Professional Documents
Culture Documents
Dear Sir,
We would like to submit our best offer for the Design Services of your Lighting Layout
of the public market. Breakdown of Professional services as follows, to wit:
I. SCOPE OF WORKS
1. Attend conference/s with the Client-Owner, or with technical staff to get relevant
information about the project current status, (if required),
2. Designing and drafting of lighting layout:
a.
3. Submit one set of Bill of Quantities,
4. Submit three sets of Material Specifications duly signed and sealed,
5. Sign and seal of the blue prints of lighting plans provided. Printing is not included.
Upon signing of Contract a down payment equivalent to THIRTY (30%) PERCENT of contract
price shall be released.
Upon submission of sign and sealed drawings, the balance of FIFTEEN (15%) PERCENT be
released.
Design, drafting and sign seal shall be done in FIFTEEN (15) working days reckoned from receipt
of the down payment, base plan/s and signed contract.
if check payment, please pay to San Miguel Lighting and Engineering Services.
If required for site visit and to attend the weekly technical coordination meeting, the design-
consultant/s shall be paid of 5,000.00 each day per site visit, or 4,000.00 for technical staff /
representative, plus travel expense, meal allowance and accommodation, if project location is
outside Metro-Manila.
1. Provide base plans in cad file, as-built drawings if there is existing structure to be considered,
instructional notes and data pertaining to type of lighting fixtures, and other equipment model,
brand, etc. that would be necessary to complete the design.
2. Once design is done and submitted before changes or additional instruction is given, the revision
of drawings shall be charged accordingly and shall be computed base on the man hour rate of the
Dear sir,
We would like to submit our best offer for the design and installation of your lighting
requirements listed hereunder. Breakdown of scope of works with costs as follows, to wit,
SPECIALIZED SERVICES
LIGHTING LAYOUT
Upon submission of the preliminary design 30% of Fee P 5,395,200
Upon submission of the final design 50% of Fee P 2,697,600
Total Fee P 14,387,200
C. COMMENCEMENT OF WORK
1. Upon receipt of the down payment, we will mobilize our workers, tools and equipment to
finish the project in accordance to scope of works written in the BOQ, and lighting
layout plans drawn on working drawings.
2. Project shall be finished within the General Contractors project schedule.