All works should be done:

60 cm
150 cm
roof replacing
43 sq. meter

tiling works (floor, Cr, and sink)


210 cm painting works (wall and Ceiling)
ceiling work
110 cm
63 sq. meters electrical works
water lines (CR and sink)

20 sq. meters

UNIT 3
All works should be done:
fire wall placing
Fire wall

hollow blocks placing


Roof clearing
31 sq. meters replacing the broken gutter