At the outset, we thank you for giving us this opportunity to collaborate with your company
for designing of kitchens at the proposed hotel in Nasik.
Based on the plans shared by you, please find enclosed our detailed proposal for designing
of kitchens. We do hope that the proposal is in line with your requirements and await to hear
from you on next steps.
Best Regards,
For Plan D Consultants
Shivali Puranik
I. PROJECT FACTS –
Our approach is to setup kitchens which are functional and efficient with focus on
ease of operation for the staff. Our solutions aid in
After shortlisting of kitchen equipment vendor, we shall review shop drawings from kitchen
equipment vendor of equipments to be supplied and fabricated. We shall also visit the vendor’s
factory for inspection of equipments during fabrication and prior to dispatch.
Check list of defects, rectifications and approval for installation and commissioning of
equipments.
IV. FEES
Our fees for the above work scope shall be INR ***** /-.
Exclusions –
All taxes, levies and surcharges which shall be paid extra.
All expenses for site visit (travel, stay and all out-of-pocket expense) and / or to any other
location, for work related to this project, shall be reimbursed as per actuals.
a. Exclusions:
b. Contract termination:
We reserve the right to suspend work on a project and/or terminate the contract, in case there
is a delay in payment release. We shall not be responsible for any delays caused by late
payments, nor for any damages arising therefrom. Interest on overdue payments shall be
charged at PLR + 2%.
c. Design Revisions:
The aforementioned fees will comprise no more than two design revisions. Any additional
revisions requested shall be charged extra over and above the said fees.
The Client may at any time instruct us to suspend / terminate work on the project. This
instruction shall be in writing and delivered to the aforementioned address. Immediately
thereafter; we shall be entitled to be remunerated in full for services rendered and
disbursements incurred till the date of instruction. Fees for incomplete stages shall be
calculated on pro rata basis.
Should work on the project remain suspended for six or more months from the date of
suspension; the project shall be deemed to be automatically terminated. Should the work be
resume at any time after suspension of the project, we shall submit a revised proposal for the
balance works.
e. Liability of Consultant:
Where the design in relation to the project is undertaken by client appointed consultants, we
shall not be responsible for the production of the design solution, nor be liable for
performance and / or delays.
In any case, notwithstanding anything contrary contained in any of the provisions of this
contract, the liability of either party against any risk other than statutory non-compliances shall
not exceed total value of this contract.
Notwithstanding any provision of this contract to the contrary, neither party shall be liable to
the other party in respect of any consequential or punitive or economic loss or damage
(whether or not foreseeable at the date of this contract and whether or not arising out of the
negligence of either party) that may arise out of the performance of or breach of this contract
including but not limited to loss of profits, loss of trade and business interruption.
The project documents prepared by us are our copyright and remain our intellectual property.
The client has the right of use of the documents for the sole purpose of this contract. Client
shall take written permission from the us, in case of part or complete use of the said
documents.
h. Other Conditions:
This offer is valid for a period of 15 days from the date of proposal.
Any project assigned to us shall be for the entire work scope and not for part works.
The aforementioned fee is only for Kitchen Designing Services of First Floor kitchen,
Tenth Floor kitchen and Terrace Floor kitchen at proposed Hotel in Nasik. For any
other design requirements, a separate design fee shall be applicable.