FEASIBILITY SUTDY REPORT

I. LOCATION DETAILS:

Type of the Project Solar PV-Battery Hybrid System

Date of Survey

Name of the Building

Name of the Sub- Block

(if required, mention)

Address of the Building

Latitude and Longitude

II. ENERGY BILL DETAILS:

TANGEDCO Service

Connection Number

Sanctioned load

Tariff

Monthly Energy Consumption

Annual Energy Consumption


III. TECHNICAL DETAILS:

Available Shadow free area

(in Sq.m)

Type of the Roof

(RCC, asbestos or any other)

Grid availability (in %)

Load details (Should be submitted as annexure)

Mandate loads required for (Should be submitted as annexure)

Power backup

Diesel Generator details

Recommended Solar PV
capacity (in kW)
Recommended capacity for
Power backup (in kW)