Professional Documents
Culture Documents
RTN+
11 LLVD2 Volt._Li 46 V
3 4 5
ZXDC48 FB100B3 (V1.0) Lithium-iron Battery Quick Installation Guide
By using a back-end PC or the CSU, v erif y that the batteries are in mixed mode.
Clie nt batte ry No. Param eter Default Value
Client signal ACB/fus e
term inal block 1 Equalized Voltage 56.4 V
Sce nario 1: ZTE's new pow er supply (B451 as an exam ple) + 4 intelligent lithium -
+ - iron batte rie s + 1 lead-acid battery
2 Float Voltage 53.5 V
A 3 Chg.Curr.Coeff_Li 0.15C
RTN+
Nxbattery capacity (N: number of number of
4 Battery Cap.-1# (AH)
batteries connected to ACB 1)
A
Battery 1
Battery 2 -48V
busbar
3 Chg.Curr.Coeff_Li 0.1C
8 Volt.Temp.Coeff.
0 mV/Cell/℃
9 LLVD1 Volt._Li 47 V
10 LLVD2 Volt._Li 46 V
6 7 8
ZXDC48 FB100B3 (V1.0) Lithium-iron Battery Quick Installation Guide
Scenario 2: Third-party's power supply + 4 intelligent lithium-iron batteries + 2 reused lead-acid batteries 2.3 Intelligent Lithium-Iron Batteries + Common Lithium-Iron Batteries
Before connecting a lead-acid battery to the ACB in the pow er subrack, By using a back-end PC, verify that the batteries are in mixed mode. The charging
disconnect an inter-battery-core connection bar. current coefficient is 0.1 C by default, w hich can be modified through the CSU.
The voltages for equalization charge and floating charge are the same.
Clie nt batte ry ACB/fus e Scenario 1: Third-party's pow er supply + 4 intellige nt lithium -iron batteries + 1
Clie nt s ignal
com m on lithium -iron battery
te rm inal block
+ - + - Client signal
term inal block
Client battery ACB/fuse
+ - + -
Battery 4
RTN+
PE busbar busbar
Lead-acid battery Lead-acid battery Battery 3
-48 V -48 V
busbar busbar
PE bar
Com m on lithium -iron battery
9 10 11
ZXDC48 FB100B3 (V1.0) Lithium-iron Battery Quick Installation Guide
Battery 4
-48 V -48 V
busbar busbar
Battery 2 -48V
busbar
Battery 2 Battery 4
RTN+
busbar RTN+
busbar Battery 1
Battery 1 Battery 3
No. Parameter Def ault Value