Professional Documents
Culture Documents
For Elevated Station structures, superimposed dead load shall consist of,
According to Employer’s Requirements, Cl. 11.6, Table A5.11, the LRV load shall not be less than half
of type RL loading, in accordance with BS 5400-2:2006.
Also, the vertical train loads shall be considered as per the manufacturer vehicle in accordance with
Returnable T5.3-B3, Cl. 6.1.2.2. Rail vehicle configuration and axle loads shall be confirmed by Rolling
Stock Supplier.