Professional Documents
Culture Documents
Quotation
To Jordan LNG LLC From Jereh Oil & Gas Engineering Corporation
Dear Sir,
We are pleased to offer you the quotation as the following:
Master computer
computer up-grade from standalone to company group network SET 1 $508.46 $508.46
Communication cable from Phase I to II Fiber cable METER 150 $1.69 $253.50
Operation pannel
Industrial computor;
Screen;
Phase II Computor Encryption plug-in; SET 1 $21,470.20 $21,470.20
Software developing;
network switches
Industrial computor;
Dispenser Software backend Screen; SET 1 $15,537.19 $15,537.19
Software developing
PCI;
Hardware IC Card reader; SET 1 $1,356.11 $1,356.11
IC Card
2*2*1.5(485
Communication cable from dispenser to control room METER 3000 $3.05 $9,150.00
communication)
1/2
Jereh Oil & Gas Engineering Corporation
No.9 Jereh Road, Laishan District, Yantai, China
Tel: +86-186 11472826 Fax: +86-535-6723171
E-mail: Albert.shao@jereh.com http://www.jereh.com
Quotation
To Jordan LNG LLC From Jereh Oil & Gas Engineering Corporation
Dear Sir,
We are pleased to offer you the quotation as the following:
Notes:
1. Customer provide the control room and the detailed drawings for Jereh reference, the quoted updated control system display the master computer
information of Phase I and II;(on separate screens)
2. The two phase control pannels will be located in the Phase II control room, and together with the master computer display, the control pannel will be
capable of alarming, trip indicating, ESD or mannually shut down.
3. A dispenser management system is added, covering the totally 5 sets of refuling dispenser and 10 sets loading dispensing pole, system integrated and
display on two sets of computer, it is capable of handling the refueling/loading data collection/statistic/inquire/reporting.
4. Jereh will provide installation guide, and Customer shall be responsible of construction/manpower/fiber welding tools/manpower.
5. Jereh will send an IE engineer to the site for debugging, air tickets and accommodation need to be provided by the customer.
Commercial Items:
· Delivery Terms The items will be ready for shipping in Jereh China Facility within 3 months after receiving the down payment.
· Payment Terms 30% advance payment should be paid along with PO; 70% balance payment should be paid before shipment.
· Remarks All quotations, contracts, and orders are subject to our general terms and conditions.
http://www.jereh.com/en/upload/Terms-and-Conditions.pdf
Quoted by: Jereh Oil & Gas Engineering Corporation Approved by: Jordan LNG LLC
Authorized
Authorized Signature:
Signature:
Date: Date:
1/2