Professional Documents
Culture Documents
CIRCULAR
Industrial Safety and
is informed to all final year students of Batch 2023-25 M, Tech. -
It submit Project registration
Engineering to
Engineering / Metallurgical and Material Science(20234ME701) with guide's approval on or
form for the course - Project Work Phase-I
before 24/02/2024.
Thesis for Approval and Viva-Voce dates are as follows.
The proposed Review, Submission of
Zeroth review 24/02/2024
First review 30/03/2024
Second review 27/04/2024
11/05/2024
Submission of Thesis for HoD Approval
Viva-Voce
10/06/2024
HOD-iyclu
Mechancal Engneering
Vel Teclh
Raigl4.ati D:. S . . a
General Guidelines for Review and Viva Voce Examinations
following guidelines and contact your guide
Allstudents are instructed to strictly adhere the
for further proceedings.
1. Guidelines to prepare Power Point Presentation
a) Should be White Background and Block Letters.
b) Include Slide numbers.
c) Indicate Batch number, Guide name with Designation.
d) Slides should not be exceed 25 slides.
e) Concentrate on Grammatical and Spelling Mistakes.