You are on page 1of 9

REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF LABOR AND EMPLOYMENT


REGIONAL OFFICE NO. III
PUBLIC EMPLOYMENT SERVICE OFFICE

SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES)


(RA 7323, as amended by RAs 9547 and 10917)

Name: Cabrera, Jamhire D. Week: 1

WORK DOCUMENTATION

Day 1-5 (July 17-21, 2023)


• MIS/technical support (Work)

Day 1 (July 17)

On our first day, we were referred to Sir Carlo Rey V. Aurelio and had a short
interview. After that, we were handed over to our mentor, Sir Homer Bill Sibal.
We were then taught about the basics of hardware and software computer and
the things that we need to work on in the Management Information System Office
(M.I.S.O).

Day 2 (July 18)


On our second day of work, Sir Homer taught us how to install the softwares
needed after reformatting a unit. He let us do the work on the other units to
practice and to learn more.

Day 3 (July 19)

On our third day, we went to the other offices to check their units. We installed
the necessary software they use to their office, as well as checking if their units
are still running smoothly and are still updated.

Day 4 (July 20)

On our fourth day, Sir Homer taught us how to troubleshoot a unit. We focused
mainly on hardware this day and fixed all the units that were delivered in our
office on that same day.

Day 5 (July 21)

It was a non-working holiday, and the PESO staffs just instructed us to share the
post in Mabalacat City News.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF LABOR AND EMPLOYMENT
REGIONAL OFFICE NO. III
PUBLIC EMPLOYMENT SERVICE OFFICE

SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES)


(RA 7323, as amended by RAs 9547 and 10917)

Name: Cabrera, Jamhire D. Week: 2

WORK DOCUMENTATION

Day 6-10 (July 24-28, 2023)


• MIS/technical support (Work)

Day 6 (July 24)

Gov. Dennis Pineda suspended government offices work because of the bad
weather. Our leader did not instructed us to do any works as PESO Office just
forwarded a message about the suspension of work.

Day 7 (July 25)


On our seventh day of work, no units were delivered in our office. So, we were
just given the task to cut the printed papers and arrange all of them.

Day 8 (July 26)

On our eight day of work, the City Legal Office reported that their internet
connection was down. Together with Sir Homer, we checked the problem and
found out that their wires were damaged. We did the re-cabling and connected
the cables into our server.

Day 9 (July 27)

On our ninth day of work, we did the reformatting of units that were delivered
in our office. We backed up all the necessary files and installed the softwares
needed in their office.

Day 10 (July 28)

Because of the power interruption in the whole Municipality of Mabalacat, we were not
given any task to do in our office. Since our office is all about the computers and
connections. All of the employees were instructed to go home early at 2PM.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF LABOR AND EMPLOYMENT
REGIONAL OFFICE NO. III
PUBLIC EMPLOYMENT SERVICE OFFICE

SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES)


(RA 7323, as amended by RAs 9547 and 10917)

Name: Cabrera, Jamhire D. Week: 3

WORK DOCUMENTATION

Day 11-15 (July 31-August 04, 2023)


• MIS/technical support (Work)

Day 11 (July 31)

On our eleventh day of work, another unit from a different office was brought
into our office. We were tasked to do cleaning and troubleshoot to make the unit
work again.

Day 12 (Aug 1)

On our twelfth day of work, we were given another unit to troubleshoot and fix.
After doing all the works, we were able to make the unit work again.
Day 13 (Aug 2)

On our thirteenth day of work, Sir Anthony helped us in troubleshooting a unit


that was delivered to our office. It had a problem that we have not yet learned
how to fix. Sir Anthony showed us and taught us how to fix that kind of problem
in a unit.

Day 14 (Aug 3)

On our fourteenth day of work, a printer was delivered to our office and we
were instructed to reset and re-activate it. After doing so, we went to the other
office to fix and set up their printer on their computer.

Day 15 (Aug 4)

After helping Sir Roger to fix another printer, a system unit was delivered to our
office, we run some troubleshooting and fixed the unit.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF LABOR AND EMPLOYMENT
REGIONAL OFFICE NO. III
PUBLIC EMPLOYMENT SERVICE OFFICE

SPECIAL PROGRAM FOR EMPLOYMENT OF STUDENTS (SPES)


(RA 7323, as amended by RAs 9547 and 10917)

Name: Cabrera, Jamhire D. Week: 4

WORK DOCUMENTATION

Day 15-20 (August 07-11, 2023)


• MIS/technical support (Work)

Day 16 (Aug 7)

On our sixteenth day of work, a unit with another problem that we are still
unfamiliar of was delivered to our office. But after asking some help from Sir
Anthony we were able to fix the unit while also learning something new.

Day 17 (Aug 8)
On our seventeenth day of work, we were instructed to clean a unit from the
PESO Office and run some troubleshooting. We were able to make it run again
but it had another problem which resulted to it not working again. We left the
unit unplugged and kept in for a while.

Day 18 (Aug 9)

On our eighteenth day of work, we were given a task to fix a unit that shows no
signal when it is plugged in a monitor. We failed in trying to fix the unit as it had
more problem aside from that. We also accompanied Sir Homer on site to inspect
and make a plan on how to lay the internet cables.

Day 19 (Aug 10)

On our nineteenth day of work, as seen from the pictures above, we were having
a hard time on trying to make the unit from yesterday to work again. But after
asking for help from our mentors, we were able to make it run again.

Day 20 (Aug 11)


On our last day of work, we were not instructed to do any task. As there were
not any units delivered that day. We did celebrate our last day with our
mentors/officemates by bringing food for our lunch.

You might also like