Feasibility Study
TAL Mini/Modular Petroleum Refinery Project at Pyapon, Myanmar
Phases:
1. Feasibility study facility construction
2. Construction project
3. Agreement, approval of the project
4. Design, construction equipment (equipment of all refinery complex)
5. Construction works
6. Installation of equipment (commissioning, the output mode)
7. Operation
Artist impression on Mini/Modular Refinery Complex
Mini-refinery is an industrial enterprise, whose main function is the processing of crude oil (up to 1 million tons of crude
per year) in gasoline, diesel fuel, fuel oil
1. Initial Data
Purpose of investment
Rationale for the construction of the facility
Funding/Sponsor/Financing schemes
Economic benefit expected from the operation of the facility
Place of implementation/project site/location (crude, complex and petrol stations)
Expected sources of crude oils
Type of crude oil by products
Production capability and requirement
Market size
Transportation
Government legislation and etc.
2. Market Evaluation
Evaluation of existing, long-term demand for oil products intended for production
Analysis of the current state of the industry and the socioeconomic needs of the facility
Assessment of commercial risks
3. Power Enterprise
Rationale for the selection policy of sales
Analysis of existing objects in the industry
Development of sales promotions products, nomenclature, primary production and by-products.
7. Transportation
Rationale for the choice of options of transport schemes, infra-ways, highways and etc.
8. Engineering systems
Selection decisions on energy saving, heat, water, sewage and others
10. Institutional
Information on all participants of the project, their functions and management structure with an estimate of the
financial costs