Drainage 60+000 to 69+000

Item No. Description Qty. Unit


(100mm dia.) HDPE Pipe w/ Slot Riser 638.925 m
(150mm dia.) HDPE Pipe w/ Slot Riser 1847.557 m
(200mm dia.) HDPE Pipe w/ Slot Riser 60.065 m
(300mm dia.) HDPE Pipe w/ Slot Riser 220..483 m
(100mm dia.) HDPE Pipe 2622.6 m
(150mm dia.) HDPE Pipe 590.8 m
(200mm dia.) HDPE Pipe N/A m
(300mm dia.) HDPE Pipe 187.642 m
Recess access box - recommended to
install a recessed access box either an
outlet or drain basin with metal frames 123 set
and gratings every 40m to ensure the
cleaning of the drain is possible.
503(1) Metal Frames and Gratings 14 set

Adjusting Manholes, frames covers, and


gratings shall be removed, Each structure
502(7) 14 pc/pcs
shall be cleaned of any accumulation of
debris or foreign matters.

Pipe cleaned in place will be measure


504(3) 243.536 m
along the flow line of the pipe line.
Cleaning/Reconditioning of drainage
504(5) 14 pc/pcs
structures
Bed Course Granular Material - as
510(3) requred place base material in the 402.14 cu.m
bottom of the trench.

Backfill the trench with concrete - backfill


material should be placed simultaneuosly
510(2) 630.59 cu.m
on both sides of the slot to prevent the
pipe from shifting or moving.

233.07
238.66
13.23
145.63
630.59
38.925
124.72
4.51

19.85
157.36
39.88

16.89

402.135
Drainage 69+000 to 89+000
Item No. Description Qty. Unit
(100mm dia.) HDPE Pipe w/ Slot Riser 2045.64 m
(150mm dia.) HDPE Pipe w/ Slot Riser 1415.57 m
(200mm dia.) HDPE Pipe w/ Slot Riser m
(300mm dia.) HDPE Pipe w/ Slot Riser 20.57 m
(100mm dia.) HDPE Pipe 796.12 m
(150mm dia.) HDPE Pipe 583.52 m
(200mm dia.) HDPE Pipe m
(300mm dia.) HDPE Pipe 18.53 m
Recess access box - recommended to
install a recessed access box either an
outlet or drain basin with metal frames 94 pc/pcs
and gratings every 40m to ensure the
cleaning of the drain is possible.
503(1) Metal Frames and Gratings 30 set

Adjusting Manholes, frames covers, and


gratings shall be removed, Each structure
502(7) 30 set
shall be cleaned of any accumulation of
debris or foreign matters.

Pipe cleaned in place will be measure


504(3) 622.92 m
along the flow line of the pipe line.
Cleaning/Reconditioning of drainage
504(5) 30 pc/pcs
structures
Bed Course Granular Material - as
510(3) requred place base material in the 309 cu.m
bottom of the trench.

Backfill the trench with concrete - backfill


material should be placed simultaneuosly
510(2) 416.84 cu.m
on both sides of the slot to prevent the
pipe from shifting or moving.

220.92
9.32
186.6
416.84

H ave 0.213981
0.515
0.246693
122.74
95.56

1.86
47.77
39.39

1.67

100mm DIA. H 300mm DIA. H 150mm DIA. H


0.1797 0.9865 0.15
0.1795 0.4085 0.2506
0.1794 0.15 0.246
0.1792 0.2404
0.1792 0.239
0.1792 0.2401
0.1793 0.2409
0.1792 0.2386
0.179 0.2425
0.1817 0.242
0.179 0.2404
0.1784 0.2375
0.1795 0.2404
0.1789 0.2437
0.15 0.2397
0.15 0.15
0.15 0.15
0.15 0.2389
0.6182 0.15
0.1782 0.2361
0.181 0.2397
0.1821 0.15
0.1815 0.15
0.1801 0.15
0.1809 0.2568
0.1819 0.2353
0.1812 0.2341
0.181 0.2359
0.1814 0.2358
0.1797 0.3453
0.1803 0.15
0.1817 0.15
0.1792 0.2853
0.15 0.4311
0.17 0.4368
0.182 0.4325
0.1818 0.4382
0.1826 0.474
0.1846 0.5097
0.1819 0.2354
0.181 0.2406
0.1835 0.15
0.1841 0.2357
0.1819 0.237
0.1821 0.2406
0.1821 0.2428
0.1821 0.2431
0.1837 0.2444
0.1801 0.2404
0.15 0.2417
0.1782 0.2428
0.348 0.2434
0.3878 0.242
0.4175 0.2422
0.5573 0.2434
0.6071 0.2428
0.6869 0.2414
0.6566 0.2428
0.5764 0.2431
0.7162 0.2414
0.596 0.2414
0.4557 0.2423
0.15 0.2394
0.4582 0.2377
0.178 0.15
0.1817 0.2376
0.1806 0.2371
0.1803 0.2361
0.1826 0.2363
0.1809 0.2363
0.1858
0.1786
0.1786
0.2414
0.2422
0.2422
0.2422
0.2428
0.2414
0.242
0.2428
0.2408
0.2417
0.2428
0.2425
0.2404
0.2406
0.242
0.242
0.2411
0.2414
0.2406
0.2417
0.2428
0.239
0.2408
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.1896
0.15
0.15
0.15
0.15
0.15
0.1802
0.1797
0.1788
0.1784
0.1788
0.15
0.1785
0.1794
0.1782
0.1786
0.1782
0.4182
0.15
0.15
0.15
0.1788
0.15
0.2083
0.1982
0.1782
0.1782
0.4582
0.15
0.15
0.15
0.1782
0.5282
0.15
0.2049
0.15
0.15
0.15
0.15
0.15
0.1795
0.1787
0.1792
0.1791
0.1787
0.1782
0.15
0.15
0.15
0.15
0.1924
0.1841
0.1804
0.1853
0.1841
0.1812
0.1825
0.15
0.15
0.1829
0.15
0.1797
0.2895
0.1782
0.1796
0.1904
0.1825
0.1841
0.1844
0.1846
0.1821
0.15
0.1833
0.1846
0.1851
0.1846
0.1856
0.1846
0.834
0.1784
0.1839
0.1817
0.15
Drainage 89+000 to 98+000
Item No. Description Qty. Unit
(100mm dia.) HDPE Pipe w/ Slot Riser 1675.151 m
(150mm dia.) HDPE Pipe w/ Slot Riser 1568.58 m
(200mm dia.) HDPE Pipe w/ Slot Riser m
(300mm dia.) HDPE Pipe w/ Slot Riser 182.5 m
(100mm dia.) HDPE Pipe 652.129 m
(150mm dia.) HDPE Pipe 493.751 m
(200mm dia.) HDPE Pipe m
(300mm dia.) HDPE Pipe 224.624 m
Recess access box - recommended to
install a recessed access box either an
outlet or drain basin with metal frames 83 pc/pcs
and gratings every 40m to ensure the
cleaning of the drain is possible.
503(1) Metal Frames and Gratings 13 set

Adjusting Manholes, frames covers, and


gratings shall be removed, Each structure
502(7) 13 set
shall be cleaned of any accumulation of
debris or foreign matters.

Pipe cleaned in place will be measure


504(3) 315.93 m
along the flow line of the pipe line.
Cleaning/Reconditioning of drainage
504(5) 13 pc/pcs
structures
Bed Course Granular Material - as
510(3) requred place base material in the 315.5 cu.m
bottom of the trench.

Backfill the trench with concrete - backfill


material should be placed simultaneuosly
510(2) 473.99 cu.m
on both sides of the slot to prevent the
pipe from shifting or moving.

163
198.19
112.8
473.99
100.51
105.88

16.43
39.13
33.33

20.22

0
Drainage

Item No. Description Qty. Unit Unit Cost Total Cost


aluminum slot riser

501(4) Underdrain 1 Lump sum / /

(100mm dia.) Corrugated HDPE Pipe w/


Aluminum Slot Riser and Galvanized 4360.02 m
Gratings
(150mm dia.) Corrugated HDPE Pipe w/
Aluminum Slot Riser and Galvanized 4831.71 m
Gratings
(200mm dia.) Corrugated HDPE Pipe w/
Aluminum Slot Riser and Galvanized 60.07 m
Gratings
(300mm dia.) Corrugated HDPE Pipe w/
Aluminum Slot Riser and Galvanized 423.56 m
Gratings
(100mm dia.) Corrugated HDPE Pipe 4070.85 m 672
(150mm dia.) Corrugated HDPE Pipe 1668.08 m 1418
(300mm dia.) Corrugated HDPE Pipe 430.8 m 6806
Recess access box w/ metal frames and
300 each
gratings - recommended to install a recessed access box outlet every 40m to ensure the cleaning of the drain is possible.
Bed Course Granular Material 309 cu.m 454.22 120 - as required place base material in the bottom of the trench.
Adjusting catch basins (existing catch
502(8) 57 each
basins)
Metal Frames and Gratings to be
502(5) 7740.89 kg
installed on existing catch basins 87.11
Pipe cleaned in place will be measure
504(3) 622.92 m
along the flow line of the pipe line.

504(5) Cleaning/Reconditioning of catch basin 1 Lump sum 57 SET

Backfill the trench with concrete -


backfill material should be placed
510(2) simultaneously on both sides of the slot 416.84 cu.m 7745.56
to prevent the pipe from shifting or
moving.

Adjusting
catch
basins
502(8) 4 each
(new
catch
basins)
1.02

Metal
Frames
and
Gratings
502(5) to be 229.22 kg
installed
on new
catch
basins

You might also like