B SERVICES

B1 ELECTRICAL WORKS
HT Works

a HT Works 23,444,314.00 27.54

LT Works.

b LT cable and cable trays 53,000,000.00 62.26


c Electrical panel boards. 58,000,000.00 68.14

d Earthing 6,384,000.00 7.50

e Lightning Protection. 785,000.00 0.92

f Common Area lighting 10,640,000.00 12.50

g External lighting 11,916,870.00 14.00

h Miscellaneous 2,128,012.00 2.50

i Inverter and UPS 500,000.00 0.59


j Liasoning Charges 3,500,000.00 4.11

SUB TOTAL FOR ELECTRICAL WORKS 170,298,196.00 200.07


B2 PLUMBING WORKS
Internal Sanitary Fixtures & C.P. 7,861,000.00
a Fittings 9.24

Internal & External Water Supply 8,743,950.00


b 10.27

Internal & External Drainage 14,470,000.00


c System 17.00
Rain Water Piping 11,485,000.00
d 13.49
Pumps and Accessories 6,384,000.00
e 7.50
SUB TOTAL FOR PLUMBING WORKS 48,943,950.00 57.50
B3 FIRE FIGHTING WORKS
a Fire Pump room & Equipments 7,000,000.00
8.22

Hydrant system 8,250,000.00


b 9.69
c Sprinkler 21,433,425.00 25.18
d Fire alarm and public address 11,500,000.00 13.51
e Fire Extinguishers 3,404,820.00 4.00
f Safety Signages 1,276,800.00 1.50
SUB TOTAL FOR FIREFIGHTING WORKS 52,865,045.00 62.11
B4 HVAC 225,000,000.00 264.33

SUB TOTAL FOR HVAC 225,000,000.00 264.33

BASEMENT & STP VENTILATION


B5 AND STAIR CASE 19,424,000.00 22.82
PRESURISATION.

SUB TOTAL FOR BASENT /STP & 19,424,000.00 22.82


STAIRCASE PRESSURISATION.

B6 BMS 5,500,000.00 6.46

SUB TOTAL FOR BMS 5,500,000.00 6.46

B5 LIFTS 48,800,000.00 57.33

Escalators 8,800,000.00
SUB TOTAL FOR LIFTS 57,600,000.00 57.33
B6 CCTV 1,620,164.44 1.90

SUB TOTAL FOR CCTV 1,620,164.44 1.90

B7 DG Sets 164,416,610.00 193.16

SUB TOTAL FOR DG SETS 164,416,610.00 193.16

B8 HSD Tank. 8,811,900.00 10.35


SUB TOTAL FOR HSD TANK 8,811,900.00 10.35
We assumed 8.82VA/Sft wrt BUA to arrive the
Total required power for the project.
* Based on the above, the total maximum demand
shall be7500 KVA, hence we considered 3No.of
2000 KVA & 1 No.of 1600KVA to meet the
requirement.
* Apart from the above, we considered the
followings equipments as per BESCOM standards &
requirment.
- 1 No. of RMU comprising 2 Nos of LBS as
incomers and 1 No. VCB as out going.
- 1 No. of HT Panel comprising 1 No. of VCB as
incomer and 4 Nos. of VCB as out goings.
- 8 Nos of plate earthings / required length of
copper earthings and 14 Nos of pipe earthing
/required length of GI earthing strips.
- Chain link fencing, safety items.
Considered Make:
*Transformer : Voltamps
* RMU : ABB
* HT Panel : Load controls

We considered LT cables/Cable trays/Cable


terminations for the following equipments:
- From LT Kiosk to Main LT panel,
- From Main LT Panel to Capacitor Panel
- From main LT panel to Utility panel
- From Main LT Panel to HVAC Panel,
- From Utility panel to PHE Panel.
- From Utility panel to Lift Panels.
Considered Make:
* Cables : Polycab
* Cable Trays : Profab
We Considered the following panels
* Main LT Panel
* Capacitor Panel
* Utilty panel
* Lift Panels.
* Bus duct from LT kisok to Main LT Panel
* From D.G.Panel to Main D.G.supply panel
* Rising mains.
Considered Make:
* Panel boards: Load controls, VV System
*Rising mains: C&S, L&T

We considered GI pipe earthing for all LT


equipments

We considered early streamer lightning protection.


* Considered point & power wiring for basement
area lighting, Common area lighting, lift shaft
wiring
* DBs for the above lighting.
* LED light fixtures for the above.
Considered make:
* Wires: Polycab, Rajnigand
* Switches : legrand Myrius
* DB's : Legrand.
* PVC pipe : VIP National.

* Considered required number of street lights, Post


top lanterns, Land scape lights, Fascade
lighting etc.
* The cost which includes DBs, LED light fixtures
also.

Which includes the cost of hume pipes, GI pipes,


Safety items, Fabricated steel

We considered 2 Nos of 10 KVA+ 3 Nos of 5 KVA


inverter for Emergency lighting for basement,
common area and Stair case lighting.
Considered make: Eaton.
Liasoning charges which includes preparation of all
shop drawings, submitting and getting approval
from Electrical Inspectorate, submitting of
completion certificates and arranging inspection,
getting sanction and energization certificates from
Electrical Inspectorate & BESCOM, obtaining
power allocation & power connection etc. for
commissioning of the whole installation in the
premises.

Considered Hindware Sanitary Fixtures and Jaquar


C.P. Fittings

Considered CPVC Pipe for Water Supply up till 50


mm dia. And UPVC SCH 80 above 50 MM dia. Pipe.

Considered SWR PVC Pressure Pipes.


Considered SWR PVC Pressure Pipes, and ground
water recharge pits.
Considered Gravity based water supply System of
Grundfos Make

Considered 2 nos of 2850 lpm electricaly driven


pumps and 1 no. of diesel engine driven pump
andd 2 nos. of 180 lpm jockey pump
Considered seven number of FHC at each floor and
Yard Hydrants.
Considered sprinklers at all floors.
Considered addressable Fire Alarm System.
*We have Considered 2 Nos. of 900 TR +1 No.of
700TR water cooled Chiller as working and 1 No.of
900TR as stand by Chiller.
* The total cost which includes associated HVAC
works like AHUs, Ducting and piping.
* Cabling from HVAC panel to All AHUS & Chiller
panels.
* HVAC Panels, AHU panels
* We have considered high side HVAC works only.

We have considered Bsement ventilation and


ventilation for STP & Staircase pressurisation.

Cost which includes for BMS system for the


following items:
* Monitoring & controlling of HVAC system
* Automatic billing system for Electrical power
consumtion
* Monitoring of other services like Electrical,Fire
fighting & Fire Alarm system, security system, PHE,
Lifts, Generators,

We have considered the followings :


* 6Nos of 24 passenger capacity lifts and thease
lifts are having 2.5 mps, 15 Stops, MRL Lifts,
Stainless steel Finisings
* 1 Nos of Service lifts of Capacity 1600 Kgs and
thease lifts are having 2.5 mps, 15 Stops, MRL Lift,
Stainless steel Finisings
*1 Nos of Service lifts of Capacity 2500Kgs and
thease lifts are having 2.5 mps, 15 Stops, MRL Lift,
Stainless steel Finisings
Make Considered : Mitsubishi.

Provisional
We have considered the followings to arrive the
costing:
* 4 Nos of NVR- 16 channel
* 58 Nos of IR DOMEcameras - Indoor
* 2 Nos of PTZ Cameras - Out door.
Cabling
* Make : Hikvision.

* We considered 4 Nos( 3 W+ 1 Standby) of


2000KVA + 1x1500 KVA D.G.setS with Sync Panel
* The of D.G.set works which includes Exhaust
piping, Control Cabling, Liasoning works.
Considered Make:
* Engine : Caterpiller
* Alternator : Stamford.

Considered 1 No of 50 KL Tank with all required


equpments and accesseries.
SL NO DESCRIPTION VENDOR DETAIL
1 Water Proofing Works
2 Flooring & Dado Works.
3 Painting works
4 Doors
5 Railing works
6 Façade works Balakrishna
7 False Ceiling Works
8 Driveway works
9 Mechanised Parking system
10 Softscape and Hardscape works
11 Infrastructure works for landscape
12 Signages
13 Rainwater Harvesting
14 Garbage disposal
15 STP
16 WTP
17 HT Works
18 LT cable and cable trays
19 Electrical panel boards.
20 Earthing
21 Lightning Protection.
22 Inverter and UPS
23 Internal Sanitary Fixtures & C.P. Fittings
24 Internal & External Drainage System
25 Rain Water Piping
26 Fire Pump room & Equipments
27 Hydrant system
28 Sprinkler
29 Fire alarm and public address
30 Fire Extinguishers
31 Safety Signages
32 HVAC
33 BASEMENT & STP VENTILATION AND STAIR CASE PRESURISATION.
34 BMS
35 LIFTS
36 Escalators
37 CCTV
38 DG Sets
39 HSD Tank.
40 FIRE PROTCETION SYSTEM
41 ELECTRICAL FITTINGS
42 SWITCH BOARDS
43 PHE PANEL
44 CHILLERS
45 PHE
46 CANOPY WORKS
47 AHU WALL ACCOUSTICS
48 SIGNAGES