Feasibility Study
TAL Mini/Modular Petroleum Refinery Project at Pyapon, Myanmar
Phases:
1. Feasibility study facility construction
2. Construction project
3. Agreement, approval of the project
4. Design, construction equipment (equipment of all refinery complex)
5. Construction works
6. Installation of equipment (commissioning, the output mode)
7. Operation
Artist impression on Mini/Modular Refinery Complex

Mini-refinery is an industrial enterprise, whose main function is the processing of crude oil (up to 1 million tons of crude
per year) in gasoline, diesel fuel, fuel oil

THE ADVANTAGES OF MINI-REFINERIES


 Short time of design and construction;
 Enhanced quality control;
 Use less power consumption;
 Less capital expenditures;
 Less land (area) for the plant;
 Less fieldwork;
 Reduced demand for skilled labour;
 Faster financial statements for the installed plant;
 Increased safety.

Quality =ATTITUDE X (SKILL+KNOWLEDGE) IF A=0, S=100, K=100, Q=0 Page 1 of 3


C7STLV007
246C&D, Bangunan Peguam
Co. Reg. 1208897-U
Batu 2, Jalan Ipoh
51200 Kuala Lumpur, MALAYSIA
Tel: +603 - 4044 5900, Fax: +603 - 4044 1197
CALIFA7SEAS
HOLDING (MALAYSIA) SDN BHD

THE COMPOSITION OF THE FEASIBILITY STUDY


Feasibility study is carried out based on the data and the provisions contained in the plans of socio-economic development
of the state, regional, industry, science and technology, and other government programs, schemes of development of
productive forces, planning documentation (master plans for cities, settlements) as well other documents necessary for the
construction of mini-refineries in the state of the facility. The results of the feasibility study are the basis for decision-
making on economic necessity, technical capabilities, commercial, economic and social viability of investments in the
construction. The composition of the feasibility study for the production facilities shall consist of the following sections:

1. Initial Data
Purpose of investment
Rationale for the construction of the facility
Funding/Sponsor/Financing schemes
Economic benefit expected from the operation of the facility
Place of implementation/project site/location (crude, complex and petrol stations)
Expected sources of crude oils
Type of crude oil by products
Production capability and requirement
Market size
Transportation
Government legislation and etc.

2. Market Evaluation
Evaluation of existing, long-term demand for oil products intended for production
Analysis of the current state of the industry and the socioeconomic needs of the facility
Assessment of commercial risks

3. Power Enterprise
Rationale for the selection policy of sales
Analysis of existing objects in the industry
Development of sales promotions products, nomenclature, primary production and by-products.

4. Enterprise Resource management


Raw materials, energy, labor, financial resources

5. Basic technical and technological solutions


Justification of the chosen technology main and auxiliary production based on a comparison of options processes
according to their level of economic efficiency, safety, resource consumption per unit of production, as well as the
degree of risk, the probability of accidents

6. Basic architectural solutions


Basic architectural, space planning, design solutions

7. Transportation
Rationale for the choice of options of transport schemes, infra-ways, highways and etc.

8. Engineering systems
Selection decisions on energy saving, heat, water, sewage and others

Quality =ATTITUDE X (SKILL+KNOWLEDGE) IF A=0, S=100, K=100, Q=0 Page 2 of 3


C7STLV007
246C&D, Bangunan Peguam
Co. Reg. 1208897-U
Batu 2, Jalan Ipoh
51200 Kuala Lumpur, MALAYSIA
Tel: +603 - 4044 5900, Fax: +603 - 4044 1197
CALIFA7SEAS
HOLDING (MALAYSIA) SDN BHD

9. Environmental Impact Assessment


Assessment of the impact of the project on the environment
Activities of the proposed project to improve the environmental situation

10. Institutional
Information on all participants of the project, their functions and management structure with an estimate of the
financial costs

11. Financial Analysis


Estimates the total investment costs
Calculate the cost of key products
The calculation of income from sales consolidated cash flow calculation analysis of the project using simple methods
of financial evaluation
Analysis of the project using the methods of discounting
Financial analysis under uncertainty
Liquidity analysis of the project
The current financial state of the project participants; analysis of the scheme, sources of financing conditions as their
alternatives; evaluation of financial risks and etc.

12. Economic efficiency of investments


Calculation of cost of construction assessment of the economic benefits, costs
Least-cost analysis
Calculation of economic efficiency of the project;

13. Social section


Need for labor on the categories of workers
The validity of the project in terms of sociology-cultural, demographic characteristics of the population
Standards for the protection, safety
Social Risk Assessment

14. Technical and economic parameters


Data capacity of the facility construction, financial, economic indicators of the project,
Cost parameters of construction
Cost of fixed assets,
Cost of commercial products,
Cost of major products
The estimated construction period

Quality =ATTITUDE X (SKILL+KNOWLEDGE) IF A=0, S=100, K=100, Q=0 Page 3 of 3