DESIGN CALCULATION AN0034 16-10-2000


Shair and Partners
SHEET
Sheet No. Computed by

1 of 1 R.G.H
Checked by Approved by
Subject N'gangula maternity in Luanda

U - values J.L J.L

Partitions

Plaster
Concrete Hollow
Block

1.2cm x cm 1.2cm

Material R-Values (°F.ft2.hr/Btu) Comments

Indoor Air Film 0.68 Horizontal Heat Flow


1.2cm Plastering (Cement Plaster) 0.1 0.2 / inch
10 cm Hollow Concrete Block 0.71 0.91 6", 1.11 8"
1.2 cm Plastering 0.1
Indoor Air Film 0.68 Horizontal Heat Flow

For 10 cm Block RT = 2.3 °F.ft2.hr/Btu => U= 0.44 Btu/ hr.°F.ft2


U= 2.50 W/ m2.°K

For 15 cm Block RT = 2.5 °F.ft2.hr/Btu => U= 0.40 Btu/ hr.°F.ft2


U= 2.30 W/ m2.°K

For 20 cm Block RT = 2.7 °F.ft2.hr/Btu => U= 0.37 Btu/ hr.°F.ft2


U= 2.12 W/ m2.°K
Project No. Date

DESIGN CALCULATION Tk0002 11-04-2000


Shair and Partners
SHEET
Sheet No. Computed by

1 of 1 R.G.H
Checked by Approved by
Subject Sogutozu Business Center and TV station

U - values J.L J.L

Partitions

Plaster
Concrete

1.2cm x cm 1.2cm

Material R-Values (°F.ft2.hr/Btu) Comments

Indoor Air Film 0.68 Horizontal Heat Flow


1.2cm Plastering (Cement Plaster) 0.1 0.2 / inch
20 cm Concrete 0.63 0.08 / inch
1.2 cm Plastering 0.1
Indoor Air Film 0.68 Horizontal Heat Flow

20 cm Concrete RT = 2.2 °F.ft2.hr/Btu => U= 0.46 Btu/ hr.°F.ft2


U= 2.59 W/ m2.°K

35 cm Concrete RT = 2.7 °F.ft2.hr/Btu => U= 0.38 Btu/ hr.°F.ft2


U= 2.13 W/ m2.°K

60 cm Concrete RT = 3.5 °F.ft2.hr/Btu => U= 0.29 Btu/ hr.°F.ft2


U= 1.64 W/ m2.°K