SHE Specification
Potential Risks related to intended project work:
The following potential risks need to be considered in your risk assessments pertaining to the work
planned at CEOCO:
General:
o Working at heights – Use of ladders & scaffolding
o Hot work – Use of gas welding equipment, grinding / couching.
o Noise
o Lifting equipment – incorrect use / substandard equipment
o Ergonomics – lifting of heavy equipment / material, low structural beams.
Extraction Plant:
o Hazardous substances – Hexane liquid (residue) / gas trapped in pipes /
equipment; LP gas (gas welding equipment). Caustics residue in equipment /
trapped in pipes.
Seed / meal Store:
o Dust – Organic dust has the potential to explode or smoulder resulting in a fire.
Inhalation of dust.
Mitigating Controls:
Personal Protective Equipment: The following PPE is required for work to be conducted on
site and will be specified in the permit to work for which will be issued for each contractor.
o Hard hat
o Cotton overalls
o Safety shoes
o Gloves (related to risk)
o Dust mask FPP2 (meal handling / seed store)
o Hearing protection
o Goggles / face shield (related to risk)
Permit to work: No Contractor may commence with work on site without receiving and
accepting a permit to work. To be obtained from the Engineering Manager.
Induction training: All contractors and their employees must be inducted on the CEOCO
induction programme.
SHE Plans: No contractor will commence with work on site without approval of the
contractors SHE Plan.
Documents:
Documents listed is seen as a minimum and must not be viewed as an exhaustive list as
documents must comply with the Construction Regulations of 2014 and based on contractor risk
assessment.
All SHE Plans must be returned to the CEOCO SHE Department on completion of project work.
Omitting to hand in final SHE plan will result in payment being with held until final SHE plan has
been signed off.