Grid Impact Study (GIS) for 7 MWp
Solar PV Power Plant at SBI Tuban

EMI027/232/B01006/R02
This page is intentionally left blank
Business Proposal Document Number

EMI027_232_B01006_R02

Page : i Rev : R00

PT Synkrona Business PT Empat Mitra


Enjiniring Indika Tenaga
Nusantara Proposal Surya (EMITS)

Grid Impact Study (GIS) for 7 MWp


Solar PV Power Plant at SBI Tuban

Date Made by Checked by Approved by Rev. Status

23-02-03 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R00 Approved
23-03-03 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R01 Approved
23-03-08 Septya Ika Sari Dicky Pranadias Fajar Sastrowijoyo R02 Approved
Business Proposal Document Number

EMI027_232_B01006_R02

Page : ii Rev : R00

TABLE OF CONTENTS
TABLE OF CONTENTS .............................................................................................................................................. ii

EXECUTIVE SUMMARY ............................................................................................................................................ 3

I. Company Profile ............................................................................................................................................. 4

A. Organization Information .......................................................................................................................... 4

B. Relevant Project Experience ...................................................................................................................... 5

C. Key Personnel ............................................................................................................................................ 6

II. Technical Approach ........................................................................................................................................ 8

A. Scope of Work ........................................................................................................................................... 8

B. Methodology and Approach ...................................................................................................................... 9

C. Timeline ................................................................................................................................................... 12

III. Financial Proposal .................................................................................................................................... 14

IV. Conclusion ............................................................................................................................................... 15

Appendix I – Project experiences ......................................................................................................................... 16

Appendix II – Curriculum vitae ............................................................................................................................. 22

Appendix III – Financial Proposal .......................................................................................................................... 31


Business Proposal Document Number

EMI027_232_B01006_R02

Page : 3 Rev : R00

EXECUTIVE SUMMARY
PT Empat Mitra Indika Tenaga Surya (hereinafter “Emits”), is a Joint Venture Company to
participate in realizing Indonesia’s enormous potential in Solar PV with support from its founding
companies – Indika Energy Tbk. (Indika) and Fourth Partner Energy Limited (FPEL). Currently,
Emits, wants to conduct Grid Impact Study (GIS) for 7 MWp Solar PV Power Plant at SBI Tuban.
Emits need a consultant to conduct this project.

PT Synkrona Enjiniring Nusantara (hereinafter “Synkrona”), as an invited engineering and project


management consulting company, is offering to be the consultant for those services. The technical
and financial approaches to conduct the services are described in the proposal. The details of the
technical approach that we proposed are described in II. Technical Approach. The financial
proposal is described in III. Financial Proposal.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 4 Rev : R00

I. COMPANY PROFILE
A. Organization Information
Synkrona is pleased to present herewith credentials and capabilities towards fulfilling the
requirements under the Scope of Work and meeting the objectives of the proposed. Below is
the detailed company information:
a. Official Registered Title : PT Synkrona Enjiniring Nusantara
b. Type of Business : Private Company
c. Address : Tifa Arum Realty 5th Floor, Jl. Kuningan Bar. 1 No.26,
RT.6/RW.1, Kuningan Bar., Kec. Mampang Prpt., Kota
Jakarta Selatan, DKI Jakarta, Indonesia 12710
d. Telephone/Fax : +62 21 290-23131
Synkrona is a leading professional consulting company focused on energy and engineering
services. Our expertise includes engineering design, study, power system analysis, and other
engineering services.

Synkrona has vast and exhaustive experiences from various challenging projects in Indonesia.
Our main concern is to provide a thorough and comprehensive engineering process, detailed
analysis and careful planning, and accuracy in every work. The short-term goal of our solution
is to minimize the client’s losses and optimize energy costs while the long-term goal is to
reduce global warming for greener and cooler environments.

Synkrona is a dedicated partner to accompany clients to make great decisions on their strategy
and organization. Below are the services that Synkrona provide:
1. General Consultancy and Engineering Services;
2. Front End Engineering Design (FEED);
3. Detailed Engineering Design (DED);
4. Feasibility Study (Pre-FS) and Feasibility Study (FS);
5. Pre-Grid Impact Study (Pre-GIS) and Grid Impact Study (GIS); and
6. Project Management Consulting (PMC) or Owner Engineer (OE)
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 5 Rev : R00

B. Relevant Project Experience


Synkrona achieved such performance by winning various projects from both the private and
government sectors. Synkrona’s recent and relevant experience will help lead to a successful
project that meets all objectives. Listed below are Synkrona’s key reference projects that apply
to this project.

Table I - 1 Relevant Project Experience

Year of
Title of Assignment Client
Execution
Grid Facility Study Wind Power Plant in Sulawesi Private IPP 2018

Site Selection, Feasibility Study, and Grid Impact Study for Private IPP 2019
2x10 MW Solar PV Hybrid Power Plant (PV+BESS) in East
Kalimantan

Pre-Feasibility Study and Grid Impact Study for 100 MW Private IPP 2020
Belitung Solar PV Power Plant

Grid Impact Study for 7 MWp Solar PV Hybrid Power Plant Private IPP 2021
(PV-BESS) in Morotai

Feasibility Study, Grid Impact Study, and Fron- End PT 2022-


Engineering Design for Pertamina Solar PV and Hybrid Power Pertamina Present
Plant Projects – Multiple Locations Power
Indonesia

Appendix I - Project Experience, shows more detail about Synkrona’s project experience.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 6 Rev : R00

C. Key Personnel
Key Personnel who will work on these projects are listed below.

Table I - 2 Key Personnel

No. Personnel Detail Information

1 Education and Background

• Bachelor, Electrical Engineering, Bandung Institute of


Technology, Indonesia, 2009.
• Master, Electrical Engineering, Chungbuk National
University, South Korea, 2012.

Years of Experience:
Fajar Sastrowijoyo,
• 11 years
S.T., M.Eng.
Position:

• Advisor
2 Education and Background
• Bachelor, Industrial Engineering, Universitas Gajah Mada
(UGM), 2007
Years of Experience:

• 13 years
Dicky Pranadias, S.T. Position:

• Project Director
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 7 Rev : R00

No. Personnel Detail Information

3 Education and Background

• Bachelor, Electrical and Electronics Engineering, Bandung


Institute of Technology (ITB), Indonesia, 2011

• Master, Electrical Engineering, Khalifa University, UAE,


2016
Years of Experience:
Yoga Sandi Perdana,
S.T., M.Sc. • 5 years
Position:

• Engineering Manager
4 Education and Background
• Bachelor, Electrical Engineering, Sepuluh Nopember
Institute of Technology (ITS), Indonesia, 2019
Years of Experience:

• 5 years
Position:

Khalid Abri, S.T. Project Manager

5 Education and Background


• Bachelor, Electrical Engineering, Sepuluh Nopember
Institute of Technology (ITS), Indonesia, 2018

• Master, Electrical Engineering, Bandung Institute of


Technology (ITB), Indonesia, 2021
Years of Experience:
• 5 years
Andriaziz Dahono,
Position:
S.T., M.Sc.
Power System Engineer

Appendix II - Curriculum Vitae shows more detail about the competency and experience of the
key personnel.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 8 Rev : R00

II. TECHNICAL APPROACH


A. Scope of Work
The Scope of Work and Deliverables for the project are listed below:

Table II - 1 Scope of Work

No. Scope of Work Remarks


1 Site Survey and Data Collection [Optional Service]
Synkrona will conduct a site survey
and data collection if the required
data/document is not completely
provided by the Client

2 System Modeling -
Exc. any meeting(s)/negotiation to
3 Grid Impact Study PLN regarding the Grid Impact Study
approval

a. Load Flow Analysis -

b. Short Circuit Analysis -

c. Harmonics & Flicker Analysis -

d. Transient Analysis -

e. Protection Analysis -

4 Grid Code Compliance -

5 Negative Impact Mitigation -


Business Proposal Document Number

EMI027_232_B01006_R02

Page : 9 Rev : R00

B. Methodology and Approach

Site Survey & Data


Collection (if required)
or
Data Gathering

System Modeling

Grid Impact Study:

1. Load Flow Analysis


2. Short Circuit Analysis
3. Harmonics & Flicker Analysis
4. Transient Analysis
5. Protection Analysis

No
Negative Impact Grid Code Compliance
Mitigation Strategy Study

Yes

Reporting to the Client

Figure II - 1 Work Flow

The detailed work plan and methodology to conduct this study are described as follows:
1. Site Survey and Data Collection (Optional Service)
If the Client can’t provide the required data for this project, Synkrona will conduct a
site survey to collect the data needed for the study.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 10 Rev : R00

2. System Modeling
Synkrona will conduct a system modeling based on the data gathered, using DIgSilent
Power Factory software. In case several data are not available, the consultant will use
reasonable assumptions based on similar or typical data from the consultant
database.

3. System Modeling
In this Project, Synkrona will conduct simulations for the following:

a. Load flow analysis


b. Short circuit analysis
c. Harmonics & Flicker analysis
d. Transient analysis
e. Protection analysis

Table II - 2 Grid Impact Study Simulation

No. Activity Goal Technical Approach


Observe any voltage violation
Analyze power system
and distribution/transmission
1 Load Flow operation at steady state
line overloading after PV
condition
Interconnection
Ensure that the short circuit
Analyze short circuit after PV interconnection do not
2 Short Circuit
current during a fault exceed the equipment-breaking
capacity
Analyze the power Verify that the harmonics
quality regarding to distortion after PV
3 Harmonics
current and voltage interconnection is not exceeding
parameter the regulated limits
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 11 Rev : R00

No. Activity Goal Technical Approach


Analyze system dynamic Examine the grid frequency if
Transient response when there is a the PV power dispatch drops
4
Stability change in system from 100% to 10% (extreme
operating conditions condition)
Observe how the protection
Protection Analyze protection relay
5 works, considering the the
Coordination response during a fault
existing relays.

The result of the simulation will be analyzed to verify the state of the system after PV
interconnection. Synkrona will analyze the new system according to the related IEC,
IEEE, and SPLN standards.

4. Grid Code Compliance Study


The results of the Load Flow, Short Circuit, Harmonics, Flicker, Transient, and
Protection analyses will be validated for compliance with the applicable Grid Code,
including identifying the issues found during the interconnection.

5. Negative Impact Mitigation Strategy


Should any nonconformity to grid code or negative impact occur, Synkrona will
recommend solutions to mitigate the problem arise.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 12 Rev : R00

C. Timeline
The timeline of the project that Synkrona proposed is presented below:
1. Optional 1 - If the Site Survey & Data Collection are not required
Table II - 3 Project Timeline Optional 1

Project Timeline Week


No. Item 1 2 3 4 5 6 7 8 9
1 Work Order (WO) is released a
2 Kick-Off Meeting a
3 Complete Data/Documents are received by Synkrona a a
4 Simulation, Analysis, and Reporting a a a a a
5 1st Draft Report is Submitted a
6 Feedback and Revision a a
7 Final Report is Submitted a
Notes:
a : Office Works

Notes on the project timeline:


a. Work will commence after Work Order (WO) is released.
b. The 1st Draft Report will be submitted 42 Calendar Days after the complete
data/document is received by Synkrona.
c. The Final Report will be submitted 7 Calendar Days after feedback from the client
is received.
d. The timeline might be changed depending on the data available from the Client.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 13 Rev : R00

2. Optional 1 - If the Site Survey & Data Collection are required


Table II - 4 Project Timeline Optional 2

Project Timeline Week


No. Item 1 2 3 4 5 6 7 8 9
1 Work Order (WO) is released a
2 Kick-Off Meeting a
3 Site Survey & Data Collection b
4 Simulation, Analysis, and Reporting a a a a a
5 1st Draft Report is Submitted a
6 Feedback and Revision a a
7 Final Report is Submitted a
Notes:
a : Office Works
b : Field Works

Notes on the project timeline:


a. Work will commence after Work Order (WO) is released.
b. The 1st Draft Report will be submitted 42 Calendar Days after the site survey is
finished.
c. The Final Report will be submitted 7 Calendar Days after feedback from the client is
received.
d. The timeline might be changed depending on the site survey schedule and data
availability from the Client.
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 14 Rev : R00

III. FINANCIAL PROPOSAL


(Attached in appendix III)
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 15 Rev : R00

IV. CONCLUSION
With extensive experience in delivering excellent products to our previous clients and competent
team members, Synkrona is capable to deliver a Grid Impact Study (GIS) for 7 MWp Solar PV Power
Plant at SBI Tuban. We believe that we can provide the best consulting services to meet Emits's
needs.

Dicky Pranadias
Director
PT Synkrona Enjiniring Nusantara
Tifa Arum Realty 5th Floor, Jl. Kuningan Bar. 1 No.26, RT.6/RW.1,
Kuningan Bar., Kec. Mampang Prpt., Kota Jakarta Selatan,
DKI Jakarta, Indonesia 12710
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 16 Rev : R00

APPENDIX I – PROJECT EXPERIENCES


Business Proposal Document Number

EMI027_232_B01006_R02

Page : 17 Rev : R00

Listed below, shows more detail about Synkrona’s project experience:

Year of
No. Title of Assignment Client
Execution
1 Feasibility Study, Grid Impact Study, and Detailed ESDM 2016
Engineering Design (DED) for Manokwari 2 MWp Solar Ministry
PV Power Plant
2 Grid Impact Study for Waingapu 1 MW Wind Power WHyPGen, 2016
Plant UNDP

3 Feasibility Study, Grid Impact Study, and Front-End PT. ITM 2017
Engineering Design (FEED) for Solar PV Hybrid Power Banpu
Plant (PV+DPP)
4 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2017
for Solar PV Hybrid Power Plant (PV+BESS+DPP) in Nusa
Tenggara Timur (8 Site) and Nusa Tenggara Barat (5 site)
5 Grid Facility Study Wind Power Plant in Sulawesi Private IPP 2018
6 Grid Impact Study and Capacity Planning for Tidal Power Private IPP 2018
Plant in Sumatera
7 Grid Impact Study for 20 MW Hydro Power Plant in Private IPP 2019
Sumatera Selatan
8 Site Selection, Feasibility Study, and Grid Impact Study Private IPP 2019
for 4x10 MW Solar PV Hybrid Power Plant (PV+BESS) in
West Kalimantan
9 Site Selection, Feasibility Study, and Grid Impact Study Private IPP 2019
for 2x10 MW Solar PV Hybrid Power Plant (PV+BESS) in
East Kalimantan
10 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 10 MW Ambon Solar PV Hybrid Power Plant
(PV+BESS)
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 18 Rev : R00

Year of
No. Title of Assignment Client
Execution
11 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 9 MW Halmahera Solar PV Hybrid Power Plant
(PV+BESS)
12 Site Selection, Feasibility Study and Grid Impact Study Private IPP 2019
for 7 MW Tual Solar PV Hybrid Power Plant (PV+BESS)

13 Land Acquisition for Ambon 10 Solar PV Hybrid Power Private IPP 2020
Plant (PV+BESS)
14 Land Acquisition for Halmahera 9 Solar PV Hybrid Power Private IPP 2020
Plant (PV+BESS)
15 Site Selection and Grid Impact Study for 20 MW Private IPP 2020
Merauke Solar PV Hybrid Power Plant (PV+BESS)
16 Site Selection and Grid Impact Study for 20 MW Private IPP 2020
Jayapura Solar PV Hybrid Power Plant (PV+BESS)
17 Pre-Feasibility Study and Grid Impact Study for 100 MW Private IPP 2020
Belitung Solar PV Power Plant
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 19 Rev : R00

Year of
No. Title of Assignment Client
Execution
18 Development of Design Guideline of Photovoltaic Hybrid GIZ 2020
Power Plant for Island Grid

19 Technical Study Services on Energy Management System Private IPP 2020


(EMS) Technology
20 Pre-Feasibility Study & Technical Advisory Services for 10 Private IPP 2020
MW Bangka Solar PV IPP Tender
21 Feasibility Study and Grid Impact Study for 500 kWp Private IPP 2020
Solar PV Hybrid Power Plant (PV+Biogas Power Plant) in
Batam, Kepulauan Riau

22 Pre-Feasibility Study Sulawesi Solar PV Power Plant Private IPP 2020


23 Pre-Feasibility Study & Technical Advisory Services for Private IPP 2020
Solar PV IPP Tender
• 60 MW Saguling Solar PV Floating Power Plant
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 20 Rev : R00

Year of
No. Title of Assignment Client
Execution
• 90 MW Singkarak Solar PV Floating Power Plant
• 100 MW Lampung Solar PV + BESS Power Plant
24 Feasibility Study, Grid Impact Study, Front End PT 2021
Engineering Design, and Asessment for Pertamina Solar Pertamina
PV Rooftop Projects – Multiple Locations Power
Indonesia
25 Feasibility Study for Biomass-Biogas Cofiring for 10 Palm PT 2021
Oil Factory in Sumatera and Pekanbaru Pertamina
Power
Indonesia

26 Owner Engineer for 26 MW Solar PV Hybrid Power Plant Private IPP 2021
(PV-BESS) in 3 Locations in Maluku – Detailed
Engineering Design (DED), Tender Document Package
and Due Diligence, Environmental-Social Impact
Analysis, and Construction Supervision
27 Grid Impact Study for 7 MWp Solar PV Hybrid Power Private IPP 2021
Plant (PV-BESS) in Morotai
28 Feasibility Study and Grid Impact Study for 5 MW Solar PT PJB- 2021
PV Hybrid Power Plant (PV-BESS-GE) in Bawean Reconsult
Indonesia
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 21 Rev : R00

Year of
No. Title of Assignment Client
Execution
29 Strategic Business Consultant for Solar PV Power Plant PT Semen 2021
Projects in 3 Locations Basic Design, Power Rental Indonesia
Agreement Tender Document Package and Due Group
Diligence, and Technical-Commercial-Legal Advisory
Services
30 Feasibility Study, Grid Impact Study, and Fron- End PT 2022-
Engineering Design for Pertamina Solar PV and Hybrid Pertamina Present
Power Plant Projects – Multiple Locations Power
Indonesia

31 Strategic Business Consultant and Owner Engineer for PT Semen 2022


Semen Baturaja Solar PV Power Plant Project – Baturaja
Feasibility Study, Grid Impact Study, Engineering Design,
Power Purchase Agreement Tender Document Package
and Due Diligence, and Technical-Commercial-Legal
Advisory Services
32 Site Selection and Power System Analysis for Private IPP 2022
Dedieselization Program Cluster Jawa-Madura
Business Proposal Document Number

EMI027_232_B01006_R02

Page : 22 Rev : R00

APPENDIX II – CURRICULUM VITAE


CV of Proposed Key Personnel

Name of Personnel Fajar Sastrowijoyo

Position for this PV Specialist


Assignment

Nationality Indonesia

Language Proficiency Indonesian: Native

English

• TOEIC: 985 (2011)


• TOEFL PBT: 643/677 (2008)
• TOEFL IBT: 106/120 (2013)
Education/ • Institut Teknologi Bandung (ITB), Indonesia, 2009
Qualifications Bachelor Degree in Electrical Engineering
• Chungbuk National University, South Korea, 2012
Master Degree in Electrical Engineering
Professional • Renewable Energy and Micro Grid Focused on the Operation and
Certifications Maintenance of the Intelligent Network, 2016
Virginia Polytechnic Institute and State University, USA
Employment Record/ • March 2009 – April 2010
Experience Software Engineer – Gemalto Pte. LTd.
• May 2012 – May 2017
Research Engineer – LS Industrial Systems
• February 2018 – Present
Advisor – PT Synkrona Enjiniring Nusantara
Relevant Project • Feasibility Study and Detailed Engineering Design for Manokwari 2
Experience MWp Solar PV Power Plant, 2016
• Engineering, Procurement, and Construction for Smart Grid-PV
BPPT, 2016
• Feasibility Study and Front End Engineering Design for Airport PV,
Angkasa Pura I & II, 2017
• Feasibility Study for 13x1 MW Solar PV Power Plant, Nusa
Tenggara Timur and Nusa Tenggara Barat, 2017
• Feasibility Study and Grid Impact Study for 2x10 MW Solar PV
Power Plant, Kalimantan Timur, 2018
• Feasibility Study and Grid Impact Study for 33.5 MW Solar PV
Power Plant, 4 Locations in Kalimantan Barat, 2019
• Grid Impact Study for 100 MW Wind Power Plant Sumatera, 2019
• Grid Impact Study for 7 MW Solar PV Power Plant Nias, 2019
• Development of Design Guideline for Solar PV Power Plant in
Island Grid, 2020
• Engineering, Procurement, and Construction for 160 kW Solar PV
Off-Grid Pulau Semau, 2020
• Engineering, Procurement, and Construction for 200 kW Solar PV-
Diesel Hybrid Pulau Semau, 2020
• Engineering, Procurement, and Construction for 540 kW Solar PV-
Biogas Hybrid Pulau Bulan, 2021
• Grid Impact Study for 540 kW Solar PV-Biogas Hybrid Pulau Bulan,
2021
• Engineering, Procurement, and Construction for 2 MWp Gresik
Solar PV Rooftop Power Plant, On-Going
• Engineering, Procurement, and Construction for 1.5 MWp Gresik
Solar PV Rooftop Power Plant, On-Going
• Feasibility Study, Grid Impact Study, Front End Engineering
Design, Owner Engineer, and Assessment for Solar PV Power
Plants in Pertamina Internal Locations, 2021
• Feasibility Study and Grid Impact Study for 7 MW Solar PV Power
Plant Morotai, On-Going
• Feasibility Study and Grid Impact Study for 2 MW Solar PV Hybrid
Power Plant Bawean, On-Going
• Study of Jawa-Madura-Bali Solar PV Development and Integration,
On-Going
• Tender Document Establishment for Solar PV IPP Tender, PT
Semen Indonesia Group, 2021
• Tender Due Diligence for Solar PV IPP Tender, PT Semen Indonesia
Group, 2021
• Engineering, Procurement, and Construction for 1.34 MW Solar
PV-Hybrid Selayar, 2022
CV of Proposed Key Personnel

Name of Personnel Dicky Pranadias

Position for this Project Manager


Assignment

Nationality Indonesia

Language Proficiency Indonesian: Native

English: Professional Working Level

Education/ • Universitas Gajah Mada (UGM) Indonesia, 2007


Qualifications Bachelor Degree in Industrial Engineering

Professional -
Certifications

Employment Record/ • January 2008 – September 2012


Experience Field Engineer, Baker Hughes
• September 2012 – September 2013
Senior Field Engineer, Baker Hughes
• October 2013 – May 2014
General Field Engineer, Baker Hughes
• May 2014 – May 2016
Service Delivery Coordinator, Baker Hughes
• October 2017 – February 2018
General Field Engineer, Baker Hughes
• February 2018 – August 2020
Service Delivery Coordinator, Baker Hughes
• September 2020 – January 2021
Service Delivery Technical Lead, Baker Hughes
• January 2021 - Present
General Manager – PT Synkrona Enjiniring Nusantara
Relevant Project • Project Manager, Feasibility Study for Development and
Experience Integration of Java-Bali PV System, 2021
• Project Manager, Feasibility Study for 20++ Solar PV Power Plant
in Pertamina Locations, Indonesia, 2021
• Project Manager, Pre-Feasibility Study 7 MWp Solar PV Power
Plant Morotai, North Maluku, 2021
• Project Manager, Grid Imapact Study 7 MWp Solar PV Power Plant
Morotai, North Maluku, 2021
• Project Manager, Owner Engineer 26 MW Solar PV Power Plant in
3 Locations in Maluku, 2021
• Project Manager, Tender Document Establishment for Solar PV
IPP Tender, PT Semen Indonesia Group, 2021
• Project Manager, Tender Due Diligence for Solar PV IPP Tender,
PT Semen Indonesia Group, 2021
• Project Manager, Feasibility Study and Grid Impact Study for 2
MW Solar PV Hybrid Power Plant in Bawean
CV of Proposed Key Personnel

Name of Personnel Yoga Sandi Perdana

Position for this Engineering Manager


Assignment

Nationality Indonesia

Language Proficiency Indonesian: Native

English

• TOEFL IBT: 88/120


Education/ • Institut Teknologi Bandung (ITB), Indonesia, 2011
Qualifications Bachelor Degree of Electrical Engineering
• Khalifa University, UAE, 2016
Master Degree of Electrical Engineering
Professional -
Certifications

Employment Record/ • October 2012 – March 2013


Experience Electrical Engineer, VICO Indonesia
• March 2013 – January 2014
Electrical and Instrument (E&I) Design Engineer, PT. DSME
Indonesia
• February 2017 – December 2017
Electrical Substation Design Leader – PT. Mitratek Bangun
Gemilang
• December 2017 – July 2019
Electrical Project Engineer – EGIS
• July 2019 – April 2021
Railway System Engineer – EGIS
• April 2021 - Present
Engineering Manager – PT Synkrona Enjiniring Nusantara
Relevant Project • Tender Bid Document and BED/DED Preparation for Contract
Experience Package 2, consists of GIS Cangkring Baru, GI Sunyaragi, GI
Majalaya Baru, GI Sumedang Baru, GI Cilamaya, GI Bandung
Selatan II, 2017
• Tender Bid Document and BED/DED Preparation for Contract
Package 1, consists of GI Rancakusuma, GI Majenang, GI Pati, GI
Sukamandi, GI Padalarang, GI Cirata, 2017
• Tender Bid Document and BED/DED Preparation for Contract
Package 4, consists of GI Brebes II, GI Kebasen II, GI Pati II, GI
Majenang II, GI Tambaklorok, 2017
• Tender Bid Document and BED/DED Preparation for Contract
Package 3, consists of GI Cianjur II, GI Cibadak Baru II, GI Tambak
Lorok II, GI Kentungan II, GI Ampel, GI Pandean Lamper II, 2017
• Extension 1x Trafo Bay 70/20kV GI 70kV Waena, 2017
• Construction of 150kV GI Siantan, 2017
• Construction of 150kV GIS Jatiwaringin, 2017
• Bidding Assistance for Ext. 1x Trafo Bay 150/20kV 60MVA GI
Gambir Baru, 2017
• Extension 2x Line Bay 150kV GI Curug and GI Ciledug, 2017
• Add On Grati Power Plant 150 MW – SS Blok 2 (2x Diameter Bay),
2017
• Technical Assistance for LRT Palembang
• Technical Assistance for ADB Revitalizing Informal Settlements
and their Environments (RISE), 2020
• Pre-FS for Bogor Tramway Line-1, 2020
• Pre-FS of MRT Jakarta Phase-4 Southern Corridor, 2020
• Sustainable Urban Mobility Plan for Mebidangro Area, 2020
• PMC for Re-Signalling to Electric of ME-X6 line, 2020
• Feasibility Study for Development and Integration of Java-Bali PV
System, 2021
• Feasibility Study for 20++ Solar PV Power Plant in Pertamina
Locations, Indonesia, 2021
• Feasibility Study and Grid Impact Study for 7 MW Solar PV Power
Plant Morotai, North Maluku, 2021
• Owner Engineer 26 MW Solar PV Power Plant in 3 Locations in
Maluku, 2021
• Feasibility Study, Grid Impact Study, Front End Engineering
Design, Owner Engineer, and Assessment for Solar PV Power
Plants in Pertamina Internal Locations, On-Going
• Tender Document Establishment for Solar PV IPP Tender, PT
Semen Indonesia Group, 2021
• Tender Due Diligence for Solar PV IPP Tender, PT Semen Indonesia
Group, 2021
• Feasibility Study and Grid Impact Study for 2 MW Solar PV Hybrid
Power Plant in Bawean
CV of Proposed Key Personnel

Name of Personnel Khalid Abri

Position for this Project Manager


Assignment

Nationality Indonesia

Language Proficiency Indonesia : Native

English

• IELTS : 7.0
• TOEFL ITP : 557
Education/ • Institut Teknologi Sepuluh Nopember (ITS), Indonesia, 2016, Bachelor
Qualifications Degree of Electrical Engineering

Professional • Project Management Basic, Siemens Learning Center, 2018


Certifications • Contract and Claim Management, Siemens Learning Center, 2019
• Product Management, Udemy, 2019
Employment Record/ • September 2017 – October 2019
Experience Project Engineer, PT Siemens Indonesia
• October 2019 – September 2021
Product Manager, PT Streamer Electric Indonesia
• October 2021 – October 2022
Technical Asset Management (TAM) Business Development,
Aden Indonesia
• October 2022 – Present
Project Manager, PT Synkrona Enjiniring Nusantara
Relevant Project • Pembangunan Gardu Induk (GI) 150 kV Pangkalan Kerinci Ext,
Experience 2017
• Pembangunan Gardu Induk (GI) 150 kV Rengat Ext. 2017
• Pembangunan Gardu Induk (GI) 150 kV KIIC / Margakarya, 2017
• Pembangunan Gardu Induk (150 kV) Cibinong Ext, 2017
• Pembangunan Gas-Insulated Switchgear (GIS) 150 kV Gandaria II,
2018
• Pembangunan Gas-Insulated Switchgear (GIS) 150 kV Kebon Sirih,
2018
• Pembangunan Gas-Insulated Switchgear (GIS) 150 kV Kemayoran
II, 2018
• Special Facilities Riau GFPP 275 MW, 2018
• Pembangunan Gardu Induk (GI) 150 kV Pendopo, 2019
• Jasa Konsultan Studi Potensi dan Pendampingan Untuk Bisnis
PLTS, 2022
CV of Proposed Key Personnel

Name of Personnel Andriazis Dahono

Position for this Power System Engineer


Assignment

Nationality Indonesia

Language Proficiency Indonesian: Native

English: Professional Working Level

Education/ • Institut Teknologi Sepuluh Nopember, Indonesia, 2018


Qualifications Bachelor in Electrical Engineer
• Institut Teknologi Bandung, Indonesia, 2021
Master in Electrical Engineer
Professional -
Certifications

Employment Record/ • Jun 2018 - April 2022


Experience Project Associate, PT. LAPI ITB
• April 2022 - Present
Power System Engineer, PT Synkrona Enjiniring Nusantara
Relevant Project • Power Quality Study PT Krakatau Steel, 2018
Experience • Power Quality Study PT Indo Kordsa, 2019
• Power Quality Study Cilegon Industry Area, 2019
• Synchronous Condenser Study Sulawesi system (PT PLN), 2019
• Power Quality Study PT Pertamina RU IV Cilacap, 2020
• Power Quality Study Oxygen Industry Area, 2021
• Power Quality Study PT Nutrifood Sentul, 2021
• Synchronization and Power Quality Study PT Trans-Pacific
Petrochemical Indotama Tuban, 2021
• Grid Impact Study for 590 kW Solar PV Power Plant PT Mitra
Metal Perkasa, 2022
• Grid Impact Study for 110 kW Solar PV Power Plant PT Hamatetsu
Indonesia, 2022
• Grid Impact Study for 220 kW Solar PV Power Plant PT Data
Center Indonesia Sukses Makmur, 2022
• Grid Impact Study for 13 MW (Biogas Power Plant) and 26 MW
(RDF Power Plant) at Tangerang City, On-Going
• Grid Impact Study for 3.69 MW Solar PV Power Plant PT Chandra
Asri Petrochemical and PT Styrindo Mono Indonesia, On-Going
APPENDIX III – FINANCIAL PROPOSAL
QUOTATION
Attention : PT Empat Mitra Indika Tenaga Surya Project Name : Grid Impact Study (GIS) for 7MWp Solar
(EMITS) PV Power Plant at SBI Tuban
Mitra Terrace, Jl. Gatot Subroto
No.Kav.21, RT.2/RW.2, Setiabudi, Kota Quotation No. : EMI027/232/B01006/R02
Jakarta Selatan, DKI Jakarta 12930 Date : March 8, 2023
Attention : Irfan Makmur Validity : 30 Calendar Days
Email : Irfan.Makmur@emits.id Sales Name : Septya Ika Sari
Telephone : +62 859-2155-8487

No. Description Qty Unit Unit Price (Rp) Price Total (Rp)

1 Site Survey and Data Collection (if needed) 1 Lot 29,230,000 29,230,000
2 Grid Impact Study 1 Lot 114,240,000 114,240,000
a System Modeling
b Protection, Flicker, and Harmonic Analysis
c Load Flow Analysis
d Short - Circuit Analysis
e Transient Stability Simulations
f Grid Code Compliance Study

Total 143,470,000
PPN 11% 15,781,700
Grand Total 159,251,700
QUOTATION
Attention : PT Empat Mitra Indika Tenaga Surya Project Name : Grid Impact Study (GIS) for 7MWp Solar
(EMITS) PV Power Plant at SBI Tuban
Mitra Terrace, Jl. Gatot Subroto
No.Kav.21, RT.2/RW.2, Setiabudi, Kota Quotation No. : EMI027/232/B01006/R02
Jakarta Selatan, DKI Jakarta 12930 Date : March 8, 2023
Attention : Irfan Makmur Validity : 30 Calendar Days
Email : Irfan.Makmur@emits.id Sales Name : Septya Ika Sari
Telephone : +62 859-2155-8487

Notes
Price : Price Nett in IDR and Full Amount / Nett of any bank charge.
Delivery Time : refer to Technical Proposal
Revision Guarantee : 30 Calendar Days after the 1st Draft Report is submitted
Terms of Payment : 30% as Down Payment (DP)
50% after 1st Draft Report is submitted to the Client
20% after Final Report is submitted to the Client
Additional Clause : - Site Survey & Data Collection are optional
- The required data/documents will be provided by the Client
- Exclude any meeting(s)/negotiation to PLN regarding the Grid Impact Study approval
- Interconnection Point Determination (not necessary because the point of connection already exists)
- Special Facility Study (not necessary because in this case the interconnection is with the internal SIG,
while the Special Facility Study applies to IPPs where the interconnection facilities will be handed over
to PLN)

We believe that our offer suits your requirement and we are looking forward to your favorable reply.

Thank you and best regards,

Septya Ika Sari


PT Synkrona Enjiniring Nusantara
+62822-4179-4587
septya.ika@synkrona.co.id