Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD

(AIRPORT INTERCHANGE) Total 8


CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

1 351583-IR172-PAR-ZAH-GN-RFIA-00001_R00 GN LOCATION CONTROL POINTS 14-Dec-23 ` AAN

MOCK-UP ISNPECTION FOR WM "ARABIC TEXT"


ALIGNMENT AND ORIENTATION (20-40mm, GR2 20-
351583-IR172-PAR-ZAH-GN-RFIA-00002_R00 GN 4-Jan-24 11-Jan-24 AAN
40mm & GR3 20-40mm) AND INSTALLATION ALUMINUM
EDGER

MOCK-UP ISNPECTION FOR WM "ENGLISH TEXT"


351583-IR172-PAR-ZAH-GN-RFIA-00003_R00 GN ALIGNMENT AND ORIENTATION (20-40mm, GR2 20- 4-Jan-24 11-Jan-24 AAN
40mm & GR3 20-40mm)

TEMPORARY ENTRY AND EXIT ARRANGEMENTS FOR


351583-IR172-PAR-ZAH-GN-RFIA-00004_R00 GN 13-Jan-24 19-Jan-24 AAN
LANDSCAPE WORKS AT ZONE 2A AND ZONE 2B

351583-IR172-PAR-ZAH-GN-RFIA-00005_R00 GN REMOVAL OF TREE AT ZONE 2 (LOOP 4) 13-Jan-24 19-Jan-24 20-Jan-24 23-Jan-24 AAN NOT APPROVED

351583-IR172-PAR-ZAH-GN-RFIA-00006_R00 GN SOAKAWAY WATER TABLE AT ZONE 5 13-Jan-24 19-Jan-24 RR NOT APPROVED

351583-IR172-PAR-ZAH-GN-RFIA-00007_R00 GN ESTABLISHMENT OF PROJECT SIGN BOARD 31-Jan-24 8-Feb-24 AAN

351583-IR172-PAR-ZAH-GN-RFIA-00008_R00 GN ACCOMODATION AND BUILDING FOR CONTRACTOR 31-Jan-24 6-Feb-24 RR NOT APPROVED

Page 1 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 2 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 3 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 4 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 5 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 6 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 7 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 6

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 2


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (GENERAL) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248

Page 8 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

1 351583-IR1712-PAR-ZAH-RFIA-HS-00001 HS EXCAVATION (CUTTING) FOR BLINDING CONCRETE 15-Dec-22 20-Dec-23 3-Jan-24 6-Jan-24 ` AAN

SURFACE PREPARATION WITH COMPACTION TO


2 351583-IR1712-PAR-ZAH-RFIA-HS-00002 HS 15-Dec-22 20-Dec-23 3-Jan-24 6-Jan-24 AAN
RECIEVE PERMANENT WORKS AS PER HD

SETTING-OUT FOR BLINDING CONCRETE AS PER


3 351583-IR1712-PAR-ZAH-RFIA-HS-00003 HS 3-Jan-24 6-Jan-24 AAN
ATTACHED HIGHLIGHTED DRAWING

SETTING-OUT FOR BLINDING CONCRETE AS PER


4 351583-IR1712-PAR-ZAH-RFIA-HS-00004 HS 3-Jan-24 6-Jan-24 AAN
ATTACHED HIGHLIGHTED DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


5 351583-IR1712-PAR-ZAH-RFIA-HS-00005 HS 3-Jan-24 6-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

SURFACE PREPARATION WITH COMPACTION TO


6 351583-IR1712-PAR-ZAH-RFIA-HS-00006 HS RECIEVE PERMANENT WORKS (BLINDING CONCRETE) 3-Jan-24 12-Jan-24 AAN
AS PER HD

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


7 351583-IR1712-PAR-ZAH-RFIA-HS-00007 HS 3-Jan-24 6-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

SURFACE PREPARATION WITH COMPACTION TO


8 351583-IR1712-PAR-ZAH-RFIA-HS-00008 HS 3-Jan-24 12-Jan-24 AAN
RECIEVE PERMANENT WORKS (GRAVEL) AS PER HD

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


9 351583-IR1712-PAR-ZAH-RFIA-HS-00009 HS 3-Jan-24 6-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

SURFACE PREPARATION WITH COMPACTION TO


10 351583-IR1712-PAR-ZAH-RFIA-HS-00010 HS 3-Jan-24 12-Jan-24 AAN
RECIEVE PERMANENT WORKS (GRAVEL) AS PER HD

SETTING-OUT FOR GRAVEL AREA AS PER ATTACHED


11 351583-IR1712-PAR-ZAH-RFIA-HS-00011 HS 3-Jan-24 6-Jan-24 AAN
DRAWING

SETTING-OUT FOR GRAVEL AREA AS PER ATTACHED


12 351583-IR1712-PAR-ZAH-RFIA-HS-00012 HS 3-Jan-24 6-Jan-24 AAN
DRAWING

SETTING-OUT FOR GRAVEL AREA AS PER ATTACHED


13 351583-IR1712-PAR-ZAH-RFIA-HS-00013 HS 11-Jan-24 12-Jan-24 RR NOT APPROVED
DRAWING

EXCAVATION FOR BLINDING CONCERETE AS PER


14 351583-IR1712-PAR-ZAH-RFIA-HS-00014 HS 11-Jan-24 12-Jan-24 18-Jan-24 23-Jan-24 AAN
ATTACHED HIGHLIGTED DRAWING

SETTING OUT FOR BLINDING CONCRETE AS PER


15 351583-IR1712-PAR-ZAH-RFIA-HS-00015 HS 16-Jan-24 19-Jan-24 AAN
ATTACHED HIGHLIGHTED DRAWING

EXCAVATION FOR BLINDING CONCERETE AS PER


16 351583-IR1712-PAR-ZAH-RFIA-HS-00016 HS 16-Jan-24 19-Jan-24 AAN
ATTACHED HIGHLIGTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


17 351583-IR1712-PAR-ZAH-RFIA-HS-00017 HS 16-Jan-24 19-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

SETTING OUT FOR GRAVEL AS PER ATTACHED


18 351583-IR1712-PAR-ZAH-RFIA-HS-00018 HS 16-Jan-24 19-Jan-24 AAN
HIGHLIGHTED DRAWING

EXCAVATION FOR GRAVEL AS PER ATTACHED


19 351583-IR1712-PAR-ZAH-RFIA-HS-00019 HS 16-Jan-24 19-Jan-24 AAN
HIGHLIHTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


20 351583-IR1712-PAR-ZAH-RFIA-HS-00020 HS 16-Jan-24 19-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


21 351583-IR1712-PAR-ZAH-RFIA-HS-00021 HS 18-Jan-24 23-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


22 351583-IR1712-PAR-ZAH-RFIA-HS-00022 HS 18-Jan-24 23-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


23 351583-IR1712-PAR-ZAH-RFIA-HS-00023 HS 18-Jan-24 23-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


24 351583-IR1712-PAR-ZAH-RFIA-HS-00024 HS 18-Jan-24 23-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


25 351583-IR1712-PAR-ZAH-RFIA-HS-00025 HS 18-Jan-24 23-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

EXCAVATION (CUTTING) FOR GRAVEL AS PER


26 351583-IR1712-PAR-ZAH-RFIA-HS-00026 HS 18-Jan-24 23-Jan-24 29-Jan-24 31-Jan-24 15-Feb-24 P
ATTACHED HIGHLIHTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


27 351583-IR1712-PAR-ZAH-RFIA-HS-00027 HS 18-Jan-24 23-Jan-24 29-Jan-24 31-Jan-24 15-Feb-24 P
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

FILLING OF SUITABLE EXCAVATED MATERIAL PRIOR


28 351583-IR1712-PAR-ZAH-RFIA-HS-00028 HS 18-Jan-24 23-Jan-24 AAN
TO FORMATION LAYER FOR GRAVEL

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


29 351583-IR1712-PAR-ZAH-RFIA-HS-00029 HS 20-Jan-24 23-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION FOR


30 351583-IR1712-PAR-ZAH-RFIA-HS-00030 HS BLINDING CONCRETE AS PER HIGHLIGTHER 20-Jan-24 23-Jan-24 AAN
DRAWING

EXCAVATION (CUTTING) FOR GRAVEL AS PER


31 351583-IR1712-PAR-ZAH-RFIA-HS-00031 HS 20-Jan-24 23-Jan-24 AAN
ATTACHED HIGHLIHTED DRAWING

Page 9 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

FORMATION LAYER WITH COMPACTION FOR


32 351583-IR1712-PAR-ZAH-RFIA-HS-00032 HS BLINDING CONCRETE AS PER HIGHLIGTHER 20-Jan-24 23-Jan-24 AAN
DRAWING

SETTING OUT FOR GRAVEL AS PER ATTACHED


33 351583-IR1712-PAR-ZAH-RFIA-HS-00033 HS 20-Jan-24 23-Jan-24 29-Jan-24 2-Feb-24 RR NOT APPROVED
HIGHLIGHTED DRAWING

SETTING OUT FOR GRAVEL AS PER ATTACHED


34 351583-IR1712-PAR-ZAH-RFIA-HS-00034 HS 20-Jan-24 23-Jan-24 AAN
HIGHLIGHTED DRAWING

EXCAVATION FOR GRAVEL AS PER ATTACHED


35 351583-IR1712-PAR-ZAH-RFIA-HS-00035 HS 20-Jan-24 23-Jan-24 AAN
HIGHLIHTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


36 351583-IR1712-PAR-ZAH-RFIA-HS-00036 HS PERMANENT WORKS (GRAVEL) AS PER HIGHLIGTHER 20-Jan-24 23-Jan-24 AAN
DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


37 351583-IR1712-PAR-ZAH-RFIA-HS-00037 HS 20-Jan-24 23-Jan-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION TO RECEIVE


38 351583-IR1712-PAR-ZAH-RFIA-HS-00038 HS 20-Jan-24 23-Jan-24 AAN
PERMANENT WORKS AS PER HIGHLIGTHER DRAWING

EXCAVATION FOR CUTTING (BLINDING CONCRETE)


39 351583-IR1712-PAR-ZAH-RFIA-HS-00039 HS 26-Jan-24 31-Jan-24 AAN
ZONE 2 T4.1

SURFACE PREPARATION WITH COMPACTION FOR


40 351583-IR1712-PAR-ZAH-RFIA-HS-00040 HS 26-Jan-24 31-Jan-24 AAN
BLINDING CONCRETE ZONE 2 T4.1

41 351583-IR1712-PAR-ZAH-RFIA-HS-00041 HS SETTING OUT (GRAVEL) ZONE 2 T4.1 26-Jan-24 31-Jan-24 AAN

42 351583-IR1712-PAR-ZAH-RFIA-HS-00042 HS EXCAVATION FOR CUTTING (GRAVEL) Z2 T4.1 26-Jan-24 31-Jan-24 8-Feb-24 14-Feb-24 AAN

SURFACE PREPARATION WITH COMPACTION


43 351583-IR1712-PAR-ZAH-RFIA-HS-00043 HS 26-Jan-24 31-Jan-24 8-Feb-24 14-Feb-24 AAN
(GRAVEL) ZONE 2 T4.1
EXCAVATION FOR CUTTING (BLINDING CONCRETE)
44 351583-IR1712-PAR-ZAH-RFIA-HS-00044 HS 26-Jan-24 31-Jan-24 AAN
ZONE 2 T2.2

SURFACE PREPARATION WITH COMPACTION FOR


45 351583-IR1712-PAR-ZAH-RFIA-HS-00045 HS 26-Jan-24 31-Jan-24 AAN
BLINDING CONCRETE ZONE 2 T2.2

EXCAVATION FOR CUTTING (BLINDING CONCRETE)


46 351583-IR1712-PAR-ZAH-RFIA-HS-00046 HS 26-Jan-24 31-Jan-24 AAN
ZONE 5 RS

SURFACE PREPARATION WITH COMPACTION FOR


47 351583-IR1712-PAR-ZAH-RFIA-HS-00047 HS 26-Jan-24 31-Jan-24 AAN
BLINDING CONCRETE ZONE 5 RS

EXCAVATION FOR CUTTING (BLINDING CONCRETE)


48 351583-IR1712-PAR-ZAH-RFIA-HS-00048 HS 26-Jan-24 31-Jan-24 AAN
ZONE 2 T4.1

SURFACE PREPARATION WITH COMPACTION FOR


49 351583-IR1712-PAR-ZAH-RFIA-HS-00049 HS 26-Jan-24 31-Jan-24 AAN
BLINDING CONCRETE ZONE 2 T4.1

50 351583-IR1712-PAR-ZAH-RFIA-HS-00050 HS SETTING OUT (GRAVEL) ZONE 2 T4.1 26-Jan-24 31-Jan-24 AAN

51 351583-IR1712-PAR-ZAH-RFIA-HS-00051 HS EXCAVATION FOR CUTTING (GRAVEL) Z2 T4.1 26-Jan-24 31-Jan-24 AAN

SURFACE PREPARATION WITH COMPACTION


52 351583-IR1712-PAR-ZAH-RFIA-HS-00052 HS 26-Jan-24 31-Jan-24 AAN
(GRAVEL) ZONE 2 T4.1

53 351583-IR1712-PAR-ZAH-RFIA-HS-00053 HS SETTING OUT (GRAVEL) ZONE 2 LOOP 2 26-Jan-24 31-Jan-24 AAN

54 351583-IR1712-PAR-ZAH-RFIA-HS-00055 HS FILLING OF SOIL FOR GRAVEL ZONE 2 LOOP 2 26-Jan-24 31-Jan-24 RR NOT APPROVED

SURFACE PREPARATION WITH COMPACTION


55 351583-IR1712-PAR-ZAH-RFIA-HS-00056 HS 26-Jan-24 31-Jan-24 8-Feb-24 14-Feb-24 AAN
(GRAVEL) ZONE 2 LOOP 2

56 351583-IR1712-PAR-ZAH-RFIA-HS-00057 HS SETTING OUT (GRAVEL) ZONE 2 T2.2 29-Jan-24 2-Feb-24 RR NOT APPROVED

57 351583-IR1712-PAR-ZAH-RFIA-HS-00058 HS EXCAVATION FOR CUTTING (GRAVEL) ZONE 2 T2.2 29-Jan-24 31-Jan-24 9-Feb-24 16-Feb-24 AAN

SURFACE PREPARATION WITH COMPACTION


58 351583-IR1712-PAR-ZAH-RFIA-HS-00059 HS 29-Jan-24 31-Jan-24 9-Feb-24 16-Feb-24 AAN
(GRAVEL) ZONE 2 T2.2

LYING OF GRAVEL, GR03 (GREY) WITH GEOTEXTILE


59 351583-IR1712-PAR-ZAH-RFIA-HS-00060 HS 31-Jan-24 8-Feb-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

LYING OF GRAVEL, GR01 (RED) WITH GEOTEXTILE AS


60 351583-IR1712-PAR-ZAH-RFIA-HS-00061 HS 31-Jan-24 8-Feb-24 RR NOT APPROVED
PER ATTACHED HIGHLIGHTED DRAWING

LYING OF GRAVEL, GR03 (GREY) WITH GEOTEXTILE


61 351583-IR1712-PAR-ZAH-RFIA-HS-00062 HS 31-Jan-24 8-Feb-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

LYING OF GRAVEL, GR02 (WHITE) WITH GEOTEXTILE


62 351583-IR1712-PAR-ZAH-RFIA-HS-00063 HS 31-Jan-24 8-Feb-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

LYING OF GRAVEL, GR06 (LIGHT BEIGE) WITH


63 351583-IR1712-PAR-ZAH-RFIA-HS-00064 HS GEOTEXTILE AS PER ATTACHED HIGHLIGHTED 31-Jan-24 8-Feb-24 AAN
DRAWING

LYING OF GRAVEL, GR01 (RED) WITH GEOTEXTILE AS


64 351583-IR1712-PAR-ZAH-RFIA-HS-00065 HS 31-Jan-24 8-Feb-24 RR NOT APPROVED
PER ATTACHED HIGHLIGHTED DRAWING

Page 10 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

LYING OF GRAVEL, GR06 (LIGHT BEIGE) WITH


65 351583-IR1712-PAR-ZAH-RFIA-HS-00066 HS GEOTEXTILE AS PER ATTACHED HIGHLIGHTED 31-Jan-24 8-Feb-24 AAN
DRAWING

INTALLATION OF ALUMINUM EDGER AS PER


66 351583-IR1712-PAR-ZAH-RFIA-HS-00067 HS 31-Jan-24 8-Feb-24 RR NOT APPROVED
ATTACHED HIGHLIGHTED DRAWING

INTALLATION OF ALUMINUM EDGER AS PER


67 351583-IR1712-PAR-ZAH-RFIA-HS-00068 HS 31-Jan-24 8-Feb-24 RR NOT APPROVED
ATTACHED HIGHLIGHTED DRAWING

CASTING FOR BLINDING CONCRETE AS PER


68 351583-IR1712-PAR-ZAH-RFIA-HS-00069 HS 31-Jan-24 8-Feb-24 AAN
ATTACHED HIGHLIGHTED DRAWING

CASTING FOR BLINDING CONCRETE AS PER


69 351583-IR1712-PAR-ZAH-RFIA-HS-00070 HS 31-Jan-24 8-Feb-24 AAN
ATTACHED HIGHLIGHTED DRAWING

CASTING OF BLINDING CONCRETE AS PER ATTACHED


70 351583-IR1712-PAR-ZAH-RFIA-HS-00071 HS 1-Feb-24 8-Feb-24 AAN
HIGHLIGGHTED DRAWING

CASTING OF BLINDING CONCRETE AS PER ATTACHED


71 351583-IR1712-PAR-ZAH-RFIA-HS-00072 HS 1-Feb-24 8-Feb-24 AAN
HIGHLIGGHTED DRAWING

CASTING OF BLINDING CONCRETE AS PER ATTACHED


72 351583-IR1712-PAR-ZAH-RFIA-HS-00073 HS 1-Feb-24 8-Feb-24 AAN
HIGHLIGGHTED DRAWING

CASTING OF BLINDING CONCRETE AS PER ATTACHED


73 351583-IR1712-PAR-ZAH-RFIA-HS-00074 HS 1-Feb-24 8-Feb-24 AAN
HIGHLIGGHTED DRAWING

SETTING-OUT FOR GRAVEL AS PER ATTACHED


74 351583-IR1712-PAR-ZAH-RFIA-HS-00075 HS 1-Feb-24 8-Feb-24 AAN
HIGHLIGHTED DRAWING

75 351583-IR1712-PAR-ZAH-RFIA-HS-00076 HS EXCAVATION (CUTTING) FOR GRAVEL 1-Feb-24 8-Feb-24 AAN

FORMATION LAYER WITH COMPACTION TO RECEIVE


76 351583-IR1712-PAR-ZAH-RFIA-HS-00077 HS PERMANENT WORKS (GRAVEL) AS PER HIGHLIGTHED 1-Feb-24 8-Feb-24 AAN
DRAWING

LAYING OF GRAVEL WITH GEOTEXTILE AS PER


77 351583-IR1712-PAR-ZAH-RFIA-HS-00078 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

LAYING OF GRAVEL WITH GEOTEXTILE AS PER


78 351583-IR1712-PAR-ZAH-RFIA-HS-00079 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

LAYING OF GRAVEL WITH GEOTEXTILE AS PER


79 351583-IR1712-PAR-ZAH-RFIA-HS-00080 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

LAYING OF GRAVEL WITH GEOTEXTILE AS PER


80 351583-IR1712-PAR-ZAH-RFIA-HS-00081 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

CASTING OF BLINDING CONCRETE AS PER


81 351583-IR1712-PAR-ZAH-RFIA-HS-00082 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

CASTING OF BLINDING CONCRETE AS PER


82 351583-IR1712-PAR-ZAH-RFIA-HS-00083 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

CASTING OF BLINDING CONCRETE AS PER


83 351583-IR1712-PAR-ZAH-RFIA-HS-00084 HS 2-Feb-24 8-Feb-24 AAN
HIGHLIGTHED DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


84 351583-IR1712-PAR-ZAH-RFIA-HS-00085 HS 6-Feb-24 14-Feb-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION FOR


85 351583-IR1712-PAR-ZAH-RFIA-HS-00086 HS BLINDING CONCRETE AS PER ATTACHED 6-Feb-24 14-Feb-24 AAN
HIGHLIGHTED DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


86 351583-IR1712-PAR-ZAH-RFIA-HS-00087 HS 6-Feb-24 14-Feb-24 AAN
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION FOR


87 351583-IR1712-PAR-ZAH-RFIA-HS-00088 HS BLINDING CONCRETE AS PER ATTACHED 6-Feb-24 14-Feb-24 AAN
HIGHLIGHTED DRAWING

EXCAVATION (CUTTING) FOR GRAVEL AS PER


88 351583-IR1712-PAR-ZAH-RFIA-HS-00089 HS 6-Feb-24 14-Feb-24 RR NOT APPROVED
ATTACHED HIGHLIGHTED DRAWING

SETTING OUT FOR FILLING OF SUITABLE EXCAVATED


89 351574-IR1712-PAR-ZAH-RFIA-HS-00090 HS MATERIAL PRIOR TO FORMATION LAYER FOR 8-Feb-24 P
GRAVEL

SETTING OUT FOR FILLING OF SUITABLE EXCAVATED


90 351574-IR1712-PAR-ZAH-RFIA-HS-00091 HS MATERIAL PRIOR TO FORMATION LAYER FOR 8-Feb-24 16-Feb-24 RR NOT APPROVED
GRAVEL

SETTING OUT FOR BLINDING CONCRETE AS PER


91 351574-IR1712-PAR-ZAH-RFIA-HS-00092 HS 8-Feb-24 P
ATTACHED HIGHLIGHTED DRAWING

EXCAVATION FOR BLINDING CONCERETE AS PER


92 351574-IR1712-PAR-ZAH-RFIA-HS-00093 HS 8-Feb-24 16-Feb-24 AAN
ATTACHED HIGHLIGTED DRAWING

Page 11 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

FORMATION LAYER WITH COMPACTION FOR


93 351574-IR1712-PAR-ZAH-RFIA-HS-00094 HS BLINDING CONCRETE AS PER ATTACHED 8-Feb-24 16-Feb-24 AAN
HIGHLIGHTED DRAWING

SETTING-OUT FOR BLINDING CONCRETE AS PER


94 351574-IR1712-PAR-ZAH-RFIA-HS-00095 HS 15-Feb-24 16-Feb-24 AAN
ATTACHED HIGHLIGHTED DRAWING

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


95 351574-IR1712-PAR-ZAH-RFIA-HS-00096 HS 15-Feb-24 P
AS PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION FOR


96 351574-IR1712-PAR-ZAH-RFIA-HS-00097 HS BLINDING AS PER ATTACHED HIGHLIGHTED 15-Feb-24 P
DRAWING

SETTING-OUT FOR BLINDING CONCRETE AS PER


97 351574-IR1712-PAR-ZAH-RFIA-HS-00098 HS 15-Feb-24 16-Feb-24 AAN
ATTACHED HIGHLIGHTED DRAWING

EXCAVATION (CUTTING) FOR BLINIDING CONCRETE A


98 351574-IR1712-PAR-ZAH-RFIA-HS-00099 HS 15-Feb-24 P
PER ATTACHED HIGHLIGHTED DRAWING

FORMATION LAYER WITH COMPACTION FOR


99 351574-IR1172-PAR-ZAH-HS-RFIA-00100 HS BLINDING AS PER ATTACHED HIGHLIGHTED 15-Feb-24 P
DRAWING

100 351574-IR1172-PAR-ZAH-HS-RFIA-00101 HS SETTING-OUT FOR GRAVEL AT ZONE 2 (T 4.1) 16-Feb-24 P

EXCAVATION (CUTTING) FOR GRAVEL AT ZONE 2 (T


101 351574-IR1172-PAR-ZAH-HS-RFI-00102 HS 16-Feb-24 P
4.1)

FORMATION WITH COMPACTION FOR GRAVEL AT


102 351574-IR1172-PAR-ZAH-HS-RFIA-00103 HS 16-Feb-24 P
ZONE 2 (T 4.1)

SETTING OUT FOR BLINDING CONCRETE AS PER


103 351574-IR1172-PAR-ZAH-HS-RFIA-00104 HS ATTACHED HIGHLIGHTED DRAWING AT ZONE 2 (SH 16-Feb-24 P
4.3)

EXCAVATION (CUTTING) FOR BLINDING CONCRETE


104 351574-IR1172-PAR-ZAH-HS-RFIA-00105 HS AS PER ATTACHED HIGHLIGHTED DRAWING AT ZONE 16-Feb-24 P
2 (SH 4.3)

FORMATION LAYER WITH COMPACTION FOR


105 351574-IR1172-PAR-ZAH-HS-RFIA-00106 HS BLINDING AS PER ATTACHED HIGHLIGHTED 16-Feb-24 P
DRAWING AT ZONE 2 (SH 4.3)

SETTING OUT FOR DECORATIVE GRAVEL AT ZONE 1


106 351574-IR1172-PAR-ZAH-HS-RFIA-00107 HS 20-Feb-24 P
(T 1.2)

EXCAVATION (CUTTING) FOR DECORATIVE GRAVEL


107 351574-IR1172-PAR-ZAH-HS-RFIA-00108 HS 20-Feb-24 P
AT ZONE 1 (T 1.2)

FORMATION WITH COMPACTION FOR DECORATIVE


108 351574-IR1172-PAR-ZAH-HS-RFIA-00109 HS 20-Feb-24 P
GRAVEL AT ZONE 1 (T 1.2)

SETTING OUT FOR DECORATIVE GRAVEL AT ZONE 1


109 351574-IR1172-PAR-ZAH-HS-RFIA-00110 HS 20-Feb-24 P
(T 2.2) - MIRDIF

EXCAVATION (CUTTING) FOR DECORATIVE GRAVEL


110 351574-IR1172-PAR-ZAH-HS-RFIA-00111 HS 20-Feb-24 P
AT ZONE 1 (T 2.2) - MIRDIF

FORMATION WITH COMPACTION FOR DECORATIVE


111 351574-IR1172-PAR-ZAH-HS-RFIA-00112 HS 20-Feb-24 P
GRAVEL AT ZONE 1 (T 2.2) - NIRDIF

SETTING OUT FOR DECORATIVE GRAVEL AT ZONE 1


112 351574-IR1172-PAR-ZAH-HS-RFIA-00113 HS 20-Feb-24 P
(T 2.1) MIRDIF

EXCAVATION (CUTTING) FOR DECORATIVE GRAVEL


113 351574-IR1172-PAR-ZAH-HS-RFIA-00114 HS 20-Feb-24 P
AT ZONE 1 (T 2.1) MIRDIF

FORMATION WITH COMPACTION FOR DECORATIVE


114 351574-IR1172-PAR-ZAH-HS-RFIA-00115 HS 20-Feb-24 P
GRAVEL AT ZONE 1 (T 2.1) MIRDIF

Page 12 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 13 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 14 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

Page 15 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 114
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 81

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 10


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 23
CANCEL(C) 0
TOTAL SUBMITTED 114

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (HARDSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date Date Date Date Date

237
238
239
240
241
242
243
244
245
246
247
248

Page 16 of 247
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM
CLIENT : DUBAI MUNICIPALITY
CONSULTANT : PARSONS
LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C.
Sl.No

SUBMITTAL NO.

1 351574-IR172-PAR-ZAH-RFIA-IRR-00001

2 351574-IR172-PAR-ZAH-RFIA-IRR-00002

3
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
IGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD

USSAIN L.L.C.

CATEGORY

IRR

IRR
SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MO

RFIA-REQUEST

ITEM

SETTING-OUT FOR IRRIGATION MAIN LINE 3 AT ZONE


5 - RASHIDIYA
NEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHAN

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (I


REVISION 00
PLANNED
DATE
OF SUBMITTED
RETURNED DATE
SUBMISSION DATE

16-Feb-24 20-Feb-24

16-Feb-24 20-Feb-24
D (AIRPORT INTERCHANGE)

AND APPROVAL - (IRRIGATION)


EVISION 00 REVISION 01

Submitted Returned
RECEVING COPY
Date Date
Tota
Approved
Approved as no
Revise & Resub
Rejected
Not Submitt
Pending
CANCEL
TOTAL SUB

DATE
ION 01 REVISION 02

Submitted Returned
RECEVING COPY RECEVING COPY
Date Date
Total
Approved ( A )
Approved as noted ( AAN )
Revise & Resubmit ( RR )
Rejected ( D )
Not Submitted (NS)
Pending (P)
CANCEL(C)
TOTAL SUBMITTED

REVISION 03 REVISIO

Submitted Returned Submitted


RECEVING COPY
Date Date Date

`
3/11/2024
REVISION 04 REVISION 05

Returned Submitted Returned


RECEVING COPY
Date Date Date
2
0
0
2
0
0
0
0
2

N 05

STATUS ALERT
RECEVING COPY

RR NOT APPROVED

RR NOT APPROVED
Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 8
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 8

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 0


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 0
CANCEL(C) 0
TOTAL SUBMITTED 8

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (TRIAL PIT) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03
PLANNED

Sl.No
DATE
SUBMITTAL NO. CATEGORY NO-OF PITS ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned
RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
SUBMISSION DATE Date Date Date Date Date Date

14

351583-IR172-PAR-ZAH-TP-
1 TP 14 EXCAVATION FOR TRIAL PITS AT ZONE 2 14-Dec-23 21-12-2023 29-Dec-23 6-Jan-24 4-Jan-24 12-Jan-24 ` AAN
RFIA00001_ROO

351583-IR172-PAR-ZAH-TP-
2 TP SETTING-OUT FOR TRIAL PITS AT ZONE 2 29-Dec-23 4-Jan-24 4-Jan-24 12-Jan-24 AAN
RFIA00002_ROO

351583-IR172-PAR-ZAH-TP-
3 TP SETTING-OUT FOR TRIAL PITS AT ZONE 1 4-Jan-24 6-Jan-24 4-Jan-24 12-Jan-24 AAN
RFIA00003_ROO

351583-IR172-PAR-ZAH-TP-
4 TP EXCAVATION FOR TRIAL PITS AT ZONE 1 29-Dec-23 6-Jan-24 4-Jan-24 12-Jan-24 AAN
RFIA00004_ROO

351583-IR172-PAR-ZAH-TP-
5 TP SETTING-OUT FOR TRIAL PITS AT ZONE 5 4-Jan-24 12-Jan-24 AAN
RFIA00005_ROO

351583-IR172-PAR-ZAH-TP-
6 TP EXCAVATION FOR TRIAL PITS AT ZONE 5 3-Jan-24 12-Jan-24 AAN
RFIA00006_ROO

351574-IR172-PAR-ZAH-TP-
TP SETTING OUT FOR TRIAL PITS AT ZONE 3 8-Feb-24 16-Feb-24 AAN
RFIA00007_ROO

351574-IR172-PAR-ZAH-TP-
TP EXCAVATION FOR TRIAL PITS AT ZONE 3 8-Feb-24 16-Feb-24 AAN
RFIA00008_ROO

26

27

28

29

30

31

32

33

Page 243 of 247


Project Name : IR 172 -LANDSCAPE & IRRIGATION SYSTEM FOR INTERCHANGE OF AL KHAWANEEJ RD WITH MOHD BIN ZAYED ROAD (AIRPORT INTERCHANGE) Total 7
CLIENT : DUBAI MUNICIPALITY Approved ( A ) 0

CONSULTANT : PARSONS Approved as noted ( AAN ) 0

LANDSCAPE CONTRACTOR : ZAID AL HUSSAIN L.L.C. Revise & Resubmit ( RR ) 1


Rejected ( D ) 0
Not Submitted (NS) 0
Pending (P) 6
CANCEL(C) 0
TOTAL SUBMITTED 7

RFIA-REQUEST FOR INSPECTION AND APPROVAL - (SOFTSCAPE) DATE 3/11/2024


REVISION 00 REVISION 01 REVISION 02 REVISION 03 REVISION 04 REVISION 05
PLANNED
Sl.No

DATE
SUBMITTAL NO. CATEGORY ITEM STATUS ALERT
OF SUBMITTED Submitted Returned Submitted Returned Submitted Returned Submitted Returned Submitted Returned
SUBMISSION RETURNED DATE RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY RECEVING COPY
DATE Date Date Date Date Date Date Date Date Date Date

DISPOSAL FOR EXCESS SOIL IN DM DESIGNATED


1 351583-IR172-PAR-ZAH-RFIA-SS-00001 6-Feb-24 8-Feb-24 19-Feb-24 ` P NOT APPROVED
AREAS AS PER HIGHLIGHTED DRAWING AT ZONE 5

DISPOSAL FOR EXCESS SOIL IN DM DESIGNATED


2 351583-IR172-PAR-ZAH-RFIA-SS-00002 6-Feb-24 8-Feb-24 RR NOT APPROVED
AREAS AS PER HIGHLIGHTED DRAWING AT ZONE 5

SETTING OUT FOR PLANTATION AS PER


3 351574-IR172-PAR-ZAH-RFIA-SS-00003 9-Feb-24 14-Feb-24 19-Feb-24 P
HIGHLIGHTED DRAWING AT ZONE 5

SETTING OUT FOR PLANTATION (GROUND COVER


351574-IR172-PAR-ZAH-RFIA-SS-00004 19-Feb-24 P
AND SHRUBS)

EXCAVATION FOR CUTTING (GROUND COVER AND


351574-IR172-PAR-ZAH-RFIA-SS-00005 19-Feb-24 P
SHRUBS)

SETTING OUT FOR PLANTATION AREAS (GROUND


351574-IR172-PAR-ZAH-RFIA-SS-00006 19-Feb-24 P
COVER AND SHRUBS)

EXCAVATION FOR CUTTING (GROUND COVER AND


351574-IR172-PAR-ZAH-RFIA-SS-00007 19-Feb-24 P
SHRUBS)
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248

You might also like