Grid Impact Study (GIS) for 7 MWp
Solar PV Power Plant at SBI Tuban
EMI027/232/B01006/R02
This page is intentionally left blank
Business Proposal Document Number
EMI027_232_B01006_R02
23-02-03 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R00 Approved
23-03-03 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R01 Approved
23-03-08 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R02 Approved
Business Proposal Document Number
EMI027_232_B01006_R02
TABLE OF CONTENTS
TABLE OF CONTENTS .............................................................................................................................................. ii
C. Timeline ................................................................................................................................................... 12
EMI027_232_B01006_R02
EXECUTIVE SUMMARY
PT Empat Mitra Indika Tenaga Surya (hereinafter “Emits”), is a Joint Venture Company to
participate in realizing Indonesia’s enormous potential in Solar PV with support from its founding
companies – Indika Energy Tbk. (Indika) and Fourth Partner Energy Limited (FPEL). Currently,
Emits, wants to conduct Grid Impact Study (GIS) for 7 MWp Solar PV Power Plant at SBI Tuban.
Emits need a consultant to conduct this project.
EMI027_232_B01006_R02
I. COMPANY PROFILE
A. Organization Information
Synkrona is pleased to present herewith credentials and capabilities towards fulfilling the
requirements under the Scope of Work and meeting the objectives of the proposed. Below is
the detailed company information:
a. Official Registered Title : PT Synkrona Enjiniring Nusantara
b. Type of Business : Private Company
c. Address : Tifa Arum Realty 5th Floor, Jl. Kuningan Bar. 1 No.26,
RT.6/RW.1, Kuningan Bar., Kec. Mampang Prpt., Kota
Jakarta Selatan, DKI Jakarta, Indonesia 12710
d. Telephone/Fax : +62 21 290-23131
Synkrona is a leading professional consulting company focused on energy and engineering
services. Our expertise includes engineering design, study, power system analysis, and other
engineering services.
Synkrona has vast and exhaustive experiences from various challenging projects in Indonesia.
Our main concern is to provide a thorough and comprehensive engineering process, detailed
analysis and careful planning, and accuracy in every work. The short-term goal of our solution
is to minimize the client’s losses and optimize energy costs while the long-term goal is to
reduce global warming for greener and cooler environments.
Synkrona is a dedicated partner to accompany clients to make great decisions on their strategy
and organization. Below are the services that Synkrona provide:
1. General Consultancy and Engineering Services;
2. Front End Engineering Design (FEED);
3. Detailed Engineering Design (DED);
4. Feasibility Study (Pre-FS) and Feasibility Study (FS);
5. Pre-Grid Impact Study (Pre-GIS) and Grid Impact Study (GIS); and
6. Project Management Consulting (PMC) or Owner Engineer (OE)
Business Proposal Document Number
EMI027_232_B01006_R02
Year of
Title of Assignment Client
Execution
Grid Facility Study Wind Power Plant in Sulawesi Private IPP 2018
Site Selection, Feasibility Study, and Grid Impact Study for Private IPP 2019
2x10 MW Solar PV Hybrid Power Plant (PV+BESS) in East
Kalimantan
Pre-Feasibility Study and Grid Impact Study for 100 MW Private IPP 2020
Belitung Solar PV Power Plant
Grid Impact Study for 7 MWp Solar PV Hybrid Power Plant Private IPP 2021
(PV-BESS) in Morotai
Appendix I - Project Experience, shows more detail about Synkrona’s project experience.
Business Proposal Document Number
EMI027_232_B01006_R02
C. Key Personnel
Key Personnel who will work on these projects are listed below.
Years of Experience:
Fajar Sastrowijoyo,
• 11 years
S.T., M.Eng.
Position:
• Advisor
2 Education and Background
• Bachelor, Industrial Engineering, Universitas Gajah Mada
(UGM), 2007
Years of Experience:
• 13 years
Dicky Pranadias, S.T. Position:
• Project Director
Business Proposal Document Number
EMI027_232_B01006_R02
• Engineering Manager
4 Education and Background
• Bachelor, Electrical Engineering, Sepuluh Nopember
Institute of Technology (ITS), Indonesia, 2019
Years of Experience:
• 5 years
Position:
Appendix II - Curriculum Vitae shows more detail about the competency and experience of the
key personnel.
Business Proposal Document Number
EMI027_232_B01006_R02
2 System Modeling -
Exc. any meeting(s)/negotiation to
3 Grid Impact Study PLN regarding the Grid Impact Study
approval
d. Transient Analysis -
e. Protection Analysis -
EMI027_232_B01006_R02
System Modeling
No
Negative Impact Grid Code Compliance
Mitigation Strategy Study
Yes
The detailed work plan and methodology to conduct this study are described as follows:
1. Site Survey and Data Collection (Optional Service)
If the Client can’t provide the required data for this project, Synkrona will conduct a
site survey to collect the data needed for the study.
Business Proposal Document Number
EMI027_232_B01006_R02
2. System Modeling
Synkrona will conduct a system modeling based on the data gathered, using DIgSilent
Power Factory software. In case several data are not available, the consultant will use
reasonable assumptions based on similar or typical data from the consultant
database.
3. System Modeling
In this Project, Synkrona will conduct simulations for the following:
EMI027_232_B01006_R02
The result of the simulation will be analyzed to verify the state of the system after PV
interconnection. Synkrona will analyze the new system according to the related IEC,
IEEE, and SPLN standards.
EMI027_232_B01006_R02
C. Timeline
The timeline of the project that Synkrona proposed is presented below:
1. Optional 1 - If the Site Survey & Data Collection are not required
Table II - 3 Project Timeline Optional 1
EMI027_232_B01006_R02
EMI027_232_B01006_R02
EMI027_232_B01006_R02
IV. CONCLUSION
With extensive experience in delivering excellent products to our previous clients and competent
team members, Synkrona is capable to deliver a Grid Impact Study (GIS) for 7 MWp Solar PV Power
Plant at SBI Tuban. We believe that we can provide the best consulting services to meet Emits's
needs.
Dicky Pranadias
Director
PT Synkrona Enjiniring Nusantara
Tifa Arum Realty 5th Floor, Jl. Kuningan Bar. 1 No.26, RT.6/RW.1,
Kuningan Bar., Kec. Mampang Prpt., Kota Jakarta Selatan,
DKI Jakarta, Indonesia 12710
Business Proposal Document Number
EMI027_232_B01006_R02
EMI027_232_B01006_R02
Year of
No. Title of Assignment Client
Execution
1 Feasibility Study, Grid Impact Study, and Detailed ESDM 2016
Engineering Design (DED) for Manokwari 2 MWp Solar Ministry
PV Power Plant
2 Grid Impact Study for Waingapu 1 MW Wind Power WHyPGen, 2016
Plant UNDP
3 Feasibility Study, Grid Impact Study, and Front-End PT. ITM 2017
Engineering Design (FEED) for Solar PV Hybrid Power Banpu
Plant (PV+DPP)
4 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2017
for Solar PV Hybrid Power Plant (PV+BESS+DPP) in Nusa
Tenggara Timur (8 Site) and Nusa Tenggara Barat (5 site)
5 Grid Facility Study Wind Power Plant in Sulawesi Private IPP 2018
6 Grid Impact Study and Capacity Planning for Tidal Power Private IPP 2018
Plant in Sumatera
7 Grid Impact Study for 20 MW Hydro Power Plant in Private IPP 2019
Sumatera Selatan
8 Site Selection, Feasibility Study, and Grid Impact Study Private IPP 2019
for 4x10 MW Solar PV Hybrid Power Plant (PV+BESS) in
West Kalimantan
9 Site Selection, Feasibility Study, and Grid Impact Study Private IPP 2019
for 2x10 MW Solar PV Hybrid Power Plant (PV+BESS) in
East Kalimantan
10 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 10 MW Ambon Solar PV Hybrid Power Plant
(PV+BESS)
Business Proposal Document Number
EMI027_232_B01006_R02
Year of
No. Title of Assignment Client
Execution
11 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 9 MW Halmahera Solar PV Hybrid Power Plant
(PV+BESS)
12 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 7 MW Tual Solar PV Hybrid Power Plant (PV+BESS)
13 Land Acquisition for Ambon 10 Solar PV Hybrid Power Private IPP 2020
Plant (PV+BESS)
14 Land Acquisition for Halmahera 9 Solar PV Hybrid Power Private IPP 2020
Plant (PV+BESS)
15 Site Selection and Grid Impact Study for 20 MW Private IPP 2020
Merauke Solar PV Hybrid Power Plant (PV+BESS)
16 Site Selection and Grid Impact Study for 20 MW Private IPP 2020
Jayapura Solar PV Hybrid Power Plant (PV+BESS)
17 Pre-Feasibility Study and Grid Impact Study for 100 MW Private IPP 2020
Belitung Solar PV Power Plant
Business Proposal Document Number
EMI027_232_B01006_R02
Year of
No. Title of Assignment Client
Execution
18 Development of Design Guideline of Photovoltaic Hybrid GIZ 2020
Power Plant for Island Grid
EMI027_232_B01006_R02
Year of
No. Title of Assignment Client
Execution
• 90 MW Singkarak Solar PV Floating Power Plant
• 100 MW Lampung Solar PV + BESS Power Plant
24 Feasibility Study, Grid Impact Study, Front End PT 2021
Engineering Design, and Asessment for Pertamina Solar Pertamina
PV Rooftop Projects – Multiple Locations Power
Indonesia
25 Feasibility Study for Biomass-Biogas Cofiring for 10 Palm PT 2021
Oil Factory in Sumatera and Pekanbaru Pertamina
Power
Indonesia
26 Owner Engineer for 26 MW Solar PV Hybrid Power Plant Private IPP 2021
(PV-BESS) in 3 Locations in Maluku – Detailed
Engineering Design (DED), Tender Document Package
and Due Diligence, Environmental-Social Impact
Analysis, and Construction Supervision
27 Grid Impact Study for 7 MWp Solar PV Hybrid Power Private IPP 2021
Plant (PV-BESS) in Morotai
28 Feasibility Study and Grid Impact Study for 5 MW Solar PT PJB- 2021
PV Hybrid Power Plant (PV-BESS-GE) in Bawean Reconsult
Indonesia
Business Proposal Document Number
EMI027_232_B01006_R02
Year of
No. Title of Assignment Client
Execution
29 Strategic Business Consultant for Solar PV Power Plant PT Semen 2021
Projects in 3 Locations Basic Design, Power Rental Indonesia
Agreement Tender Document Package and Due Group
Diligence, and Technical-Commercial-Legal Advisory
Services
30 Feasibility Study, Grid Impact Study, and Fron- End PT 2022-
Engineering Design for Pertamina Solar PV and Hybrid Pertamina Present
Power Plant Projects – Multiple Locations Power
Indonesia
EMI027_232_B01006_R02
Nationality Indonesia
English
Nationality Indonesia
Professional -
Certifications
Nationality Indonesia
English
Nationality Indonesia
English
• IELTS : 7.0
• TOEFL ITP : 557
Education/ • Institut Teknologi Sepuluh Nopember (ITS), Indonesia, 2016, Bachelor
Qualifications Degree of Electrical Engineering
Nationality Indonesia
No. Description Qty Unit Unit Price (Rp) Price Total (Rp)
1 Site Survey and Data Collection (if needed) 1 Lot 29,230,000 29,230,000
2 Grid Impact Study 1 Lot 114,240,000 114,240,000
a System Modeling
b Protection, Flicker, and Harmonic Analysis
c Load Flow Analysis
d Short - Circuit Analysis
e Transient Stability Simulations
f Grid Code Compliance Study
Total 143,470,000
PPN 11% 15,781,700
Grand Total 159,251,700
QUOTATION
Attention : PT Empat Mitra Indika Tenaga Surya Project Name : Grid Impact Study (GIS) for 7MWp Solar
(EMITS) PV Power Plant at SBI Tuban
Mitra Terrace, Jl. Gatot Subroto
No.Kav.21, RT.2/RW.2, Setiabudi, Kota Quotation No. : EMI027/232/B01006/R02
Jakarta Selatan, DKI Jakarta 12930 Date : March 8, 2023
Attention : Irfan Makmur Validity : 30 Calendar Days
Email : Irfan.Makmur@emits.id Sales Name : Septya Ika Sari
Telephone : +62 859-2155-8487
Notes
Price : Price Nett in IDR and Full Amount / Nett of any bank charge.
Delivery Time : refer to Technical Proposal
Revision Guarantee : 30 Calendar Days after the 1st Draft Report is submitted
Terms of Payment : 30% as Down Payment (DP)
50% after 1st Draft Report is submitted to the Client
20% after Final Report is submitted to the Client
Additional Clause : - Site Survey & Data Collection are optional
- The required data/documents will be provided by the Client
- Exclude any meeting(s)/negotiation to PLN regarding the Grid Impact Study approval
- Interconnection Point Determination (not necessary because the point of connection already exists)
- Special Facility Study (not necessary because in this case the interconnection is with the internal SIG,
while the Special Facility Study applies to IPPs where the interconnection facilities will be handed over
to PLN)
We believe that our offer suits your requirement and we are looking forward to your favorable reply.