Electrical work
Total 84,560.00
BOQ
A ELECTRICAL WORK
4 Supply and Installation of Power points 1x15Amps with PVC conduiting and cabling 19 Nos 4,560.00
1 Supply and installation of Decorative Light points with conduiting and cabling (Light fittings excluded) 7 Nos 1,260.00
2 Supply and installation of Ceiling Light points with conduiting and cabling (Light fittings excluded) 28 Nos 4,200.00
3 Supply and installation of Spot Light points with conduiting and cabling (Light fittings excluded) 24 Nos 3,600.00
4 Supply and installation of Point Light points with conduiting and cabling (Light fittings excluded) 16 Nos 2,400.00
5 Supply and installation of Hanging Light points with conduiting and cabling (Light fittings excluded) 53 Nos 8,000.00
6 Supply and installation of FCU, s with conduiting and cabling (Fitting excluded) 5 Nos 2000
7 Supply and installation of Water Heater with Conduiting and Cabling (Heater excluded) 2 Nos 800
8 Supply and installation of Linear Light points with conduiting and cabling (Light fittings excluded) 1 Nos 150.00
Page 1 of
PAYMENT TERMS:
1. 30% advance along with confirmed LPO
2. 30% Progressive
3. 30% Progressive
4. 10% after completion and handing over
EXCLUSIONS:
1.Anything not quoted above.
2.DEWA Approval
3. Cable try
Any passes / work permit required in the site shall be arranged by you at your cost
VALIDITY
Our offer is valid for 30 days from the date of this letter and shall be subject to re-confirmation
thereafter
For,
TAZ Technical Services LLC
ASHLY FATHIMA N
Estimation Dpt.