You are on page 1of 1

SAP Knowledge Base Article

1846608 - Warning message CKCC118 in transaction CK40N


Component: CO-PC-PCP (Product Cost Planning), Version: 5, Released On: 03.05.2016

Symptom
Transaction CK40N displays values from another Plant.
Display the material cost estimate and get the Warning message CKCC118 "Costing does not originate with this costing
run".
For a specific Material there is an entry in table KEKO with the costing run ID but when you check in transaction CK40N
the material is not there as it is costed in a different run.

Environment
Controlling (CO)
SAP R/3
SAP R/3 Enterprise 4.7
SAP ERP Central Component
SAP ERP
SAP enhancement package for SAP ERP
SAP enhancement package for SAP ERP, version for SAP HANA

Reproducing the Issue


1. Enter transaction CK40N.
2. Enter the relevant Parameters.
3. Execute the 'Material Overview' step and select a Material.

Cause
When you navigate from the 'Material Overview' in the costing run to a cost estimate, you will see a warning message
CKCC118 saying that the cost estimate has been overwritten meanwhile (by a different costing run). That means that
materials are included in different costing runs with the same key parameters for costing and therefore are overwritten. This
makes the display in the 'Material Overview' invalid.

Resolution
1. You should review your costing process and make sure the Costing runs do not overlap.

Keywords
error message CKCC118, Material overview, CK40N, costing run, CKCC 118

Products
Products

SAP ERP Central Component all versions

SAP ERP all versions

SAP R/3 Enterprise all versions

SAP R/3 all versions

SAP enhancement package for SAP ERP all versions

SAP enhancement package for SAP ERP, version for SAP HANA all versions

You might also like