Week 2 Report Port Mitra

Barito
Periode Feb - Mar 2024
CONTENT

A. SAFETY REPORT
B. NORTH BARITO WATER LEVEL
C. LAYOUT JETTY MITRA BARITO
D. STOCKPILE PORT MB AND ISP KM 17
E. LINE UP BARGE JETTY PORT PARING LAHUNG
F. MONTHLY CARGO LOADED JETTY PARING LAHUNG
G. PRODUCTIVITY RATE JETTY PARING LAHUNG
H. STOPPAGE LOADING
A. SAFETY REPORT
A-1.HEALTH REPORT

Site HEALTH WEEKLY REPORT


KASUS dan penanganan
1.5
Site : Port Mitra Barito Period : Week 2, Maret 2024 1
1
Total persons on site : 9
0.5
CLINICAL WORK / MEDICAL STATISTIC 0 0 0 0 0
0
INJURIES / ILLNESS MEDICAL STATISTICS KASUS BY MASUK RUMAH PEMERIKSAAN DI ISTIRAHAT DI PEMBERIAN DEPRESSION
EMPLOYER
Total MED FAC MT DEN WR NWR RWF RWR SL REF DARURAT SAKIT KLINIK RUMAH OBAT
PT KAPUAS BARA UTAMA 1 1 0 0 0 0 0 0 0 0 0
GRAND TOTAL 1 1 0 0 0 0 0 0 0 0 0 Seri1

TOP 5 DISEASES / INJURIES


Kasus by Darurat Total keluhan arahan

Masuk Rumah Sakit 0 Photo (s) :

Pemeriksaan di Klinik 1 Sakit magh minum obat secara berkala

Istirahat di Rumah 0

Pemberian Obat 0

Depression 0 Shift I Shift II


REFERRAL
Medical Evacuations Emergency 0 Non Emergency 0
Referrals Emergency 0 Non Emergency 0
Response Calls Emergency 0 Non Emergency 0

Health Cehck Alcohol test Positive 0 Negative 0 Drug test Positive : 0 Negative : 0
SARS COVID - 19 Check Positive 0 Total Case -
Health Talk / P5M Total Attendance Date Comments

P5M Shift I 4

P5M Shift II 4

Report & Prepared by : CPP Hauling and Port Dept Signed : David Novianto
B. NORTH BARITO WATER LEVEL
Puruk Muara Paring Teluk
Date Bakanon Pangkuh Terusan
Cahu Teweh Lahung Siwak
03 Mar'24 5.10 7.90 5.80 8.80 7.20 8.50 8.60
04 Mar'24 5.00 8.00 5.60 8.10 6.50 7.90 8.00
05 Mar'24 5.40 8.20 5.30 7.70 6.00 6.50 6.60
06 Mar'24 4.40 8.10 4.80 7.40 5.50 6.10 6.30
07 Mar'24 5.60 8.60 4.60 6.70 5.00 5.40 5.60
08 Mar'24 7.10 9.60 5.80 7.10 5.00 5.20 5.40
09 Mar'24 8.40 10.70 6.80 8.50 5.90 5.40 5.50
C. LAYOUT JETTY MITRA BARITO
D. STOCK PORT MITRA BARITO

CRUSHED COAL STOCK LA.PD


BARGING TGL 06-03-2024 TB CIPTA 2001 7540.097 CRUSHER BARGING
STOK TGL 06-2024 JETTY 1321.685 CRUSHER STOK JETTY
HAULING TGL 07-03-2024 73.000 CRUSHER HAULING
STOK TGL 7-03-2024 JETTY 1,394.685 CRUSHER STOK JETTY

Stok Crushed Coal Port LA.4


HAULING TGL 07-03-2024 1797.590 CRUSHER LA.PD 4 HAULING JETTY
HAULING TGL 08-03-2024 2217.450 CRUSHER LA.PD 4 HAULING JETTY
STOK TGL 08-03-2023 4015.040 CRUSHER LA.PD 4 STOK JETTY
D-1. STOCK PORT ISP KM 17

Stok Crushed Coal KM 17 LA.PD


TOTAL STOK KM 17 TGL 29-02-2024 8321.834 Crushed Coal STOK KM 17
HAULING LANGSIR 06-03-2024 2073.750 Crushed Coal LANGSIR
STOK TGL 06-03-2024 6248.084 Crushed Coal STOK KM 17
HAULING LANGSIR 08-03-2024 41.670 Crushed Coal LANGSIR HAULING KM 17 PORT
STOK KM 17 TGL 8-03-2024 6206.414 Crushed Coal KM 17 STOK
E. LINE UP BARGE JETTY MITRA BARITO
ARRIVED / MOORED LOADING BLENDING
NO DATE CODE TUGBOAT / BARGE ALONGSIDE AT BLC NET TIME CAST OFF LOADED AT CARGO TYPE CARGO QUANTITY
AT TREE COMMENCED COMPLETED CRUSH RAW
1 6 Feb 2024 TOB 12/MANNA LINE 808 2/1/2024 15:00 2/6/2024 9:45 2/6/2024 13:05 2/6/2024 21:00 07:55:00 Wed, 04/01/00 00:00 JETTY 1 BLENDING 7,537.936 MT 5,007.490 MT 2,537.446 MT
2 26 Feb 2024 SUNTER /RANIA 301 2/24/2024 2:00 2/26/2024 8:20 2/26/2024 14:35 2/26/2024 18:30 03:55:00 Mon, 26/02/24 20:10 JETTY 2 LA-PD 7,319.500 MT
3 28 Feb 2024 BINTANG MAULANA/SBS JMB 86 2/24/2024 2:30 2/28/2024 10:00 2/28/2024 12:20 2/28/2024 14:30 02:10:00 Wed, 28/02/24 14:50 JETTY 2 LA-PD 3,082.112 MT
4 29 Feb 2024 DAYA GUNA/ INDOTAMA RIZKINDO 2/28/2024 9:00 2/29/2024 9:50 1/19/2024 13:20 1/19/2024 18:25 05:05:00 Thu, 29/02/24 16:00 JETTY 2 LA-PD 7,501.693 MT
TOTAL CARGO LOADED ON BARGE 25,441.241 MT
TOTAL CARGO CRUSH COAL (FEB 2024) 22,910.795 MT
TOTAL CARGO RAW COAL (FEB 2024) 2,537.446 MT
TOTAL CARGO LOADED ON BARGE (FEB 2024) - MTD 25,441.241 MT

BARGE LINE UP AT JETTY MITRA BARITO, PARING LAHUNG MARET 2024


ARRIVED / MOORED LOADING BLENDING
NO DATE CODE TUGBOAT / BARGE ALONGSIDE AT BLC NET TIME CAST OFF LOADED AT CARGO TYPE CARGO QUANTITY
AT TREE COMMENCED COMPLETED CRUSH RAW
1 2 Mar 2024 TOB 12/MANNA LINE 808 3/2/2024 2:45 3/2/2024 3:15 3/2/2024 7:05 3/2/2024 12:40 05:35:00 Fri, 02/03/00 13:35 JETTY 1 LA-PD 8,146.779 MT
2 3 Mar 2024 MEGA LESTARI VII/BORNEO 3001 3/3/2024 7:30 3/3/2024 8:00 3/3/2024 8:50 3/3/2024 21:40 12:50:00 Sun, 03/03/24 22:20 JETTY 2 LA-PD 8,017.480 MT
3 6 Mar 2024 CIPTA 2001/SATRIA 3001 3/6/2024 11:30 3/6/2024 12:00 3/6/2024 14:20 3/6/2024 19:20 05:00:00 Wed, 06/03/24 20:00 JETTY 2 LA-PD 7,540.097 MT
TOTAL CARGO LOADED ON BARGE 23,704.356 MT
TOTAL CARGO CRUSH COAL (MARET 2024) 23,704.356 MT
TOTAL CARGO RAW COAL (MARET 2024) 0.000 MT
TOTAL CARGO LOADED ON BARGE (MARET 2024) - MTD 23,704.356 MT
F. MONTHLY CARGO BARGING PORT MITRA BARITO
MONHTLY CARGO BARGING 2024
JETTY MITRA BARITO
MONTH TOTAL
CRUSH RAW
January 7,451.170 MT 7,431.995 MT 14,883.165 MT
February 22,910.795 MT 2,537.446 MT 25,448.241 MT
March 23,704.356 MT 23,704.356 MT
April 0.000 MT
May 0.000 MT
June 0.000 MT
July 0.000 MT
August 0.000 MT
September 0.000 MT
October 0.000 MT
November 0.000 MT
Desember 0.000 MT
64,035.762 MT
G. PRODUCTIVITY RATE
TOTAL BARGE LOADED AT JETTY PARING LAHUNG (FEB 2024) : 2
PRODUCTIVITY RATE
DATE CODE TUGBOAT / BARGE CARGO QUANTITY BERTHED CASTED OFF
GROSS NET IDLE TIME (HOUR) THRESHOLD NET 1000 T/H THRESHOLD GROSS 900 T/H

6 Feb 2024 TOB 12/MANNA LINE 808 7,537.936 MT 1,007 T/H 1,189 T/H 01:25:00 OK OK Tue/06/Feb 09:45 Wed/04/Jan 00:00
26 Feb 2024 SUNTER /RANIA 301 7,319.500 MT 593 T/H 1,830 T/H 12:20:00 OK UNDER TARGET Mon/26/Feb 08:20 Mon/26/Feb 20:10
28 Feb 2024 BINTANG MAULANA/SBS JMB 86 3,082.112 MT 578 T/H 1,479 T/H 05:20:00 OK UNDER TARGET Wed/28/Feb 10:00 Wed/28/Feb 14:50
29 Feb 2024 DAYA GUNA/ INDOTAMA RIZKINDO 7,501.693 MT 1,125 T/H 1,667 T/H 06:40:00 OK OK Thu/29/Feb 09:50 Thu/29/Feb 16:00
OVERALL QUANTITY & PRODUCTIVITY RATE 1 FEB - 29 2024) 25,441.241 MT 826 T/H 1,541 T/H 25:45:00 OK OK
OVERALL QUANTITY & PRODUCTIVITY RATE (FEB 2024) -MTD 25,441.241 MT 826 T/H 1,541 T/H 25:45:00 OK OK

TOTAL BARGE LOADED AT JETTY PARING LAHUNG (MARET 2024) : 3


PRODUCTIVITY RATE
DATE CODE TUGBOAT / BARGE CARGO QUANTITY BERTHED CASTED OFF
GROSS NET IDLE TIME (HOUR) THRESHOLD NET 1000 T/H THRESHOLD GROSS 900 T/H

2 Mar 2024 TOB 12/MANNA LINE 808 8,146.779 MT 788 T/H 1,358 T/H 10:20:00 OK UNDER TARGET Sat/02/Mar 03:15 Fri/02/Mar 13:35
3 Mar 2024 MEGA LESTARI VII/BORNEO 3001 8,017.480 MT 288 T/H 621 T/H 12:20:00 UNDER TARGET UNDER TARGET Sun/03/Mar 08:00 Sun/03/Mar 22:20
6 Mar 2024 CIPTA 2001/SATRIA 3001 7,540.097 MT 943 T/H 1,483 T/H 08:00:00 OK OK Wed/06/Mar 12:00 Wed/06/Mar 20:00
OVERALL QUANTITY & PRODUCTIVITY RATE 1 MARET - 31 2024) 23,704.356 MT 673 T/H 1,154 T/H 30:40:00 OK OK
OVERALL QUANTITY & PRODUCTIVITY RATE (MARET 2024) -MTD 23,704.356 MT 673 T/H 1,154 T/H 30:40:00 OK OK
G-1. GRAPH PRODUCTIVITY RATE
H. STOPPAGE LOADING

Period Feb - Mar 2024 MV. BEI DOU STAR Stoppages Loading Normal Gross
Waiting Collect Conveyor Heavy Break Other Final Loading Duration
No Tug Boat/Barge Quantity Initial Shifting Cast Off
WL Cargo Stoppage Rain Down HE Stoppages Draft
1 SUNTER /RANIA 301 7,537.936 00:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 06:00:00 00:10:00 01:30:00 04:00:00 11:50:00
2 BINTANG MAULANA/SBS JMB 86 7,319.500 00:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 02:05:00 00:10:00 00:20:00 02:05:00 04:50:00
3 DAYA GUNA/ INDOTAMA RIZKINDO 3,082.112 00:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:05:00 00:10:00 00:30:00 04:30:00 05:25:00
4 TOB 12/MANNA LINE 808 8,146.779 00:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 03:15:00 00:05:00 00:50:00 06:00:00 10:20:00
5 MEGA LESTARI VII/BORNEO 3001 8,017.480 00:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 05:45:00 00:35:00 00:10:00 00:30:00 07:10:00 14:20:00
6 CIPTA 2001/SATRIA 3001 7,540.097 00:20:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 00:45:00 00:05:00 00:35:00 05:05:00 06:50:00
Total 01:10:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00 05:45:00 12:45:00 00:50:00 04:15:00 28:50:00 53:35:00
H-1. STOPPAGE LOADING

Period FEB - MAR 2024 MV BEI DOU STAR Other Stoppages


Barge Unexpected
No Tug Boat/Barge Quantity Rest Time Change Shift P2H P5M
Inspection Event
1 SUNTER /RANIA 301 7,537.936 00:00:00 00:00:00 00:00:00 00:00:00 06:00:00 00:00:00
2 BINTANG MAULANA/SBS JMB 86 7,319.500 02:05:00 00:00:00 00:00:00 00:00:00 06:00:00 00:00:00
3 DAYA GUNA/ INDOTAMA RIZKINDO 3,082.112 00:00:00 00:00:00 00:00:00 00:00:00 00:50:00 00:00:00
4 TOB 12/MANNA LINE 808 8,146.779 03:15:00 00:00:00 00:00:00 00:00:00 00:00:00 00:00:00
5 MEGA LESTARI VII/BORNEO 3001 8,146.779 00:00:00 00:00:00 00:00:00 00:00:00 00:35:00 00:00:00
6 CIPTA 2001/SATRIA 3001 8,017.480 00:00:00 00:00:00 00:00:00 00:00:00 00:45:00 00:00:00
Total 05:20:00 00:00:00 00:00:00 00:00:00 14:10:00 00:00:00