HSE:
- Method of statement
The MOS is very poor in terms of information 07.10.2022 LT/BB/TB/ HT/SS/KE
MA
o Brief description of the equipment installation but no description of the grating and steel
structure dismantling sequences and method of statement .
o The position of a qualified lifting supervisor and it's roles and responsibilities is not described in
the MOS's human resources.
o No information about the transportation of the equipment before the lifting operation (is
transportation part of the operation or not ).
- The sketch is not showing the trajectory of the load (with consideration to the potential obstruction-
tail gas or any other structure)
o In the sketch there is two configurations , one with tail gas and other without (the sketch is
showing only the final vertical position)
o The start and end position of the load with radius and Hight to be clear (especially with the tails
gas presence scenario)
DAP with
- In the top view sketch, the final position of the equipment is interfacing unitsa steel107 D,main
structure 107 E & 107F
beam (If it's the case , how to get the equipment reach the final destination without collusion with the
steel structure)
- In addition to the lifting sketch , a valid lifting plan is required with the annexes
o Lifting equipment documents
o Lifting devices document
o Loaded equipment datasheet justify its wight
DOCUMENT HISTORY & REVISION
- The risk assessment is not specific to the operation
o The risk assessment is not evaluating the dismantling of the grating and steel structure 10
o The RA is not considering the effect of the removal of some steel structure element on the rest of 9
the structure
8
REQUISITION REFERENCE :
Q3510-107D-SCIFCMI-4500001316/1317-Z-Z01-0004
HELP
JESA DOCUMENT NUMBERING SYSTEM Project Nbre Code of Sub-Project Sender Code PO Discipline Code Doc Type Number Order / Rev
Please Refer to Annex Q, L & DC
Procedure . Shall you need help to fill-in
this cover page, please contact JESA
Example (Trigram is unique to each contractor) Q3510 107D SCIFCMI 4500001316/1317 Z Z01 4 00
PRE-NEUTRALIZER UNIT 107D
Summary
I. Object: ............................................................................................................................................. 3
II. Resources: ......................................................................................................................................... 3
I.Object:
This procedure presents the description of the work to be carried out by SCIF within the framework
of the assembly procedure of Reclaim Pre-Neutralizer Tag N° 107DAM01 for Line D.
It is developed in order to describe the different stages in this assembly operation, specifying the
material and human resources implemented for this purpose.
II.Resources:
a) Human resources:
The pre-assembly and assembly work will be carried out by teams composed of:
• 1 Project manager
• 1 Lead Project Engineer:
• 1 Mechanical Engineer
• 1 Construction manager
• 1 Technician preparer
• 1 Topographic surveyor
• 1 Quality controller
• 1 Team leader
• 1 HSE animator
• 2 Mechanic
• 2 Boilermakers
• 2 Helpers
b) Material resources:
According to this statement method, the material resources to complete the work:
• Tir-fore
• Return pulley
• Lifting means (slings, chains, shackles…)
• Dial indicator.
PRE-NEUTRALIZER UNIT 107D
III.Reference documents
In Order to prepare this granulator method statement, we used the following documents as references:
• Annexes:
▪ Annexe A
▪ Annexe B
▪ Annexe G
▪ Annexe X
▪ Annexe Z
Project Manager:
- The main responsible for the well going of the project.
- Assign adequate resources to the needed actions.
- Assure project control and monitoring.
- Assure acquisition of material at needed time.
- Coordinate between the different stakeholders.
- Assign the subcontractors for the needed works.
- Overall responsibility and authority for the total project management.
- Coordination and decisions for the project.
- Administration of the project organization.
- The Consortium representative to client.
- Risk management for overall project management.
Mechanical Engineer:
- Preparing and submitting the necessary documents.
- Review drawings and specification concerning construction.
- Manage the construction meeting and review construction plan.
- Reporting progress of work.
- Prepare and submit internal and external reports.
Construction Manager:
- Execute quality and safety management during construction.
- Ensure site survey is done before the work commencement.
- Recruit the qualified personnel to do the works.
- Coach workers into their best performance.
- Make sur that the work is done following the drawings and specifications.
Quality Manager:
- Preparation, review and approval of the Quality Procedures
- Performance of Worksite evaluation for service (test, examination and commissioning)
- Training of personnel for QMS
- Issuance for Corrective and Preventive Action Request (CAR/PAR)
- Reporting the routine quality activities to the Project Manager.
- Administration, supervision and coordination of Site QC Inspectors
- Site surveillance
- Performance of receiving inspection.
- Maintenance of the records and documents after work completion
- Preparation and review of the Inspection and Test Plan
- Performance of in-process inspection and test
- Control of Non-destructive Testing (NDT)
- Review of Work Procedure for construction
- Coordination of quality problems with the Customer
- Control of measuring and test equipment
- Qualification of Welding Procedure Specification and welder
- Welding material control
- Project inspections review (Initial, end of each phase)
- Review of material requisition
HSE Manager:
- Overall responsibility and authority for site HSE management.
- Establishment and maintenance for HSE system.
- Train, check and verify to ensure that all operations are conducted in safe manner.
- Maintain the safety of site personnel, material and equipment.
- Identification of HSE objectives and responsibilities.
- Planning and organization of hazard identification and environmental reviews.
- Working closely with Engineering, Procurement, Construction and Commissioning to
communicate and promote HSEs objectives and processes through all phases of the project.
- Monitoring of HSE performance and reporting to project management.
PRE-NEUTRALIZER UNIT 107D
VI.Sequences of assembly.
Area(m²) Area(m²)
Drawing Assembly Qty
Unit Global
Plan At 3rd Floor Tos El.109.400_56690 3GR-1 1 0.5 0.5
Plan At 3rd Floor Tos El.109.400_56690 3GR-2 3 1.1 3.2
Plan At 3rd Floor Tos El.109.400_56690 3GR-3 1 1.0 1
Plan At 3rd Floor Tos El.109.400_56690 3GR-4 1 1.1 1.1
Plan At 3rd Floor Tos El.109.400_56690 3GR-5 1 1.2 1.2
Plan At 3rd Floor Tos El.109.400_56690 3GR-6 1 0.9 0.9
Plan At 3rd Floor Tos El.109.400_56690 3GR-7 1 1.2 1.2
Plan At 3rd Floor Tos El.109.400_56690 3GR-8 1 1.9 1.9
Plan At 3rd Floor Tos El.109.400_56690 3GR-9 8 1.0 7.7
Plan At 3rd Floor Tos El.109.400_56690 3GR-10 10 0.9 8.7
Plan At 3rd Floor Tos El.109.400_56690 3GR-11 2 1.0 2
Plan At 3rd Floor Tos El.109.400_56690 3GR-12 3 1.1 3.2
Plan At 3rd Floor Tos El.109.400_56690 3GR-13 6 0.8 5
Plan At 3rd Floor Tos El.109.400_56690 3GR-14 6 1.1 6.7
Plan At 3rd Floor Tos El.109.400_56690 3GR-15 1 1.2 1.2
Plan At 3rd Floor Tos El.109.400_56690 3GR-16 1 0.6 0.6
Plan At 3rd Floor Tos El.109.400_56690 3GR-17 1 0.9 0.9
Plan At 3rd Floor Tos El.109.400_56690 3GR-18 1 1.0 1
Plan At 3rd Floor Tos El.109.400_56690 3GR-19 1 0.8 0.8
Plan At 3rd Floor Tos El.109.400_56690 3GR-20 1 0.7 0.7
Plan At 3rd Floor Tos El.109.400_56690 3GR-21 1 0.9 0.9
Plan At 3rd Floor Tos El.109.400_56690 3GR-22 1 0.6 0.6
Plan At 3rd Floor Tos El.109.400_56690 3GR-23 1 0.5 0.5
Plan At 3rd Floor Tos El.109.400_56690 3GR-24 1 0.7 0.7
Plan At 3rd Floor Tos El.109.400_56690 3GR-25 1 1.2 1.2
PRE-NEUTRALIZER UNIT 107D
Weight Total
Drawing Assembly Qty Profile Lenght
Unit(kg) Weight (kg)
SCRUBBER II-LEVEL 2 2CA-1 1 L90*9 320 3.9 3.9
SCRUBBER II-LEVEL 2 2CV-16 2 L90*9 784 9.6 19.2
SCRUBBER II-LEVEL 2 2CV-106 1 L100*10 2591 39.0 39
SCRUBBER II-LEVEL 2 2CV-107 1 L100*10 2955 44.4 44.4
SCRUBBER II-LEVEL 2 2CV-108 1 L100*10 2789 41.9 41.9
SCRUBBER II-LEVEL 2 2CV-109 1 L100*10 2634 39.6 39.6
SCRUBBER II-LEVEL 2 2CV-110 1 L100*10 1978 29.7 29.7
SCRUBBER II-LEVEL 2 2CV-111 1 L100*10 2885 43.4 43.4
SCRUBBER II-LEVEL 2 2CV-112 1 L100*10 2378 35.7 35.7
SCRUBBER II-LEVEL 2 2CV-113 1 L100*10 3060 46.0 46
SCRUBBER II-LEVEL 2 2PR-13 1 IPE500 6598 629.8 629.8
SCRUBBER II-LEVEL 2 2PR-14 1 IPE500 6598 646.1 646.1
SCRUBBER II-LEVEL 2 2PR-15 1 HEA300 2450 217.5 217.5
SCRUBBER II-LEVEL 2 2PR-36 1 IPE300 3300 177.8 177.8
SCRUBBER II-LEVEL 2 2PR-39 1 IPE300 2548 112.2 112.2
SCRUBBER II-LEVEL 2 2PR-55 1 IPE160 1647 26.0 26
SCRUBBER II-LEVEL 2 2PR-58 1 IPE160 2310 36.4 36.4
PRE-NEUTRALIZER UNIT 107D
Lift and set down the pre-neutralizer equipment (see lifting plan attached).
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
Main activity
Main activity
# Regular inspections of equipment before every use and
records kept.
# Immediate removal and disposal of access equipment
Poor maintenance of access
found to be defective prior to use.
work at elevation equipment (e.g. ladders, steps, P 4 4 16 H E/S 3 1 3 L
scaffolds).
# Suitable personal protective equipment must be
available.
# Scaffold to be built by competent person
matrials certificat
# Equipment to be used only where there is a firm, level
surface
# All equipment to be visually inspected before use and
Inappropriate use of tower scaffolds records kept.
work at elevation P 4 4 16 H E/S/A 3 2 6 M
causing trips and falls. # Appropriate footwear to be worn
# Equipment should be suitably stored after use
# Work at height training to be undertaken
# Work at heigt permit to be implemented
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
# implimentation of Work At Height Permit
# Specific risk assessment to be undertaken prior to all
work at height activities
# Staff not to use furniture or other inappropriate
fixed/mobile structures for working at height.
# Consider use of fall arrest systems depending on nature
work at elevation Falls from height. P 4 3 12 H E/S/W/A 2 2 4 L
of task, equipment and duration
# Adequate and appropriate signs in place to warn of
hazards below work area
# Work scheduled to take place when persons/others are
not in the immediate area.
# Ensure operatives trained to work at height
Poor weather conditions causing
work at elevation P 2 2 4 L A 2 2 4 L
slips. # No work at height to be done outside in poor weather.
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
# Ensure competent crane driver
# Use lifting signals. Barricade
the area and use tag line
# Ensure proper lifting equipment
used
# Don’t stand under suspended
load
# Ensure crane operator, rigger
Lifting Operations Falling object P/F 2 3 6 M E/S/W 2 1 2 L
and signalman have clear
communication (walkie talkie)
# Use tag line and barricade the
area
# Stop work during foul weather
# Ensure adequate lighting prior
to lifting (maint)
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
# Safety Data Sheet (SDS) to be available in Warehouse
Office and consulted as appropriate;
# Only trained, authorised persons allowed in storage
area; notices posted at entrance;
# Corrosives to be stored in designated, hazard labelled
area (location specified); natural ventilation provided via
building design; floor bunding designed to accommodate
vessels up to 1 cubic metre capacity;
# Spill control materials to be kept in designated siding at
store entrance; minimum quantities (specified) to be
maintained; storeman to monitor and re‐order as
required;
# Storeman to inspect corrosives storage area daily for
Burns due to contact of corrosive signs of damaged, bulging or leaking containers and for
hazardous materials P 3 3 9 M E/S/W poor housekeeping; 2 2 4 L
liquid with skin or eyes
# Storeman to inspect incoming containers to ensure they
are compatible, properly labelled and not damaged or
corroded (in line with training provided);
# Minor spills to be handled by storeman
# Personal Protective Equipment for
storeman/operatives:
+Safety footwear, protective clothing, acid‐resistant
gloves
and goggles,
+Powered full‐face respirator with combined filter type
A2B2E1‐P3 available in designated container in
storeroom for use
# Emergency eye‐wash station and safety shower to be
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
# Dispensing to be carried out only by trained operative
# Dispense only at designated location (well ventilated
location, spill tray fitted for spill collection, free of fixed
ignition sources, earthing and bonding facilities provided,
# ALL IGNITION SOURCES TO BE EXCLUDED; use of
mobile phone or other portable electrical equipment
prohibited; warning notices posted);
# Only dispense into special safety containers provided
for flammable liquids, suitably labelled and fitted with
selfclosing spring‐loaded cap and flame arrestor;
dispensing into open‐topped cans/buckets not permitted!
# Metal containers to be earthed and bonded before
Fire and health effects due to commencing;
hazardous materials skin/eye contact with solvents, P 5 3 15 H E/S/W # Dispense from only one container at a time; 3 1 3 L
inhalation of vapour # Open containers must not be left unattended
# Ensure both containers are securely closed when
dispensing is complete
# Liquid spills to be cleaned up immediately
# Mandatory Personal Protective Equipment (PPE) for
operative
as follows –
o Anti‐static safety footwear;
o protective chemical‐resistant clothing (type/code
specified);
o solvent‐resistant gloves (type/code specified); and
o goggles (type/code specified);
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
equipement and accessery lifting are in good
condition
documentation are in place (certificat,,,)
respect of load limite
respect of center of gravity
regger or a competent person
Assembly and disassembly falling object /falling from height P/F 4 3 12 H W/S/A/E 3 1 3 L
only the autorised person can accede to the work
area
supervision in place
Wearing the anti fall system permanently
housekeeping and rangement
free axces and compliant work platform
erection and disassembly is carried out as per
training and manifatures instrations and supervised
Assembly and disassembly collapse /topple over 3 3 9 M W/S/A/E by a competent person 3 2 6
the fondation is firm,level, and capable of sustaining
the loads imposed
# Use proper tug line
Assembly and disassembly Pinch Points: Hand & Finger Injuries P 4 2 8 M E/S 3 1 3 L
# Wear appropriate PPEs
respect of load limit (25kg)
gesture and posture
Assembly and disassembly back pain and low back pain P 2 1 2 L W/S 2 1 2 L
trainig and awernesses
safety signs
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
equipement and accessery lifting are in good
condition
documentation are in place (certificat,,,)
respect of load limite
respect of center of gravity
regger or a competent person
loading and inloading fulling object /falling from height P/F 4 3 12 H W/S/A/E 3 2 6 M
only the autorised person can accede to the work
area
supervision in place
Wearing the anti fall system permanently
housekeeping and rangement
free axces and compliant work platform
free axces compliant work platform
housekeeping and arrangement
loading and inloading slips and trips 2 1 2 L W/S wearing adequate PPE 2 1 2 L
respect of the safety instructions
all openings will be protected and controled
respect of load limit (25kg)
gesture and posture
loading and inloading back pain and low back pain P 2 1 2 L W/S 2 1 2 L
trainig and awernesses
safety signs
pe
Ref.
Risk
Risk
Ty
Assessment Assessment
t
Activity or Element Hazards Controls
e
Number
ol
ss
tr
A
on
S P L S P L
C
Control Type: D = Design, E = Engineering control, S = Safety device, W = Warning device, A = Administrative
Asset: P = Personnel, F = Facilities and equipment, E = Environment
control
Productivity Severity
Environment Property Personnel 1 2 3 4 5
or Downtime Level
Fatality or
Permanent damage beyond project total
> 2 weeks
boundary
Total facility loss
perm anent
5 5 10 15 20 25
disability