(Frequency in time) 10
in years
Surface 1 draining
Surface 1 Surface 2 Surface 3 Surface 2 draining to
to DI
Ref area draining area draining area draining DI Imperviousness
Imperviousness
to DI in m2 to DI in m2 to DI in m2 Factor
Factor
DI#2 to SMH-01
DI#3 to SMH-01
Surface 1 draining
Surface 1 Surface 2 Surface 3 Surface 2 draining to
to DI
Ref area draining area draining area draining DI Imperviousness
Imperviousness
to DI in m2 to DI in m2 to DI in m2 Factor
Factor
DI#2 to SMH-02
DI#3 to SMH-02
Surface 1 draining
Surface 1 Surface 2 Surface 3 Surface 2 draining to
to DI
Ref area draining area draining area draining DI Imperviousness
Imperviousness
to DI in m2 to DI in m2 to DI in m2 Factor
Factor
DI#1 to SMH-03 3500 0.95
DI#2 to SMH-03
DI#3 to SMH-03
Distance from DI
Surface 3 draining to Weighed
to furthest Surface slope Total surface
DI Imperviousness Imperviousness
contributing percentage area in m2
Factor factor
point in m
Weighed
Total surface
Imperviousness
area in m2
factor to SMH-01
2100 0.95
Distance from DI
Surface 3 draining to Weighed
to furthest Surface slope Total surface
DI Imperviousness Imperviousness
contributing percentage area in m2
Factor factor
point in m
Weighed
Total surface
Imperviousness
area in m2
factor to SMH-02
600 0.95
Distance from DI
Surface 3 draining to Weighed
to furthest Surface slope Total surface
DI Imperviousness Imperviousness
contributing percentage area in m2
Factor factor
point in m
70 0.5 3500 0.95
Weighed
Total surface
Imperviousness
area in m2
factor to SMH-03
3500 0.95
Rainfall
Pipe 1 inside
Time intensity
Pipe 1 length Flowrate diameter
concentration according to
Pipe 1 slope (distance according to required for
upstream return period
percentage between DI rational full flow
(overland flow and rainfall
and SMH) in m formula in L/s condition in
time) tc in min duration in
mm
mm/hr
Rainfall
Pipe 1 inside
Time intensity
Pipe 1 length Flowrate diameter
concentration according to
Pipe 1 slope (distance according to required for
upstream return period
percentage between DI rational full flow
(overland flow and rainfall
and SMH) in m formula in L/s condition in
time) tc in min duration in
mm
mm/hr
10 0.50 15 75 69.27 314.09
Pipe 1
Pipe 1 inside
nominal Time concentration
diameter Velocity in the Time in pipe 1
diameter downstream td in
rounded in pipe 1 in m/s in min
rounded in min
mm
mm
Maximum Time
concentration for DI
(critical DI) in min
11
Pipe 1
Pipe 1 inside
nominal Time concentration
diameter Velocity in the Time in pipe 1
diameter downstream td in
rounded in pipe 1 in m/s in min
rounded in min
mm
mm
Maximum Time
concentration for DI
(critical DI) in min
11
Pipe 1
Pipe 1 inside
nominal Time concentration
diameter Velocity in the Time in pipe 1
diameter downstream td in
rounded in pipe 1 in m/s in min
rounded in min
mm
mm
320.00 0.862 0.29 10.29
Maximum Time
concentration for DI
(critical DI) in min
10
Return period
(Frequency in time) 10
in years
Time Rainfall
concentration intensity
Total Flowrate
Weighed upstream according to
surface according to
Pipes between SMH Imperviousness (overland flow return period
area in rational
factor time+time in and rainfall
m2 formula in L/s
pipe 1) tc in duration in
min mm/hr
0.32 10.89
0.12 11.01
0.49 11.50
Legend:
User input
Calculated
Constant from other sheet
Data used for downstream junction
Pipe 1 Pipe between DI and SMH
Pipe 2 Pipe between SMH and SMH
Pipe nominal diameter to be considered
t
d
from other sheet
d for downstream junction
een DI and SMH
een SMH and SMH
nal diameter to be considered in the layout