Jalbera CGS CH 0.0 KM
to
Devi Oil Store CH up to 14.50 KM Pipeline
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 2
System: City Gate Station; Jalbera CGS CH 0.0 KM to Devi Oil Store CH up to 14.5 KM Pipeline
Node Contents CGS / MS – Filtration, Pressure Reduction, Check Metering Facility and Odorizing facility,
• Twin Stream Cartridge Filters (Capacity 1000-54480 SCMH, 300#),
• Twin Stream Pressure Reduction unit (as specified in PNGRB’s guidelines) with each
stream consisting of Slum-Shut Valve, Active Regulator and Monitor Regulator.
(Capacity 1000 – 54,480 SCMH, 300#, Inlet pressure 49 Kg / cm2.g and Outlet pressure
19 Kg / cm2.g - 35 Kg / cm2.g)
• Creep Relief Valve
• Twin stream Check metering facility with Positive Displacement Flow meter and Turbine
Flow Meter.
• Odorization unit: Natural Gas to have a distinct odour.
• Tap off - At CH up to 5 KM / CH up to 6.85 KM (DRS 1001 Station) / At Kirti Azad Chowk
CH within 8.04 KM (To Devi Oil Store / Model Town Morh) / At CH up to 9.0 KM (DRS
1002 Station & HP Petrol Pump OLS CNG 1001) / At Polytechnic Chowk within Ch 10
Reference P & ID P & ID for City Gate Station cum Mother Station at Jalbera - Ambala,
• Drawing No. 1007 -AMB – PC – PID - 1001, Rev.D3.
• Drawing No. 1007 -AMB – PC – PID - 1002, Rev.D3.
• Drawing No. 1007 -AMB – PC – PID - 1003, Rev.D3.
Block Flow Diagram – Station cum Mother Station at Jalbera – Ambala:
• Drawing No. 1007 -AMB – PC – PID - 1008
P & ID for Ambala CGD Facilities at Kirti Azad Chowk:
• Drawing No. 1007 -AMB – PC – PID - 1004, Rev.D3.
P & ID for Ambala CGD Facilities at Devi Oil Pump:
• Drawing No. 1007 -AMB – PC – PID - 1005, Rev.D3.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 1.1.1.9
(Contd.) PRS & Metring skid and
Pressure and flow
controllers installed at
GAIL Metering Sked
facility.
1.1.1.10
Pressure Gauge Installed
at all DRS / OLS CNG
Stations
1.2 1.2.1 1.2.1.1 1.2.1.1
Rapture of Loss of Same as 1.1.1.1 and Gas detectors
pipeline containment 1.1.1.2 Testing and
leading to fire calibration should
1.2.1.2
hazard be carried out as
Upstream shutdown as per schedule and
per GAIL O&M manufacturer
procedures. instruction and
1.2.1.3 records should be
Gas detectors provided. maintained.
1.2.1.2
1.2.1.4 Portable firefighting
Isolation valves and appliances Refilling,
Sectionalizing valves SV Inspection and
1 at CH 3.0 KM / SV 2 at Maintenance should
CH 6 KM / SV 3 at CH 8 be conducted as
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
2.4. 2.4.1 2.4.1.1 2.4.1.1
Leakage in the Fire and Same as 2.1.1.1 & Portable firefighting
aboveground explosion on 2.1.1.2. appliances Refilling,
section of exposure to Inspection and
2.4.1.2.
pipeline. ignition source Maintenance should
Isolation valves and be conducted as
Sectionalizing valves per IS 2190:2010)
installed. Same as 1.2.1.4 Fire Extinguisher
2.4.1.3 Inspection and
Potable firefighting Maintenance
appliance available at Schedule [Annex C,
every CGS / OLS / MS. Annex D, Annex F]
2.4.1.4 and records should
be maintained.
Civil administration 2.4.1.2.
firefighting systems shall
be available Emergency
handling
procedures should
be prepared and
implemented.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
D: PARAMETER: PRESSURE GUIDE WORD: MORE
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 4.1.1.9
(Contd.) Gas detectors provided
4.1.1.10
Isolation valves and
Sectionalizing valves
installed. Same as
1.2.1.4 .
4.1.1.11
Upstream shutdown as
per GAIL O&M
procedures.
4.1.1.12
Potable firefighting
appliance available at
every CGS / OLS / MS
4.1.1.13
Civil administration
firefighting systems shall
be available.
4.1.1.14
Pressure Gauge
Installed at all DRS / MS
OLS CNG Stations.
4.1.1.15
Vent with flame arrestor
goose neck / rain hood
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
Less / 5.4.1.4 5.4.1.2
No Potable firefighting Portable firefighting
(Contd.) appliance available at appliances Refilling,
every CGS / OLS / MS. Inspection and
Maintenance should
5.4.1.5
be conducted as
Civil administration per IS 2190:2010)
firefighting systems shall Fire Extinguisher
be available. Inspection and
Maintenance
Schedule [Annex C,
Annex D, Annex F]
and records should
be maintained.
5.4.1.3
Emergency
handling
procedures should
be prepared and
implemented.
5.5 5.5.1 5.5.1.1 5.5.1.1
Inadvertent Same as 5.1.1 PG / PI / PIT installed at Same as 5.1.1.1 &
withdrawal of gas CGS / MS downstream 5.2.1.2
at CGS / MS OLS / MS & DRS
downstream OLS
/ MS & DRS.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
F: PARAMETER: TEMPERATURE GUIDE WORD: HIGH
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
High 6. High 6.1. 6.1.1 6.1.1.1. 6.1.1.1.
temperature Potential risk of
Fire in nearby TG 1001 Installed at SV No vegetation
area of CGS / MS damage to 7 GAIL Metering Skid. should be allowed
& aboveground pipeline / leak to grow in the
and release of 6.1.1.2.
pipeline section. pipeline area.
NG in TG 1001, TT 1002 /
atmosphere 1006, TI 1002 / 1006 are 6.1.1.2.
leading to fire and available for low / high Portable firefighting
explosion. temperature alarm at appliances Refilling,
CGS cum MS at Jalbera. Inspection and
Maintenance should
6.1.1.3. be conducted as
CGS / MS and Piping per IS 2190:2010)
designed for – 290C to Fire Extinguisher
650C temperatures. Inspection and
6.1.1.4. Maintenance
Potable firefighting Schedule [Annex C,
appliance available at Annex D, Annex F]
every CGS / OLS / MS. and records should
be maintained.
6.1.1.5.
Civil administration
firefighting systems shall
be available
6.2. From 6.2.1 6.2.1.1 6.2.1.1
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 3
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 3
System: Model Town Morh SV Station 8 CH up to 9.42 KM to Jagdot Road SV Station 7 CH 14.42 KM
Pipeline
Node Description Model Town Morh SV Station 8 CH up to 9.42 KM to Jagdot Road SV Station 7 CH 14.42
KM
Node Contents • Tap off - At CH up to 12.42 KM (Baldev Nagar DRS 1005 Station) / At CH up to 13.07KM
(Mahindra Singh OLS CNG 1005) / At CH up to 13.42 KM (Ajeeth Petrol Pump OLS
CNG 1006) / At CH up to 14.42 KM (DRS 1006 Station)
• Sectionalizing Valve Station – SV 8 at CH up to 9.42 KM / SV 6 at CH up to 12.42 KM /
SV 7 at CH up to 14.42 KM
Reference P & ID P & ID for Ambala CGD Facilities up to Chainage 20.37 KM
• Drawing No. 1007 -AMB – PC – PID - 1006, Rev.D3.
P & ID for Ambala CGD Facilities up to Chainage 14.42 KM
• Drawing No. 1007 -AMB – PC – PID - 1007, Rev.D3
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
A: PARAMETER: FLOW GUIDE WORD: MORE
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
B: PARAMETER: FLOW GUIDE WORD: LESS / NO
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
C: PARAMETER: PRESSURE GUIDE WORD: MORE
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
D: PARAMETER: PRESSURE GUIDE WORD: LESS / NO
Leakage in the Fire and explosion The Pressure at any Gas detectors Testing
aboveground on exposure to point of steel network is and calibration should
ignition source within 15-17 Kg/cm2.g be carried out as per
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
section of and velocity 20 m / sec schedule and
pipeline. to supply to OLS, the manufacturer instruction
pipeline thickness and records should be
considered 6.4 mm API maintained.
5L as per ASME B31.8. 4.4.1.2
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
E: PARAMETER: TEMPERATURE GUIDE WORD: HIGH
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
High 5. High 5.1. 5.1.1 5.1.1.1. 5.1.1.1.
temperature Potential risk of
Fire in nearby Same as NODE 2 - No vegetation
area of CGS / MS damage to 6.1.1.1 / 6.1.1.2 / 6.1.1.3 should be allowed
& aboveground pipeline / leak / 6.1.1.4 / 6.1.1.5 to grow in the
pipeline section. and release of pipeline area.
NG in
atmosphere 5.1.1.2.
leading to fire and Portable firefighting
explosion. appliances Refilling,
Inspection and
Maintenance should
be conducted as
per IS 2190:2010)
Fire Extinguisher
Inspection and
Maintenance
Schedule [Annex C,
Annex D, Annex F]
and records should
be maintained.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
G. PARAMETER: OTHER – CORROSION / ERROSION (GUIDE WORK – MORE)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H. PARAMETER: OTHER –STATIC ELECTRIC - STATIC CHARGE (GUIDE WORK –
MORE)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
KURUKSHETRA DISTRICT
HAZOP STUDY
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE LIST KURUKSHETRA DISTRICT: The following NODE have been selected for
HazOp Study
Reference P & ID & • Process Design Basic for HPOIL Gas Private Limited (HOGPL) – City Gas Distribution
Design Intents Project of Ambala – Kurukshetra District and Kohlapur District.
• P & IDs of Ambala District considered for the HAZOP Study as per Client (P & ID
for Kurukshetra District City Gate Station cum Mother Station and GCD are
identical as Ambala District P & ID’s).
• Design Intents – Considered same as Ambala District as per Client.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
KURUKSHETRA DISTRICT
HAZOP STUDY WORK SHEET
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
NODE 1
City Gate Station, Adhoya CGS CH 0.0 KM
to
Kurukshetra University CH up to 49.59 KM
Pipeline
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 1.1.1.9
(Contd.) PRS & Metring skid and
Pressure and flow
controllers installed at
GAIL Metering Sked
facility.
1.1.1.10
Pressure Gauge Installed
at all DRS / OLS CNG
Stations
1.2 1.2.1 1.2.1.1 1.2.1.1
Rapture of Loss of Same as 1.1.1.1 and Gas detectors
pipeline containment 1.1.1.2 Testing and
leading to fire calibration should
1.2.1.2
hazard be carried out as
Upstream shutdown as per schedule and
per GAIL O&M manufacturer
procedures. instruction and
1.2.1.3 records should be
Gas detectors provided. maintained.
1.2.1.2
1.2.1.4 Portable firefighting
Isolation valves and appliances Refilling,
Sectionalizing valves SV Inspection and
1 to SV 16 installed. Maintenance should
be conducted as
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
B: PARAMETER: FLOW GUIDE WORD: LESS / NO
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
2.4. 2.4.1 2.4.1.1 2.4.1.1
Leakage in the Fire and Same as 2.1.1.1 & Portable firefighting
aboveground explosion on 2.1.1.2. appliances Refilling,
section of exposure to Inspection and
2.4.1.2.
pipeline. ignition source Maintenance should
Isolation valves and be conducted as
Sectionalizing valves per IS 2190:2010)
installed. Same as 1.2.1.4 Fire Extinguisher
2.4.1.3 Inspection and
Potable firefighting Maintenance
appliance available at Schedule [Annex C,
every CGS / OLS / MS. Annex D, Annex F]
2.4.1.4 and records should
be maintained.
Civil administration 2.4.1.2.
firefighting systems shall
be available Emergency
handling
procedures should
be prepared and
implemented
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
More 4.1.1.9
(Contd.) Gas detectors provided
4.1.1.10
Isolation valves and
Sectionalizing valves
installed. Same as
1.2.1.4 .
4.1.1.11
Upstream shutdown as
per GAIL O&M
procedures.
4.1.1.12
Potable firefighting
appliance available at
every CGS / OLS / MS
4.1.1.13
Civil administration
firefighting systems shall
be available.
4.1.1.14
Pressure Gauge
Installed at all DRS / MS
OLS CNG Stations.
4.1.1.15
Vent with flame arrestor
goose neck / rain hood
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
Less / 5.4.1.4 5.4.1.2
No Potable firefighting Portable firefighting
(Contd.) appliance available at appliances Refilling,
every CGS / OLS / MS. Inspection and
Maintenance should
5.4.1.5
be conducted as
Civil administration per IS 2190:2010)
firefighting systems shall Fire Extinguisher
be available. Inspection and
Maintenance
Schedule [Annex C,
Annex D, Annex F]
and records should
be maintained.
5.4.1.3
Emergency
handling
procedures should
be prepared and
implemented.
5.5 5.5.1 5.5.1.1 5.5.1.1
Inadvertent Same as 5.1.1 PG / PI / PIT installed at Same as 5.1.1.1 &
withdrawal of gas CGS / MS downstream 5.2.1.2
at CGS / MS OLS / MS & DRS
downstream OLS
/ MS & DRS.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
F: PARAMETER: TEMPERATURE GUIDE WORD: HIGH
Guide Deviation Causes Consequences Safe Guard / Control Recommendations
Word Measure
High 6. High 6.1. 6.1.1 6.1.1.1. 6.1.1.1.
temperature Potential risk of
Fire in nearby TG 1001 Installed at SV No vegetation
area of CGS / MS damage to 6 GAIL Metering Skid. should be allowed
& aboveground pipeline / leak to grow in the
and release of 6.1.1.2.
pipeline section. pipeline area.
NG in TG 1001, TT 1002 /
atmosphere 1006, TI 1002 / 1006 are 6.1.1.2.
leading to fire and available for low / high Portable firefighting
explosion. temperature alarm at appliances Refilling,
CGS cum MS at Adhoya. Inspection and
Maintenance should
6.1.1.3. be conducted as
CGS / MS and Piping per IS 2190:2010)
designed for – 290C to Fire Extinguisher
650C temperatures. Inspection and
6.1.1.4. Maintenance
Potable firefighting Schedule [Annex C,
appliance available at Annex D, Annex F]
every CGS / OLS / MS. and records should
be maintained.
6.1.1.5.
Civil administration
firefighting systems shall
be available
6.2. From 6.2.1 6.2.1.1 6.2.1.1
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
H. PARAMETER: OTHER – CORROSION / ERROSION (GUIDE WORK – MORE)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
I. PARAMETER: OTHER –STATIC ELECTRIC - STATIC CHARGE (GUIDE WORK –
MORE)
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com
HSE-RM Solutions
CONCLUSION
The evaluation of the documents indicative that for designing of the City Gas Distribution Project for Ambala
– Kurukshetra District, the basic requirements of the applicable Codes and Standards are complied, and
control measures have been provided.
• PNGRB (Technical Standards & Specifications including Safety Standards for Natural Gas Pipelines)
Regulations, 2009 (T4S) and its Amendments.
• OISD 226 – Natural Gas Transmission Pipelines & City Gas Distribution.
• OISD 179 – Safety requirements for compression, storage, handling and refuelling of CNG for use in
automotive sector.
However, malfunction of equipment and human error cannot be oversighted, hence, it is recommended
that:
• Maintenance, testing and calibration of monitoring and detection equipment and systems (Flow,
Pressure & Temperature etc.) should be carried out periodically as per schedule and manufacturer
recommendations and record of such maintenance, testing and calibration etc. should be maintained.
• Firefighting equipment and appliances should be inspected and tested periodically, and records should
be maintained.
H S E
Risk Management Consultant & Service Solutions JUST SAFETY…
www.hse-rm.com