Report for D-Sheet Piling 22.

2
Design of Diaphragm and Sheet Pile Walls
Developed by Deltares

Date of report: 27/09/2023


Time of report: 3:18:33
Report with version: 22.2.2.38813

Date of calculation: 02/09/2023


Time of calculation: 4:06:18
Calculated with version: 22.2.2.38813

File name: TFM_1.2(Robert+CUR)+Anchor+Ex-10m

Project identification: TFM


Excavacion con C,phi, delta+Stage+Pile lenght
D-Sheet Piling 22.2

1 Construction Stage 4: 4_Dragado final

1.1 Calculation Results

Number of iterations: 9

1.1.1 Charts of Moments, Forces and Displacements

Moments/Forces/Displacements - Stage 4: 4_Dragado final


Bending Moments [kNm] Shear Forces [kN] Displacements [mm]

0 0 0
Relleno
-2 -2 -2
Peat, mod pl, moderate
-4 -4 -4
Sand, ve sil, loose

-6 -6 -6
Sand, sl sil, moderate
-8 -8 -8
Sand, ve sil, loose
-10 -10 -10
Depth [m]

Depth [m]

Depth [m]
-12 AZ 44-700N (S430) -12 -12
Sand, sl sil, moderate
Sand, sl sil, moderate

-14 -14 -14

-16 Sand, ve sil, loose Sand, ve sil, loose -16 -16

Loam, ve san, stiff Loam, ve san, stiff


-18 -18 -18

-20 Clay, sl san, moderate Clay, sl san, moderate -20 -20

-22 -22 -22

Loam, ve san, stiff Loam, ve san, stiff


-24 -24 -24

-2000 -1000 0 1000 2000 -400 -200 0 200 400 -1000 -500 0 500 1000 1500

Max: 0,0 - Min: -1891,2 Max: 370,3 - Min: -268,8 Max: 1101,4

1.1.2 Moments, Forces and Displacements

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
1 1,50 0,00 0,00 1101,4
1 1,00 -0,10 -0,63 1064,4
2 1,00 -0,10 -0,63 1064,4
2 0,00 -2,83 -5,66 990,5
3 0,00 -2,83 -5,66 990,5
3 -1,00 -12,73 -14,62 916,5
4 -1,00 -12,73 -14,62 916,5
4 -1,90 -30,45 -25,13 850,0
5 -1,90 -30,45 -25,13 850,0
5 -2,80 -58,65 -37,94 783,7
6 -2,80 -58,65 -37,94 783,7
6 -3,24 -77,78 -49,04 751,3
7 -3,24 -77,78 -49,04 751,3
7 -4,12 -128,89 -67,56 686,7
8 -4,12 -128,89 -67,56 686,7
8 -5,00 -197,49 -88,81 622,6
9 -5,00 -197,49 -88,81 622,6
9 -5,24 -219,55 -95,08 605,2
10 -5,24 -219,55 -95,07 605,2
10 -6,24 -327,36 -121,10 533,5
11 -6,24 -327,37 -121,05 533,5
11 -7,24 -462,79 -150,32 463,1

27/09/2023 TFM_1.2(Robert+CUR)+Anchor+Ex-10m Page 2


D-Sheet Piling 22.2

Segment Level Moment Shear force Displacement


number [m] [kNm] [kN] [mm]
12 -7,24 -462,80 -150,23 463,1
12 -8,24 -629,01 -182,74 394,8
13 -8,24 -629,01 -182,73 394,8
13 -9,24 -830,88 -221,60 329,2
14 -9,24 -830,86 -221,44 329,2
14 -10,00 -1010,18 -250,77 281,7
15 -10,00 -1010,19 -250,61 281,7
15 -11,31 -1356,60 -266,01 206,1
16 -11,31 -1356,60 -266,18 206,1
16 -12,62 -1675,27 -208,08 140,5
17 -12,62 -1675,27 -208,17 140,5
17 -13,93 -1869,78 -76,54 87,2
18 -13,93 -1869,82 -76,50 87,2
18 -15,24 -1843,96 126,35 47,7
19 -15,24 -1843,88 126,64 47,7
19 -16,24 -1649,82 261,34 26,7
20 -16,24 -1649,87 261,51 26,7
20 -17,24 -1341,27 346,89 12,8
21 -17,24 -1341,26 347,16 12,8
21 -18,24 -977,38 368,39 4,7
22 -18,24 -977,34 368,42 4,7
22 -19,24 -634,90 309,97 0,8
23 -19,24 -634,90 309,87 0,8
23 -20,24 -365,36 227,34 -0,3
24 -20,24 -365,36 227,28 -0,3
24 -21,24 -180,97 142,30 0,2
25 -21,24 -180,97 142,26 0,2
25 -22,49 -53,99 64,60 1,9
26 -22,49 -53,99 64,58 1,9
26 -23,75 -6,71 16,12 4,0
27 -23,75 -6,71 16,11 4,0
27 -25,00 0,00 0,00 6,2
Max -1869,82 368,42 1101,4
Max, minor nodes incl. -1891,23 370,30 1101,4

1.1.3 Charts of Stresses

Stress States - Stage 4: 4_Dragado final


Water Pressure [kN/m²] Resulting Stress [kN/m²] Effective Stress [kN/m²]

0 0 0
Relleno
-2 -2 -2
Peat, mod pl, moderate
-4 -4 -4
Sand, ve sil, loose

-6 -6 -6
Sand, sl sil, moderate
-8 -8 -8
Sand, ve sil, loose
-10 -10 -10
Depth [m]

Depth [m]

Depth [m]

-12 AZ 44-700N (S430) -12 -12


Sand, sl sil, moderate
Sand, sl sil, moderate
-14 -14 -14

-16 Sand, ve sil, loose Sand, ve sil, loose -16 -16

Loam, ve san, stiff Loam, ve san, stiff


-18 -18 -18

-20 Clay, sl san, moderate Clay, sl san, moderate -20 -20

-22 -22 -22

Loam, ve san, stiff Loam, ve san, stiff


-24 -24 -24

300 200 100 00 100 200 300 -200 -100 0 100 200 300 200 100 00 100 200 300

Maximum left: 245,3 Max. eff. stress: 171,9 Maximum left: 148,3
Maximum right: 245,3 Max. tot. stress: 171,9 Maximum right: 227,8

27/09/2023 TFM_1.2(Robert+CUR)+Anchor+Ex-10m Page 3


D-Sheet Piling 22.2

1.1.4 Stresses

Node Level Left Right


number Effective Stress Water stress Stat* Mob** Effective Stress Water stress Stat* Mob**
[m] [kN/m²] [kN/m²] [%] [kN/m²] [kN/m²] [%]
1 1,50 0,00 0,00 A 0,00 0,00 -
1 1,00 2,51 0,00 A 0,00 0,00 -
2 1,00 2,51 0,00 A 0,00 0,00 -
2 0,00 7,54 0,00 A 0,00 0,00 -
3 0,00 7,54 0,00 A 0,00 0,00 -
3 -1,00 10,39 9,81 A 0,00 9,81 -
4 -1,00 10,39 9,81 A 0,00 9,81 -
4 -1,90 12,95 18,64 A 0,00 18,64 -
5 -1,90 12,95 18,64 A 0,00 18,64 -
5 -2,80 15,52 27,47 A 0,00 27,47 -
6 -2,80 25,02 27,47 A 0,00 27,47 -
6 -3,24 25,46 31,78 A 0,00 31,78 -
7 -3,24 19,49 31,78 A 0,00 31,78 -
7 -4,12 22,58 40,42 A 0,00 40,42 -
8 -4,12 22,60 40,42 A 0,00 40,42 -
8 -5,00 25,70 49,05 A 0,00 49,05 -
9 -5,00 25,70 49,05 A 0,00 49,05 -
9 -5,24 26,55 51,40 A 0,00 51,40 -
10 -5,24 24,41 51,40 A 0,00 51,40 -
10 -6,24 27,66 61,21 A 0,00 61,21 -
11 -6,24 27,65 61,21 A 0,00 61,21 -
11 -7,24 30,89 71,02 A 0,00 71,02 -
12 -7,24 30,89 71,02 A 0,00 71,02 -
12 -8,24 34,13 80,83 A 0,00 80,83 -
13 -8,24 37,11 80,83 A 0,00 80,83 -
13 -9,24 40,63 90,64 A 0,00 90,64 -
14 -9,24 37,36 90,64 A 0,00 90,64 -
14 -10,00 39,82 98,10 A 0,00 98,10 -
15 -10,00 39,82 98,10 A 0,00 98,10 P
15 -11,31 44,07 110,95 A 60,36 110,95 P
16 -11,31 44,06 110,95 A 60,36 110,95 P
16 -12,62 48,31 123,80 A 120,72 123,80 P
17 -12,62 48,29 123,80 A 120,72 123,80 P
17 -13,93 52,55 136,65 A 181,08 136,65 P
18 -13,93 52,53 136,65 A 181,08 136,65 P
18 -15,24 56,79 149,50 A 226,96 149,50 3 94
19 -15,24 61,74 149,50 A 197,61 149,50 3 94
19 -16,24 65,27 159,31 A 200,22 159,31 3 80
20 -16,24 58,74 159,31 A 161,66 159,31 2 54
20 -17,24 61,61 169,12 A 115,94 169,12 1 34
21 -17,24 61,60 169,12 A 115,94 169,12 1 34
21 -18,24 89,14 178,93 1 72,17 178,93 1 19
22 -18,24 110,11 178,93 1 73,98 178,93 1 25
22 -19,24 134,84 188,74 1 59,61 188,74 1 18
23 -19,24 134,74 188,74 1 59,61 188,74 1 19
23 -20,24 145,62 198,55 1 17 59,09 198,55 1
24 -20,24 145,51 198,55 1 17 59,09 198,55 1
24 -21,24 148,33 208,36 1 66,63 208,36 1 18
25 -21,24 129,68 208,36 1 58,38 208,36 1 12
25 -22,49 126,00 220,66 1 74,79 220,66 1 13
26 -22,49 125,82 220,66 1 74,79 220,66 1 13
26 -23,75 119,65 232,95 1 93,68 232,95 1 15
27 -23,75 119,46 232,95 1 93,68 232,95 1 15
27 -25,00 112,88 245,25 1 112,97 245,25 1 17

Stat* Status (A=active, P=passive, Number is branche, 0 is unloading)


Mob** Percentage passive mobilized

27/09/2023 TFM_1.2(Robert+CUR)+Anchor+Ex-10m Page 4


D-Sheet Piling 22.2

1.1.5 Percentage Mobilized Resistance

Horizontal soil pressure Left Right


[kN] [kN]
Effective 1570,8 1570,0
Water 3065,6 3065,6
Total 4636,4 4635,6

Maximum effective resistance at left side 17787,97 kN


Mobilized effective resistance at left side 1570,78 kN
Percentage mobilized resistance at left side 8,8 %

Maximum effective resistance at right side 4745,80 kN


Mobilized effective resistance at right side 1569,96 kN
Percentage mobilized resistance at right side 33,1 %

1.1.6 Vertical Force Balance

Xi factor 1,39
Partial factor base resistance 1,20
Maximum point resistance 6,330 [MPa]

Vertical force balance unplugged Force


[kN]
Vertical force active -486,71
Vertical force passive 497,99
Resulting vertical force (no dead weight) 11,28
Vertical toe capacity Rb;d 103,60
Resultant goes up

Vertical force balance plugged Force


[kN]
Vertical force active -486,71
Vertical force passive 497,99
Resulting vertical force (no dead weight) 11,28
Vertical toe capacity Rb;d 1897,48
Resultant goes up

1.1.7 Vertical Force Balance - Contribution per Layer

Left Right
Level Layer Contribution Level Layer Contribution
[m] name [kN] [m] name [kN]
3,50 Relleno -13,81 0,00 Peat, mod pl, m... 0,00
-2,80 Peat, mod pl, m... -1,96 -3,24 Sand, ve sil, loose 0,00
-3,24 Sand, ve sil, loose -13,78 -5,24 Sand, sl sil, mo... 0,00
-5,24 Sand, sl sil, mo... -28,53 -8,24 Sand, ve sil, loose 0,00
-8,24 Sand, ve sil, loose -11,64 -9,24 Sand, sl sil, mo... 204,79
-9,24 Sand, sl sil, mo... -91,77 -15,24 Sand, ve sil, loose 59,35
-15,24 Sand, ve sil, loose -19,02 -16,24 Loam, ve san, stiff 78,59
-16,24 Loam, ve san, stiff -43,27 -18,24 Clay, sl san, mo... 49,92
-18,24 Clay, sl san, mo... -110,47 -21,24 Loam, ve san, stiff 105,34
-21,24 Loam, ve san, stiff -152,47

End of Report